Building work price list: Priming Walls and Ceilings
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Priming walls and ceilings | m² | €1.00 / m² | m² | enter quantity- |
| Scraping off old oil-based paint | m² | €5.40 / m² | m² | enter quantity- |
| Crack bridging and repair of large cracks | lm | lm | - | |
| Acrylic sealing of joints | lm | €1.90 / lm | lm | enter quantity- |
| Scraping off old (water-based) paint | m² | €3.50 / m² | m² | enter quantity- |
| Local crack repairs and patching | pcs | €3.50 / pcs | pcs | enter quantity- |
| Skimming walls | m² | €6.50 / m² | m² | enter quantity- |
| Skimming ceilings | m² | €7.50 / m² | m² | enter quantity- |
| Venetian plaster - polished finish | m² | m² | - | |
| Fitting corner beads | lm | lm | - | |
| Removing old wallpaper | m² | €3.50 / m² | m² | enter quantity- |
What primer does
Primer, often sold as a sealer or stabilising solution, is usually a clear liquid that soaks into the surface and binds dust. It is almost always needed on new plaster, plasterboard, concrete, filled repairs and old, dusty surfaces. It is the first step in most painting and decorating jobs.
Why does paint applied without a primer often look patchy? Plaster, filler and plasterboard absorb water at different rates. Paint soaks into one area more and another less, and the result is uneven colour and sheen. Primer evens out these differences, so the paint dries uniformly and less of it is used.
The second job of primer is to stabilise the surface. Old lime plaster and walls that have been scraped back often crumble and shed dust. A deep-penetrating primer binds these loose particles, so the next coat sits on a firm base and does not flake.
Primer cannot be seen once the room is painted and is often applied on the same day as other work, so people tend to treat it as a minor step. Yet it decides whether the paint or skim coat will hold and whether the finish will look even.
When not to skip primer and what to decide in advance
Primer is particularly worth applying:
- on new plaster, plasterboard, concrete and aircrete blocks,
- after stripping old paint or sanding a wall,
- on areas repaired with filler or plaster,
- before skimming, wallpapering, decorative plaster finishes and tiling.
Before ordering the work, it helps to be clear about a few points:
- What comes after the primer. Paint, skim coat, wallpaper and tiles often call for different products. The tradesperson should know what the surface is being prepared for.
- What the surface is. New plaster, plasterboard, smooth concrete, old limewash or oil-based paint each need a different approach. Old distemper is a special case. It can be recognised because a wet sponge softens it and picks up colour. It must be washed off with warm water back to the plaster, because primer will not bind it and new paint would peel off it.
- Whether there are stains on the walls or ceiling. Point them out in advance, as they need a different product from a standard primer.
- Whether priming is included in the price of painting or skimming. Some tradespeople include it, others charge for it separately.
- How many coats are priced. Very absorbent surfaces need two coats, and this should appear in the quote.
Types of primer and when to use each
Deep-penetrating primer
The most common type, usually an acrylic dispersion. Suitable for plaster, concrete, plasterboard and aircrete. It stabilises absorbent, dusty surfaces and is used before painting, skimming and wallpapering.
Plasterboard primer
Plasterboard is smooth, and its paper face absorbs differently from the filled joints. A primer designed for plasterboard evens out both paper and filler, so the joints do not show through the paint.
Bonding primer
On smooth, non-absorbent surfaces such as old glazed tiles or very smooth concrete, a standard primer is not enough because it has nothing to soak into. A bonding primer is used instead, often with fine sand in it, giving adhesive or skim coat a better key. Old oil-based paint is treated in a similar way if it is only abraded rather than removed - see stripping old oil paintwork.
Stain block primer
Water stains, nicotine, soot and grease are covered with a stain-blocking primer that stops them bleeding through the new paint. A standard primer will not hide them. With stains from a leak, the cause must be fixed first and the ceiling left to dry out, otherwise the stain will come back.
Multi-purpose primer
A compromise for mixed surfaces. Some are also suitable for exterior use or contain anti-mould additives. Note that primer is not waterproofing. In a shower enclosure or around a bath, a tanking membrane belongs under the tiles, and an anti-mould additive will not cure mould caused by damp or a cold bridge.
