Building work price list: Acrylic joint sealing
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Acrylic sealing of joints | lm | €1.90 / lm | lm | enter quantity- |
| Scraping off old oil-based paint | m² | €5.40 / m² | m² | enter quantity- |
| Crack bridging and repair of large cracks | lm | lm | - | |
| Priming walls and ceilings | m² | €1.00 / m² | m² | enter quantity- |
| Scraping off old (water-based) paint | m² | €3.50 / m² | m² | enter quantity- |
| Local crack repairs and patching | pcs | €3.50 / pcs | pcs | enter quantity- |
| Skimming walls | m² | €6.50 / m² | m² | enter quantity- |
| Skimming ceilings | m² | €7.50 / m² | m² | enter quantity- |
| Venetian plaster - polished finish | m² | m² | - | |
| Fitting corner beads | lm | lm | - | |
| Removing old wallpaper | m² | €3.50 / m² | m² | enter quantity- |
What acrylic joint sealing is and when it is needed
Acrylic joint sealing means filling gaps and junctions with flexible acrylic caulk so that they do not crack after painting. Typical places are the corner between wall and ceiling, around door linings, architraves and window boards, where plasterboard meets masonry, and fine cracks in old plaster. It is done just before painting. These lines show most clearly whether the work has been done carefully. It is a standard step in painting and decorating.
Caulking is needed when redecorating, during a renovation, after plasterboard partitions and suspended ceilings have been fitted, and in a new build where the structure is still settling. If thin dark lines appeared in the corners after the last redecoration, these are exactly what the caulk is meant to deal with. In an ordinary room the work takes hours rather than days, but painting can only start once the caulk has dried. A competent DIYer can manage it. For high ceilings and large areas, a decorator will be quicker.
Renovation and redecoration
On ordinary plastered walls and ceilings the work covers gaps around door linings, window frames and window boards, cracks in the corner between wall and ceiling, and junctions between timber, concrete and plaster. The surface is usually older, often dusty or with remnants of old paint, so cleaning and preparation take more time. Where flaking or thick old coatings need to come off first, this is done as part of stripping old paint.
Plasterboard corners and joints
This variant follows the installation of plasterboard partitions, wall linings and suspended ceilings. Flat joints between boards are first taped and filled with jointing compound and then sanded. Caulk comes only after that, in internal corners and where plasterboard meets another material, such as the ceiling, masonry or a door lining. The surface is new and flat, so the work goes faster. However, the total length of joints in a new loft conversion or with suspended ceilings is often considerable.
Why acrylic
Every building moves slightly with changes in temperature and humidity, and a new build also as it settles. Hard filler in a corner will crack, whereas flexible acrylic caulk tolerates this movement. Unlike silicone, it can be painted over.
What to agree before acrylic joint sealing
- Which joints will be sealed: walk round the property and show the decorator where cracks appeared after the last redecoration. Typically this means the ceiling corner, around door linings, window boards, the junction with a suspended ceiling and transitions between different materials. Agreeing this in advance means nothing is missed and both sides know how many metres are being charged.
- Cosmetic issue or real problem: caulk covers minor movement and hairline cracks. A diagonal crack across a whole wall, a crack that keeps coming back and widening after repairs, or a damp patch around a window needs the cause investigating first. If such places are simply filled, the problem remains.
- Which caulk: standard paintable interior acrylic caulk is sufficient for living rooms and bedrooms. For kitchens and bathrooms, away from direct contact with water, a caulk designed for humid areas is chosen, usually with an anti-mould additive.
- Who does it: with plasterboard, it is worth clarifying whether the drylining contractor or the decorator will seal the corners. Otherwise nobody may do them, or the decorator may end up caulking over unsanded joints.
- Timing: if the decorator plans to caulk and paint on the same day, ask whether the caulk will have time to dry before painting.
How acrylic joint sealing is done step by step
- Checking the surface: the decorator checks that the joint is dry, sound and free of dust. If an area is damp, they wait for it to dry or look for the cause of the damp.
- Cleaning: loose bits of plaster and old caulk are removed, old cracks are cleaned out and, if necessary, raked out slightly so the caulk has something to flow into. Dust is vacuumed or brushed away. Around old gloss-painted woodwork, failing coats may first need stripping old oil paintwork.
