Building work price list: Fitting Corner Beads - Vertical Edges of Corners or Around Windows
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Fitting corner beads | lm | €2.90 / lm | lm | enter quantity- |
| Scraping off old oil-based paint | m² | €5.40 / m² | m² | enter quantity- |
| Crack bridging and repair of large cracks | lm | lm | - | |
| Acrylic sealing of joints | lm | €1.90 / lm | lm | enter quantity- |
| Priming walls and ceilings | m² | €1.00 / m² | m² | enter quantity- |
| Scraping off old (water-based) paint | m² | €3.50 / m² | m² | enter quantity- |
| Local crack repairs and patching | pcs | €3.50 / pcs | pcs | enter quantity- |
| Skimming walls | m² | €6.50 / m² | m² | enter quantity- |
| Skimming ceilings | m² | €7.50 / m² | m² | enter quantity- |
| Venetian plaster - polished finish | m² | m² | - | |
| Removing old wallpaper | m² | €3.50 / m² | m² | enter quantity- |
What a corner bead is and why a corner needs one
External wall corners, window reveals and the edges of plasterboard partitions are the first parts of a room to get damaged. A shopping bag, a vacuum cleaner or moving a wardrobe is enough. A corner bead is a thin metal or plastic profile that is bedded into plaster, skim or filler. It reinforces the edge and acts as a guide for a straight, sharp corner. It is one of the preparation tasks within painting and decorating, because the corner has to be right before any paint goes on.
Corner beads are usually needed in these situations:
- new plastering in a new build or conversion, where the corners are formed from scratch,
- plasterboard, meaning partitions, ceilings, wall linings, recesses and shelves,
- refurbishment, where an old corner is crumbling, chipped or out of true,
- new or replacement windows and doors, where the reveals and head need making good,
- full skimming, where the corners are straightened along with the wall.
A standard angle bead belongs on external corners, the ones that project into the room. For internal corners there are PVC internal corner beads, and for edges that are not at right angles, for example in a loft room, flexible corner tape is used. With plasterboard, internal corners are often finished with reinforcing tape, and with plaster by carefully forming the angle by hand.
Types of corner bead and when to use each
All corner beads do essentially the same job, but they differ in material and in which layer they belong to. The type is always chosen according to the background and the conditions.
Galvanised steel angle beads
A perforated profile made from galvanised steel sheet. It is mainly used in traditional internal plasters, both gypsum and lime-cement. It is stiff, holds its line well and copes with hallways and stairwells, where corners get knocked often. It is not normally chosen for damp areas or outdoors. If the galvanising is damaged, it can rust over time and the stain can bleed through the paint.
Aluminium corner beads
Aluminium does not rust like steel, and it is light and fairly stiff. However, it corrodes in the alkaline environment of fresh lime-cement plaster or render. Aluminium beads are therefore mainly used under gypsum fillers and skim coats on plasterboard, especially on long and heavily used corners where an accurate line over the full wall height matters. They go into lime-cement plaster only if the bead manufacturer explicitly allows it. Otherwise a galvanised or PVC profile is used.
Plastic (PVC) corner beads
These are more flexible, do not rust and are easy to cut. They suit flats, less exposed corners, bathrooms and intricate plasterboard details such as recesses and shelves. Under a hard impact they tend to bend rather than keep a perfectly sharp edge.
Mesh corner beads
A PVC or aluminium profile with glass-fibre mesh attached. The mesh is bedded into adhesive or base coat and also reinforces the area around the corner. They are typically used on external wall insulation systems and around window reveals. On the window head of a façade, a corner profile with a drip edge is used so that water is shed and does not run down the reveal towards the window. Outdoors it is important to use the profiles approved by the insulation system manufacturer, not ordinary internal beads.
Fitting only, or fitting with filling
Tradespeople's quotes use the same name for two different scopes of work.
- Fitting corner beads means setting the profile into fresh plaster or adhesive and lining it up. The bead then guides the next coat of plaster, which the plasterer or decorator applies as a separate item.
- Fitting and filling aluminium/PVC corner beads also includes filling the bead flush with the wall, usually in two or three thin coats, and a light sanding. The result is a corner ready for priming and painting. This option is common on plasterboard and under a skim coat.