How priming is done step by step
- Masking: the floor, furniture, windows, door frames and switches are covered with dust sheets or plastic sheeting and the edges taped. Ceilings need more thorough masking, as the primer drips.
- Assessing the surface: the tradesperson checks whether the wall or ceiling is dusty or crumbling, whether it has distemper or oil-based paint on it and whether there are stains. The product is chosen accordingly.
- Preparation: loose paint, flaking plaster and grease are removed, and distemper washed off if present. Filled repairs must be completely dry.
- Dusting down: the surface is cleaned of dust. On skimmed and sanded walls the dust is brushed off or vacuumed.
- Checking conditions: the surface must be dry and the room temperature within the manufacturer's range, usually above +5 °C.
- Preparing the primer: the primer is stirred. Concentrates are diluted with water in the ratio given on the technical data sheet, ready-to-use products are applied as supplied.
- Cutting in: corners, angles and the areas around door frames, windows and switches are primed with a brush.
- Main area: an even, thin coat is applied with a roller. On ceilings the work runs from the window into the room, so it is clear where primer has already gone. A lightly tinted primer is sometimes used on ceilings because the coated area is easier to see.
- Drying: at room temperature the primer is usually touch dry in 2 to 4 hours, longer in cold or damp conditions. Manufacturers often require a longer wait before skimming or tiling. The room is ventilated gently, without draughts.
- Second coat if needed: on very absorbent new plaster or aircrete a second coat is applied once the first is dry, and only then does the next trade continue.
- Clearing up: tools are washed out with water straight away, and drips on window frames and floors are wiped off before they dry.
What affects the price
The guide labour price is €1.00 per m². The coat itself goes on quickly, so the final figure depends heavily on the circumstances around it:
- Surface condition: a clean, sound surface is primed quickly. If loose paint must be scraped off, distemper washed off, grease removed or sanding dust vacuumed first, extra work is added, often more demanding than the priming itself.
- Absorbency: very absorbent new plaster or aircrete often needs two coats. On such areas that means roughly double the labour and material.
- Ceilings and height: ceilings are slower than walls because the work is overhead and more masking is needed. High ceilings, stairwells and sloping loft ceilings that need scaffolding or a tower add further cost.
- Room layout: small rooms such as bathrooms, hallways and alcoves, with many corners and window reveals, mean more brushwork and less fast rolling.
- Furnished home: moving and covering furniture adds time, especially when priming a ceiling.
- Specialist products: bonding primer or stain block cost more than standard deep-penetrating primer and add an extra step.
- Size of the job: on a small area, such as one repaired wall, preparation, masking and clearing up make up much of the price, so tradespeople often charge a minimum fee for small jobs.
When comparing quotes, check whether materials are included, how many coats are priced and whether the area measured is the walls and ceiling rather than the floor. The wall and ceiling area of a flat is usually several times larger than its floor area.
What makes the work easier and what slows it down
It helps when the client provides:
- a cleared room: if furniture stays in the room, move it to the centre and leave access to the walls and windows,
- finished earlier work: electrical work, chases and filled repairs should be complete and dry. If anything is chased or filled after priming, the repaired area must be primed again,
- water and electricity: water is needed for diluting and washing tools, electricity for lighting and a vacuum cleaner,
- a heated room: in winter, especially in a new build or empty property, the room should be heated, otherwise the primer dries slowly or the work has to be postponed,
- an agreed sequence with the decorator or tiler: primer should be applied shortly before the next stage. If dust settles on the surface in the meantime, it must be cleaned again,
- enough light: on ceilings and in rooms without windows a strong work lamp helps a great deal, otherwise missed areas are hard to spot.
The work is slowed down when sanding, drilling or other dusty work goes on in the same room at the same time. Dust sticks to the fresh primer and the surface is then no longer sound.
Common mistakes and how they show up later
- Priming a damp or dusty surface. The primer does not soak in and only glues the dust to the surface. Later the paint or skim coat flakes off together with this layer.
