Building work price list: Removal of old wooden parquet flooring (nailed, bitumen-bonded)
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Flooring cost | ||||
| Remove old nailed/glued wood parquet flooring | m² | €12.00 / m² | m² | enter quantity- |
| Careful removal of old parquet to laying plan | m² | €5.10 / m² | m² | enter quantity- |
| Install laminate flooring | m² | €12.50 / m² | m² | enter quantity- |
| Install click vinyl flooring | m² | m² | - | |
| Install click/lock engineered wood flooring | m² | €12.50 / m² | m² | enter quantity- |
| Full-bond solid/engineered wood flooring | m² | €12.00 / m² | m² | enter quantity- |
| Install underfloor heating (electric mat) | m² | m² | - | |
| Install parquet blocks | m² | m² | - | |
| Install Chevron parquet flooring | m² | m² | - | |
| Install and bond original parquet blocks (reclaimed/repaired) | m² | m² | - | |
| Sand and 3x lacquer parquet flooring | m² | m² | - | |
| Sand, fill and 3x lacquer parquet flooring (complete) | m² | €30.00 / m² | m² | enter quantity- |
| Install skirting boards | lm | €4.00 / lm | lm | enter quantity- |
| Caulking around skirting boards | lm | €1.90 / lm | lm | enter quantity- |
| Install transition strips | pcs | €8.00 / pcs | pcs | enter quantity- |
When to remove parquet and when sanding is enough
Removal is needed when the parquet has cupped, cracked or is coming loose and sanding would no longer help. The other reason is that a different floor is planned: vinyl, laminate, tiles or new parquet. If the timber is sound and well fixed, sanding and refinishing is worth considering first. It is a smaller job and the original floor stays.
Removal makes sense mainly in these cases:
- blocks move, rattle or come out over a large area,
- the parquet is cupped, blackened or soft after a leak,
- after several sandings only a thin wear layer remains above the tongue,
- the new floor must not be laid over old timber, for example tiles or glued-down vinyl,
- the floor level needs to be lowered or matched between rooms.
Nailed or bonded: how to find out what you have
The fixing method determines the tools, the labour and the condition of the base after removal. The easiest check is to take off a threshold strip or lift one loose block by the wall and look underneath.
- Nailed parquet usually sits on a timber base, such as floorboards or sub-boards in older houses. Thin nails are driven at an angle through the tongue on the side of the blocks. The work is quicker, but care is needed not to damage the timber base underneath.
- Bitumen-bonded parquet is typical of older blocks of flats. Under the block there is a black, hard, often shiny layer on the concrete screed. Bitumen holds very firmly and has to be removed from the base after the blocks are lifted.
- Parquet bonded with modern adhesive has a lighter, flexible or hard adhesive underneath. The method is similar to bitumen, but the residue behaves differently when sanded.
Traditional strip or block parquet is usually about 15 to 22 mm thick, thin mosaic parquet around 8 mm. For bonded floors, add the layer of bitumen or adhesive, typically a few millimetres. The floor level drops by that amount after removal.
One flat often has more than one fixing method, for example repaired areas around radiators or in the hallway. It is therefore worth checking under the parquet in several rooms, not just one.
What to decide before work starts
Removal is only the first step. How thoroughly the base must be cleaned and what happens to it next depends on the new floor. Before ordering the work, clarify:
- What the new floor will be. Floating laminate flooring tolerates more than glued vinyl or tiles, where the new adhesive needs a clean, sound base. This decides how much bitumen has to be removed. The new floor manufacturer's technical data sheet is decisive.
- Whether the parquet should be saved. Careful dismantling of nailed blocks for reuse has to be agreed in advance, otherwise they are lifted regardless of damage.
- The height of the new floor. Removal lowers the floor by the thickness of the parquet, and the new floor raises it again. Think about thresholds, the transition to the bathroom or kitchen and whether doors will need trimming.
- Who prepares the base and takes away the waste. Levelling the base is a separate job. It helps to know whether the same contractor will do it or another tradesperson will follow, and who arranges removal of the blocks and bitumen residue.
How to remove parquet step by step
- Preparing the room: furniture and rugs are taken out, skirting boards and threshold strips are removed.
- Protecting the surroundings: doors and door linings are covered with protective film or cardboard to prevent scuffing. If doors will later be trimmed to the new floor height, it is best to take them off now. The room is sealed off from the rest of the home with plastic sheeting.
- Checking the fixing: the first block by the wall is lifted to confirm whether the parquet is nailed, bitumen-bonded or glued with another adhesive.
- Lifting nailed parquet: work starts by a wall or in a corner where the blocks lift most easily. The first row is levered up with a pry bar and further blocks are released row by row. Valuable old parquet can be dismantled carefully in the reverse order of laying and reused.
- Lifting bonded parquet: blocks are chipped off with a bolster chisel or wide scraper, often using a breaker with a scraper blade. The blocks break in the process, so reuse is usually not possible.