- Priming: absorbent or powdery surfaces are primed before caulking and the primer is left to dry. More on this in priming walls and ceilings.
- Pre-filling deep gaps: standard acrylic caulk shrinks considerably as it dries and will sink in a deeper gap. Deep gaps are therefore not filled in one thick layer. With plasterboard, the deeper area is filled with jointing compound; for larger gaps around door linings, foam backer rod can be pressed into the gap.
- Preparing the cartridge: the cartridge goes into a caulking gun and the nozzle is cut at an angle to roughly the width of the gap.
- Application: the caulk is applied in a smooth, continuous bead with steady pressure, in shorter sections so there is time to tool it.
- Tooling: immediately after application, the caulk is smoothed with a wet finger, a narrow flexible spatula or a smoothing tool, and the excess is wiped off with a damp sponge. Once smoothed, the corner should form a thin, straight, barely visible line, not a thick bead.
- Second coat if needed: where the caulk has sunk in a deeper gap, a second thin layer is applied, but only once the first has dried.
- Painting: paint goes on only once the caulk is completely dry.
How long acrylic caulk takes to dry before painting
Most caulks are ready for painting after a few hours, but thicker layers or a humid room can mean up to a day. The manufacturer's information on the cartridge is what counts. It usually also states the minimum application temperature, typically around +5 °C. In a cold, unheated building the caulk dries slowly and adheres less well. Gentle ventilation helps drying, as moisture leaves the room.
The cost of acrylic joint sealing and what affects it
Caulking is normally priced per running metre of joint, not per m² of wall. When comparing quotes, it is worth asking how the metres are measured, whether preparation of old joints is charged separately and whether caulking is already included in the painting price. Some decorators include it for a normal amount of work, others list it as a separate item.
The guide price for labour is €1.90 per running metre.
The final cost is mainly affected by these factors:
- Condition of the surface: new, clean, flat plasterboard is the cheapest option. Old cracks that have to be opened up, cleaned of old caulk and paint and primed can easily double the labour per metre.
- Width and depth of the gap: a narrow gap can be done in one pass. A wide gap needs pre-filling or two coats with drying time in between, which means more material and an extra visit.
- Overall amount of work: for just a few metres the price is often not calculated purely by the metre, because the decorator has to travel, set up and clear up. For larger jobs, such as a plasterboard loft conversion with many corners, the work per metre speeds up.
- Height and access: corners under a standard ceiling are done from steps. High ceilings, stairwells and sloping loft ceilings need a scaffold tower and noticeably increase the price.
- Complexity: recesses, arches, pipes and services mean many short, awkward sections, which take longer than one long straight corner.
- Finish quality: with raking light from large windows and with dark colours, every imperfection shows. The work has to be slower and more precise, often with masking tape.
- Materials: caulk for humid areas and backer rod cost more than standard interior caulk, although materials make up the smaller part of the price for this work.
How to prepare the home for caulking
- Clear the room or move furniture away from the walls so there is free access to all corners and door linings.
- With plasterboard, have the flat joints already sanded and dusted off, otherwise the decorator will be waiting for the drylining contractor.
- In winter, heat the room in advance and do not let it cool down during drying by leaving windows open for long periods.
- Provide access to power for a vacuum cleaner and work lights.
Common caulking mistakes and how they show later
- Caulk on dust or damp: the caulk does not adhere, eventually pulls away at the edge and a dark hairline appears in the corner.
- Caulk instead of jointing compound: flat joints between boards on the same plane need tape and jointing compound. Caulk does not reinforce them and will show through the paint.
- Too thick a layer: it shrinks considerably, cracks and leaves a visible bead or a sunken groove in the corner.
- Tooling too late: once the caulk has skinned over, it can no longer be smoothed neatly and the unevenness remains visible under the paint.
- Silicone instead of acrylic: paint does not stick to silicone, it beads up and the joint stays unpainted.
- Painting over fresh caulk: the paint over the joint may crack or leave patches.
- Missed critical areas: the ceiling corner, the junction with a suspended ceiling and around door linings are the first to crack.
