Building work price list: Taping and Filling - Repairing Cracks in Walls and Ceilings
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Crack bridging and repair of large cracks | lm | €3.00 / lm | lm | enter quantity- |
| Scraping off old oil-based paint | m² | €5.40 / m² | m² | enter quantity- |
| Acrylic sealing of joints | lm | €1.90 / lm | lm | enter quantity- |
| Priming walls and ceilings | m² | €1.00 / m² | m² | enter quantity- |
| Scraping off old (water-based) paint | m² | €3.50 / m² | m² | enter quantity- |
| Local crack repairs and patching | pcs | €3.50 / pcs | pcs | enter quantity- |
| Skimming walls | m² | €6.50 / m² | m² | enter quantity- |
| Skimming ceilings | m² | €7.50 / m² | m² | enter quantity- |
| Venetian plaster - polished finish | m² | m² | - | |
| Fitting corner beads | lm | lm | - | |
| Removing old wallpaper | m² | €3.50 / m² | m² | enter quantity- |
What taping and filling does and when it is needed
Filler on its own only fills the crack. If the surrounding surface moves even slightly, the filler cracks again in exactly the same place. Tape bridges the crack, spreads the stress over a wider area and holds the repair together. This makes the crack much less likely to reappear under new paint.
Taping and filling is most often needed before decorating, when refurbishing older properties, in new builds that are still settling, and on every plasterboard joint. It is done on walls and ceilings, on plaster and on plasterboard. It is part of the preparation stage within painting and decorating. It is usually followed by priming and painting, or by skimming the whole surface.
Why cracks appear and when taping and filling is enough
Most internal cracks are not structural. A new building settles in its first few years, and small cracks appear mainly where different materials meet, for example masonry and a concrete ceiling. Plaster shrinks as it dries, walls react to changes in temperature and humidity, and in older houses the surface layer is brittle, so chasing out walls for new electrics can be enough to crack it. On plasterboard, cracks appear at joints that were not properly reinforced.
By size, cracks can be roughly divided as follows:
- hairline cracks on the surface, often after plaster or paint has dried: if they are not growing, a thin coat of filler without tape is sometimes enough,
- visible cracks up to about 2 mm, typically in corners, on plasterboard joints and where materials meet: these need tape and filler,
- deep and moving cracks that keep coming back or are gradually widening: these need wider reinforcing mesh and more coats of filler.
If a crack keeps returning after repair, runs diagonally from the corner of a window or door, is widening or goes through the full thickness of the wall, it is no longer a decorating job. Have it assessed by a structural engineer. In a block of flats, report it first to the managing agent or freeholder, as it may affect the structure of the whole building. Tape would only hide such a crack for a while.
What to clarify before booking the work
- Whether the crack is moving. If unsure, mark both ends with a pencil and check over several weeks whether it gets longer. A more reliable method is a plaster tell-tale, a small strip of plaster applied across the crack: if it cracks, the crack is active. Crack width can also be monitored with a simple crack monitor. A crack that is growing is not suitable for taping and filling.
- What comes next. If the wall is only going to be painted, the repair must be filled flush so that it cannot be seen. If the whole surface is going to be skimmed, a less careful finish is acceptable, because the skim coat evens out the surface.
- How many cracks there are. A few short cracks are repaired locally. Where a network of cracks covers the whole wall, reinforcing the entire surface with mesh and skimming it is often better value than dozens of separate repairs.
Repairing wall cracks with tape step by step
The method is similar on plaster and on plasterboard. The main difference is the choice of tape and filler.
- Protecting the area: the floor and furniture below the repair are covered with dust sheets or polythene to keep sanding dust and bits of filler off them.
- Cleaning: loose plaster and flaking paint around the crack are removed back to a sound surface.
- Opening up the crack: the crack is raked out into a V shape with a knife or the edge of a scraper, so the filler has space to flow into and something to grip.
- Removing dust: dust is brushed or vacuumed out of the crack and the surrounding area.
- Priming: older, dusty and very absorbent surfaces are primed or sealed so that the filler does not dry too fast and bonds well.
- Filling the crack: the groove is filled flush with the surface, and when self-adhesive tape is used, left to dry.
- Applying the tape: self-adhesive tape or mesh is stuck onto the dry, filled surface. Paper tape is bedded into a thin layer of fresh filler, and air and excess filler are pressed out from under it with a taping knife. The tape must lie straight, centred on the crack, with no bubbles or creases.
- First coat of filler: the filler covers the tape completely and is feathered out to the sides.