- Nails and staples: nails left in the base are pulled out or punched down so that nothing sticks up.
- Removing bitumen or adhesive: this is done mechanically, with a scraper and a floor grinder with dust extraction, or with an adhesive remover used according to the manufacturer's instructions.
- Vacuuming: the base is swept and vacuumed thoroughly so that its real condition can be seen.
- Assessing the base: it is checked that the base is sound, dry and flat enough. This decides whether local repairs with levelling compound are enough, a full self-levelling screed is needed, or for a timber base, for example, OSB boards.
- Removing the waste: blocks and bitumen residue are taken to a skip or the household waste recycling centre. Before you hand over a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
What affects the price
The guide price for labour is €12.00 per m². The actual cost can move either way depending on what is found under the parquet:
- Fixing method: nailed parquet is the simplest case and tends to be at the lower end. Bitumen and hard adhesives are much slower, and the labour can increase several times over.
- Thickness and amount of bitumen: the more remains on the screed, the longer the grinding takes. A thick layer of bitumen clogs abrasive discs, so material consumption also rises.
- Required cleanliness of the base: simply lifting the blocks for a floating floor is very different from grinding bitumen almost back to bare concrete for glued vinyl or tiles. The second case takes noticeably longer.
- Room shape: a large rectangular room goes quickly, a hallway with many corners, door linings and radiators slowly. Small and awkward areas come out more expensive per m².
- Condition of the base: a soft or crumbly screed is easily damaged when chipping, so more care is needed. Rusty nails snap and slow down extraction.
- Careful dismantling: if the blocks are to be kept, the work is slower than ordinary removal.
- Tar-based adhesive: if testing confirms harmful substances, removal requires a stricter method and the waste is disposed of as hazardous, which raises the price considerably.
- Access and waste: an upper floor without a lift and carrying out bags extend the job. Waste removal and disposal charges are often listed separately in quotes.
- Follow-on work: levelling the base or trimming doors is not part of removal and is priced separately.
When comparing quotes, check whether the price includes bitumen removal, carrying out and waste removal, or only lifting the blocks.
What makes the job easier and what slows it down
A lot of time can be saved by organising things before the tradesperson arrives:
- the room is completely cleared, not just furniture pushed to the middle,
- a skip is booked and its position agreed with the managing agent or the council where needed,
- the lift is reserved for carrying out waste, if possible, and the communal corridor is protected,
- a working socket on a suitably rated circuit is close by for the grinder and vacuum,
- neighbours and the managing agent know when the noisy work will take place,
- the tradesperson preparing the base is booked for straight after removal.
The job is slowed down by unannounced restrictions on noisy work, an occupied home where access routes must be cleaned constantly, and unexpected finds such as a damp screed or suspicious adhesive that force work to stop.
How to remove bitumen from concrete and what to do about tar adhesive
Lifting parquet is dusty and noisy. Safety glasses, sturdy gloves, work boots and at least an FFP2 respirator are needed, preferably FFP3 when grinding bitumen. Seal the room off from the rest of the home with plastic sheeting and grind bitumen only with a machine connected to a vacuum with a fine filter.
Ordinary bitumen can be ground off with a floor grinder or softened with a remover and scraped away. Take care with old black adhesives, however. Older buildings also used tar-based adhesives. These contain polycyclic aromatic hydrocarbons (PAHs), which are carcinogenic. Dry grinding produces fine dust that spreads through the home and is easily inhaled. Occasionally, old floors also contain materials with asbestos.
If in doubt, have a sample tested by an accredited laboratory before any demolition. In homes built before 2000, have suspect materials tested before you drill or demolish. Do not remove tar adhesive yourself; leave it to a contractor experienced with hazardous materials who can arrange proper waste disposal. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor, and other asbestos-containing materials should be left to a contractor qualified for asbestos work. Do not burn timber with bitumen, lacquer or adhesive in a domestic stove or wood burner; it belongs at the household waste recycling centre or in a builder's skip.
Rules in a block of flats and services in the floor
In a flat, inform the managing agent or the freeholder in advance. They usually have rules on noisy work, permitted working hours and where a skip may go. Many leases also contain conditions on floor coverings, so check your lease before replacing parquet with a hard floor. Replacing a floor covering is usually ordinary maintenance. If you plan to change the floor build-up, alter structural elements or interfere with services in the floor, check the requirements with your local authority building control.
If water, heating pipes or electrical cables appear under the parquet, have them assessed by a qualified professional - electrics by an electrician - and do not chip around them blindly.
Typical mistakes and how they show up later
Levering and chipping too roughly. Deep gouges in the screed or broken boards in the base then need repairing, and preparation for the new floor takes longer. On a timber base, damaged boards later show up as bounce and creaking.
Bitumen residue left on the base. New adhesive does not bond to it, and bitumen can bleed through or react with vinyl over time. This shows as lifting, bubbles or dark stains on the new floor. Whether anything can be laid over the residue is decided by the technical data sheets of the new floor and primer.