- Smears around the joint: excess that is not wiped off dries on the wall or door lining and shows after painting as a shinier or raised strip.
- Caulking in a cold room: the caulk adheres less well and is easily damaged during painting before it has dried.
Acrylic caulk has its limits. Larger movement joints, floor joints, exterior work and areas directly exposed to water spray (such as a shower enclosure) need a different sealant, usually sanitary silicone or polyurethane. If a crack keeps opening or widening after filling, it is not cosmetic. The cause should be assessed by a specialist or a structural engineer. If the crack is in a load-bearing wall or in the common parts of a block of flats, such as a stairwell, it should be raised with the managing agent or freeholder.
How to check sealed joints before painting
Inspect the joints in raking light, for example with a torch held flat against the wall, before any painting starts.
- lines in the corners are straight, thin and without beads,
- caulk has not sunk into a groove in deeper gaps,
- caulk holds along the full length and is not peeling at the edges,
- there are no bubbles, holes or finger marks on the surface,
- there are no dried smears of caulk around the joints,
- ceiling corners, areas around door linings and windows and junctions with suspended ceilings are also sealed,
- door linings, window frames and window boards are clean, with no caulk residue,
- the caulk is completely dry before painting,
- after painting, the paint over the joints covers evenly and does not crack.
Caulking corners yourself
A competent DIYer can handle caulking. The method is the same as for a tradesperson. These tips help beginners in particular:
- For corners under the ceiling, work from a stable ladder or steps. For ceilings above normal height, it is better to call a decorator with a scaffold tower.
- Buy paintable caulk suited to the room, with a version for humid areas in kitchens and bathrooms.
- Practise the technique first on a short, less visible section.
- On uneven surfaces or the first time, mask both edges of the joint with masking tape.
- Apply in sections of about an arm's length so the caulk can be tooled before it skins over.
- Keep a bucket of water and a sponge to hand and wipe off excess straight away.
- Pull off the tape while the caulk is still soft.
- Check deeper areas once dry and, where the caulk has sunk, top up with a second thin layer.
When finished, it is worth leaving a little caulk in the nozzle and capping it so the cartridge can be used again later.
Frequently asked questions
The guide price for labour is €1.90 per running metre. The final cost depends on the condition of the joints, their width and depth, ceiling height, the complexity of the room and the overall amount of work. Old cracks needing preparation cost more than corners on new plasterboard.
Yes, but only after preparation. Loose old caulk and paint must be removed, the crack cleaned out and possibly raked out slightly, and absorbent surfaces primed. New caulk over dust and crumbling edges will not last long.
Usually not. Standard caulk is flexible and soft, so it sands poorly. Sandable caulks do exist, but even with these a smooth surface is mainly achieved during application. Sanding applies to the jointing compound on flat plasterboard joints, which is done before caulking.
One well-tooled coat is enough for an ordinary narrow corner. For deep or uneven gaps it is better to apply two thin coats, letting each dry, or to pre-fill the gap first.
Most often the painting was done too early, the caulk was applied too thickly, or an unsuitable, non-paintable sealant was used. Following the manufacturer's drying time and testing on a short section before painting the whole area helps.
With proper preparation it usually lasts through several redecorations. At the next redecoration, however, it is worth inspecting the corners. Where the caulk has come away or cracked, it is removed and fresh caulk applied. If it cracks in the same place shortly after each repair, this is a sign that the structure is moving more than caulk can tolerate.
Related work
How to recognise old distemper, why it must come off before repainting and how to scrape it without damaging the plaster. Steps, mistakes and checks.
How old oil paint is removed from walls, when sanding is enough, when to use a chemical stripper and how to prepare the wall for new paint.
When walls, ceilings or floors need priming, which primer to choose and how to apply it properly. The main types and the mistakes to avoid.
How wall and ceiling skimming works, which skim coat to choose, what makes the job harder and how to check a smooth surface before painting.
How a ceiling is skimmed step by step, which compounds suit concrete, plaster or plasterboard, how long it takes to dry and how to check the work.
How Venetian plaster is applied, what base it needs, where it suits, common polishing mistakes and how to check the finished wall.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.