- Drying and light sanding: once dry, the surface is lightly sanded. Drying time depends on the filler, temperature and coat thickness, so the manufacturer's instructions apply.
- Second coat: a thinner, wider coat is applied to bring the repair level with the wall. For deep cracks or where a high-quality finish is required, a third coat is added.
- Final sanding: the area is sanded with abrasive paper or mesh, usually around 120 to 180 grit. Under a final paint finish, the last pass is often done with a finer grit of about 180 to 220. The result is checked with a torch held at a low angle close to the surface.
- Priming before painting: after dusting off, the repaired area, ideally the whole surface, is primed so that the paint absorbs evenly. More detail is given in the guide to priming walls and ceilings.
Taping and filling ceilings: what is different
Ceiling work is done overhead, so filler and tape tend to drop off, and the tradesperson has to work with smaller amounts and more slowly. Light from a window falls across a ceiling almost parallel to the surface, so every bump shows more clearly than on a wall.
In buildings with precast concrete floors, straight cracks often appear on the ceiling along the joints between the slabs. These joints move slightly with temperature changes, so wider reinforcing mesh is used and the filler is spread over a larger width. The corner between ceiling and wall is often sealed with flexible caulk rather than taped. If a ceiling crack comes back after repair or pieces start to come loose, it should be referred to the building's managing agent or freeholder.
Tapes and fillers: what to use where
The choice of reinforcement depends mainly on the surface and the depth of the crack:
- paper tape is the standard for plasterboard joints, it is strong and holds its shape well, but has to be bedded accurately into the jointing compound,
- self-adhesive fibreglass mesh tape is easy to apply, so it is popular for cracks in plaster, smaller repairs and with beginners,
- reinforcing mesh (scrim) is wider and suits deeper cracks, corners and junctions between materials,
- corner beads protect and strengthen external corners on plasterboard.
For interior walls and plasterboard the most common choice is a gypsum-based filler or jointing compound, which sands easily. A fine finishing filler is used for the final smooth coat. In corners where different materials meet and the joint naturally moves, for example between a ceiling and a plasterboard partition, flexible acrylic decorator's caulk is often used, because hard gypsum filler would crack there sooner or later. Acrylic caulk can be painted over.
In bathrooms, gypsum fillers are commonly used on moisture-resistant plasterboard away from areas that get directly splashed. In a shower enclosure and anywhere water is sprayed, use materials designed for wet areas to suit what goes on the wall next, for example tanking and tiles.
What affects the price per metre
Taping and filling is usually priced by the length of cracks repaired, in running metres. A typical labour rate is €3.00 per running metre. The actual price is affected by these factors:
- Length and number of cracks: many short cracks take more work than one long straight crack of the same total length, because each one has to be prepared, started and finished separately. For small jobs, tradespeople often charge a call-out fee or a minimum charge.
- Depth and type of crack: the cheapest is a shallow hairline crack that needs only narrow tape and two thin coats of filler. A deep or moving crack with wide mesh and three coats takes several times more time and material.
- Condition of the surface: crumbling old plaster that has to be hacked off, consolidated and primed, or several layers of old paint flaking around the crack, will noticeably extend the work. Where old paint has to come off first, see stripping old paint, and for gloss or other oil-based coatings, stripping old oil paintwork.
- Height and position: cracks on ceilings, in corners and where the ceiling meets the wall are worked from a stepladder or scaffold tower in an awkward position, which is slower than working on a wall at eye level. High ceilings and stairwells also add time for setting up access equipment.
- Materials: standard tape and gypsum filler are inexpensive. Wide reinforcing mesh, corner beads or flexible caulk for corners increase material costs.
- Finish quality: a repair that will be skimmed over does not need to be perfectly flat. A repair under a final paint finish in strong side light needs more coats and more sanding.
When comparing quotes, ask whether priming, protecting the area and taking away waste are included or charged separately.
How to prepare for the work
The work goes fastest in an empty room. It also helps if the repairs are done together with painting or skimming the whole room. The following steps are done in one go, and the tradesperson does not have to make repeat visits just to wait for a coat to dry.
- clear the room, or at least move furniture away from the walls being repaired, in a lived-in home everything has to be covered, which adds time,
- take down pictures, shelves, curtains and light fittings near the cracks,
- keep the room at normal room temperature with the option to ventilate, but without draughts, in a cold, damp room filler dries slowly and the wait between coats is longer,
- mark all the cracks you want repaired in advance so none are missed,
- in a block of flats, check the lease or building rules for the hours when noisy and dusty work is allowed.