Skipping the flatness check. A floating floor or vinyl on an uneven base creaks, bounces and the joints may open.
Overlooked moisture. Old parquet sometimes hides a damp screed or rotten timber. The cause must be dealt with first, and only then can the new floor be laid. Otherwise the new floor absorbs moisture, lifts or develops mould underneath.
Protruding nails and staples. They puncture the underlay or telegraph through thin vinyl, leaving bumps on the floor.
Dry grinding of unknown black bitumen. If it is tar-based adhesive, carcinogenic dust settles throughout the home and cleaning up afterwards is difficult.
Working without protection. Bitumen and wood dust irritate the airways, and splinters with nails easily cause injuries.
How to check the base after removal
Before laying the new floor, go through the base using this checklist:
- no blocks, nails or protruding staples remain on the surface,
- bitumen and adhesive are removed to the extent the new floor requires,
- the base is sound, does not crumble and does not sound hollow when tapped,
- a timber base does not bounce and the boards are firmly fixed,
- under a 2 m straightedge there are no larger deviations than the new floor manufacturer allows, commonly about 2 to 3 mm over 2 m, with stricter requirements for glued vinyl; if a new screed is laid, specify the flatness class in the contract: SR1 allows a gap of no more than 3 mm under a 2 m straightedge, SR2 5 mm and SR3 10 mm (BS 8204),
- the screed is dry, ideally confirmed by moisture measurement using the calcium carbide (CM) method; a cement screed should be below 2 % for most floors, a calcium sulphate (anhydrite) screed below 0.5 %, with the exact limit set by the floor manufacturer,
- the area is vacuumed and free of dust,
- door linings, doors and walls are undamaged,
- the waste has been taken away and the room cleaned.
DIY guide: nailed parquet in a smaller room
Nailed parquet in a smaller room can be handled as a DIY job. With bitumen and large areas the work is physically very demanding and the screed can be damaged, so it is more sensible to call a floor fitter there. More on related jobs can be found in the overview of flooring work. If services or black adhesive of unknown origin appear under the parquet, stop work.
- Carry out the furniture, remove the skirting boards and threshold strips.
- Cover door linings and doors with protective film or cardboard.
- Put on an FFP2 respirator, glasses, gloves and sturdy footwear.
- Start by the wall and lever up the first block with a pry bar over a timber packer so the base is not damaged.
- Work row by row and put the blocks straight into bags or onto a pile outside the room.
- Pull out or punch down nails sticking up from the base.
- Sweep and thoroughly vacuum the whole area.
- Check the base for soundness, cracks, moisture and loose boards.
- Take the waste to the household waste recycling centre or order a skip.
Frequently asked questions
The guide price is about €12.00 per m². Nailed parquet tends to be cheaper, bitumen-bonded parquet with grinding of the base more expensive. The price is also affected by room shape, the required cleanliness of the base and waste removal.
For nailed parquet in a smaller room, yes - a pry bar, a hammer and patience are enough. Bitumen-bonded parquet is much harder, and without a floor grinder and a breaker the base is difficult to prepare, so a professional is worth it there.
In most cases yes, at least locally. Removal reveals gouges, adhesive residue and old unevenness. Small areas can be repaired with levelling compound, larger differences are dealt with across the whole floor.
Nailed parquet lifted carefully can be used for repairs or when restoring a period floor, or as material for a new floating timber floor is an alternative if the old blocks are too damaged. Bonded blocks usually break during removal and end up as waste.
It cannot be determined reliably by appearance. Only analysis of a sample by an accredited laboratory gives certainty, showing whether the adhesive contains tar with PAHs or asbestos. The test is worth doing before demolition, not during it.
It depends mainly on the fixing method. Nailed parquet in an average room is usually done in a day. With bitumen-bonded parquet and grinding of the base, one worker manages roughly only 10 to 15 m² a day, and less with thick bitumen and awkward rooms.
Not always. If the parquet is firmly fixed, does not bounce and is flat, floating laminate or click floating vinyl can often be laid over it, subject to the manufacturer's instructions. Loose, cupped or damp parquet must be removed, however, otherwise the problem carries over into the new floor.
Related work
How laminate and other floating floors are laid, what the subfloor needs, which underlay to choose and how to check the finished floor.
How a floating click timber floor is laid: subfloor preparation, underlay, the method, common mistakes and checking the finished floor.
How click vinyl flooring is laid: subfloor preparation, underlay, expansion gaps and trims. Common mistakes and how to check the finished floor.
How to fill the gap between skirting board and wall, when to use acrylic caulk or silicone, and what to check in the finished job.
How skirting boards are fitted, which material and fixing method to choose, and how to handle the expansion gap, corners and uneven walls.
How to lift old parquet without damage, mark every block to a laying plan, then clean and store it so it can be relaid later.