- Too thick a coat. The primer forms a glossy, slippery film that paint and adhesive do not grip well. It should be brushed or rolled on, not flooded. Shiny patches may appear in these areas after painting.
- Wrong dilution. Primer that is too thick does not soak in, primer that is too thin does not bind. The result is either a shiny surface or one that is still dusty.
- Priming over distemper that has not been washed off. The new paint eventually peels off in flakes together with the old layer.
- Skipping plasterboard or repaired areas. Filled joints then show through the paint, most of all in side light from a window.
- Missed strips on the ceiling. With clear primer overhead it is easy to miss a strip. After painting, that area shows a different shade.
- Standard primer on a non-absorbent surface. Adhesive or skim coat does not bond to the glaze, and tiles may sound hollow when tapped.
- Standard primer over stains. Water or nicotine stains reappear after painting, often after the very first coat.
- Carrying on too late or too early. Painting over wet primer reduces adhesion, and so does waiting so long that dust settles on the surface.
How to check the finished work
- when you run your palm over it, the surface does not shed dust or crumble,
- water test: put a few drops of water on a primed area and, for comparison, on an unprimed one, for example behind a radiator or on a spare patch of plaster. On the primed area the water soaks in more slowly and evenly. A completely non-absorbent surface where water runs off as if on glass suggests the coat is too thick,
- the surface is slightly matt, without shiny patches or runs,
- on the ceiling, no missed strips are visible with a lamp held at an angle,
- corners, angles, reveals and the areas around door frames are coated,
- repaired areas and plasterboard joints are primed together with the rest of the surface,
- stains agreed for stain block primer have actually been treated with it,
- the surroundings are clean, there are no dried drips on windows and frames, the masking has been removed and the tools washed.
Priming as a DIY job
Priming can be done yourself if you have a stable stepladder or a low platform and some patience. The process is the same as for a tradesperson above, and the key is a clean surface and following the technical data sheet. A few extra practical tips:
- wear safety glasses when working on a ceiling, as primer drips and irritates the eyes,
- use a medium-pile roller for the main area and a flat brush for corners, and pour the primer into the tray in small amounts,
- buy the quantity based on the coverage on the tin and the area of the walls and ceiling, not the floor, and allow a reserve for a second coat on absorbent surfaces,
- use diluted primer on the same day and do not pour leftovers back into the original container,
- choose a day with good daylight for the ceiling or have a strong work lamp.
Frequently asked questions
The guide price is €1.00 per m². The final figure depends on the condition and absorbency of the surface, the number of coats, the ceiling height, the room layout and how much masking is needed. Check also whether materials are included.
If the old paint is sound, not dusty, and the new paint is of the same type, primer may not be necessary. If the paint rubs off on your finger, or the walls have been scraped or repaired, priming is worthwhile.
Often yes, if the primer dries within a few hours at room temperature. In cold or very humid conditions it takes longer. Only paint once the surface is completely dry to the touch - the exact time is given by the manufacturer.
Deep-penetrating primer typically covers at around 0.1 to 0.2 litres of ready-to-use product per m² for one coat, more on absorbent plaster and less on smooth plasterboard. With a concentrate, calculate using the diluted quantity.
Not entirely. A mist coat of diluted emulsion is widely used on fresh plaster and partly evens out absorbency, but it does not bind the surface the way a deep-penetrating primer does. Do not rely on it for dusty or old plaster.
Yes. The paper face and the filled joints absorb differently, and without primer the joints on the ceiling would usually show in side light.
Related work
How to recognise old distemper, why it must come off before repainting and how to scrape it without damaging the plaster. Steps, mistakes and checks.
How old oil paint is removed from walls, when sanding is enough, when to use a chemical stripper and how to prepare the wall for new paint.
How wall and ceiling skimming works, which skim coat to choose, what makes the job harder and how to check a smooth surface before painting.
How a ceiling is skimmed step by step, which compounds suit concrete, plaster or plasterboard, how long it takes to dry and how to check the work.
How Venetian plaster is applied, what base it needs, where it suits, common polishing mistakes and how to check the finished wall.
How cracks in walls, ceilings and plasterboard are taped and filled, which tapes and fillers to use, and how to check that the repair will last.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.