The work takes longer if other trades are working in the room at the same time, for example an electrician still chasing out cable runs. Taping and filling is done after the rough work, otherwise new cracks appear right next to the repaired ones.
Common mistakes and how they show later
Filler without tape. Not enough for a moving crack. The crack usually comes back, often just a few weeks after painting, and in exactly the same place.
Badly laid tape. Bubbles, creases and edges not pressed down properly create visible ripples under the paint, or the tape eventually lifts and blisters under the paint.
Rushing. Filler applied over a coat that has not dried tends to sink or crack. The repair then shows as a dip or a network of fine cracks.
Skipping the primer. Filler and paint bond less well, and after painting the repaired area differs in sheen or shade.
Filling too narrow. A thick band of filler close around the tape creates a ridge that shows as a stripe in side light. The second coat must be feathered out wider.
Careless sanding. Knife marks and sharp transitions show even more under paint, especially in side light from a window.
Hard filler in a moving corner. Gypsum filler at the junction of a ceiling and a partition usually cracks after the first heating season, leaving a straight line along the whole corner.
How to check the finished work
- with a torch held at a low angle, no tape edges or knife marks are visible,
- the repaired area blends smoothly into the surrounding wall or ceiling without a ridge,
- running a hand over it, no step or gritty surface can be felt,
- the tape is not lifting anywhere and there are no bubbles under the filler,
- the filler is not cracking and no new hairline cracks appear at the edges of the repair,
- the surface has been dusted off and primed before painting,
- flexible caulk has been used in corners that move,
- the surroundings, floor and furniture are free of filler and dust,
- after painting, the repaired area does not differ in sheen or shade.
DIY guide: repairing a small crack in a wall
A small crack on a wall within reach of a low stepladder is a manageable DIY job. Larger areas, cracks across a whole ceiling or new plasterboard work are better left to a decorator or a plasterer or drylining specialist. If a crack runs around a socket or switch, do not remove the faceplates or touch the wiring, fill only the wall surface around them. Do not repair cracks that are widening yourself.
- Cover the floor and furniture around the repair.
- Remove loose plaster and paint and rake the crack out into a V shape with a knife.
- Brush or vacuum the dust out of the crack and the surrounding area.
- Prime the area around the crack and leave it to dry as stated on the tin.
- Fill the crack and leave it to dry.
- Stick self-adhesive fibreglass mesh tape centrally over the crack and press it down firmly.
- Cover the tape with a first coat of filler and feather it out to the sides.
- When dry, sand lightly and apply a second, wider and thinner coat.
- Sand flush with fine paper while wearing a dust mask and safety glasses, check with a torch at a low angle, dust off and prime before painting.
Frequently asked questions
A typical rate is €3.00 per running metre. A shallow crack on a wall at eye level costs less, a deep moving crack on a ceiling with mesh and three coats of filler costs more. For small jobs, allow for a possible call-out or minimum charge.
For a small hairline crack that is not moving, this is sometimes enough. If the crack is clearly visible, sits where materials meet or has already come back once, it will almost always reappear without tape.
The actual work on a few cracks does not take long, but the overall time is set by drying between coats. This depends on the type of filler, coat thickness and room temperature, and the figure is given on the packaging. Because each coat has to dry, the repair usually takes one to two days. In a cold, damp room, allow longer for drying.
Usually yes. Even with the same colour, a patch that is painted separately tends to show, so the whole surface is painted from corner to corner. Include this in the budget from the start.
A new build settles in its first few years and some cracks only appear after the first heating season. If the moving-in date allows, it is worth waiting with the final repair until the cracks have stabilised, then repairing them all at once before decorating.
Cracks in plaster before painting are normally taped and filled by the decorator. Joints and corners on new plasterboard work are usually taped and finished by the plasterer or dryliner who installed the boards. If a crack looks like a structural problem, it must first be assessed by a structural engineer.
Related work
How to recognise old distemper, why it must come off before repainting and how to scrape it without damaging the plaster. Steps, mistakes and checks.
How old oil paint is removed from walls, when sanding is enough, when to use a chemical stripper and how to prepare the wall for new paint.
When walls, ceilings or floors need priming, which primer to choose and how to apply it properly. The main types and the mistakes to avoid.
How wall and ceiling skimming works, which skim coat to choose, what makes the job harder and how to check a smooth surface before painting.
How a ceiling is skimmed step by step, which compounds suit concrete, plaster or plasterboard, how long it takes to dry and how to check the work.
How Venetian plaster is applied, what base it needs, where it suits, common polishing mistakes and how to check the finished wall.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.