When comparing quotes, check whether the tradesperson is pricing for fitting only or also for filling and sanding. The difference in labour is considerable.
What to agree before ordering the work
Corner beads are a small item, but they decide how the room looks once painted. Before agreeing terms with a tradesperson, clarify the following.
- Which corners are included: list all external wall corners, window reveals, door openings without a lining, and the edges of recesses, shelves and ceilings. The edge around a window is easily forgotten.
- Which material: a stiff metal profile for hallways and stairs, aluminium on plasterboard, PVC in the bathroom, and on a façade only the profile from the insulation system.
- Who finishes the corner: either filling and sanding are included in the price, or the plasterer or decorator finishes the corner under another item. Agree this in advance, otherwise each may assume the other will do it.
- What finish is expected: ordinary white matt emulsion is more forgiving than a sheen finish or a wall with strong side light from a window.
- What will cover the corner later: if the corner is to be tiled, it is finished with a tile trim, and the plaster bead does not need to run all the way down.
How to work out the running metres
Corner beads are priced per running metre, meaning the length of the edge, not the wall area. For a vertical corner this is the room height, so a corner in a room 2.6 m high means 2.6 running metres.
For a window, add both vertical edges of the reveal and the horizontal edge of the head. A 1.5 × 1.5 m window therefore gives 4.5 running metres. If the edge under the sill is also done, add another 1.5 m. Beads are sold in fixed lengths, most often 2.5 m and 3 m. Ask whether the tradesperson charges for the actual length of the edges or rounds up to whole beads.
How a corner bead is fitted
- Survey and measuring: the tradesperson checks how far the corner is out of plumb, whether the plaster is sound and what thickness of coat will go on.
- Preparing the corner: loose plaster, dust and remnants of old paint are removed from both sides of the corner, which is part of stripping old paint where needed. A crooked or crumbling edge is hacked back to a sound background. Fragments fly off during hacking, so safety glasses and gloves are worn.
- Priming: the corner is primed as recommended by the filler or plaster manufacturer and left to dry. The same principles apply as in priming walls and ceilings.
- Cutting the profile: the bead is cut roughly 5 to 10 mm shorter than the corner height so it does not press against the ceiling or floor. On a window reveal, the beads in the top corner are mitred precisely so the lines meet.
- Applying the material: filler, adhesive or plaster is applied along the full length on both sides of the corner, not just in dabs. With plaster the bead is set into the plaster, with plasterboard and skim into filler.
- Pressing in and aligning: the profile is pressed in so the material squeezes through the perforations. It is then lined up with a spirit level or straightedge to plumb and to the plane of the finished surface.
- Removing the excess: surplus material is scraped off with a trowel or filling knife. The alignment is checked again straight away, while the bead can still be adjusted.
- Further coats: when filling, a second wider and thinner coat is applied once the first is dry, covering the bead and feathered into the wall, with a third if needed. With plaster, the bead guides the next coat.
- Sanding and finishing: the dry filler is lightly sanded without exposing the edge of the bead. The corner is dusted off and is ready for priming and painting.
Cost of fitting corner beads per running metre
The guide labour price in the price list is €2.90 per running metre. An actual quote may be higher or lower. It depends on what condition the corner is in on site and what the work is meant to include.
- Condition of the corner: a straight, sound and clean corner is quick to do. An old corner with blown plaster, layers of paint or a large deviation from plumb must first be hacked off, consolidated and built up. This adds time and material, and on very poor corners the price per running metre can rise several times over.
- Scope of work: fitting into plaster alone is cheaper than fitting with two or three coats of filler and sanding. Filling means returning to the same corner several times.
- Corner height: a normal wall in a flat can be done from the floor or a small stepladder. A tall stairwell or gable needs scaffolding, which is often charged separately.
- Number and type of edges: one long straight corner is quicker than many short edges around windows, recesses and alcoves. These need precise cutting and joining, so the price per running metre tends to be higher.
- Background: plasterboard needs fine multi-coat filling, while plaster needs accurate guiding and control of thickness.
- Bead material: a plain galvanised bead is cheaper than an aluminium bead or a mesh profile. With only a few metres, however, materials make up a smaller share of the price than labour.
- Quality of finish: under a sheen finish or with side light from a window, the transition over the bead must be flawless. That means more coats and more thorough sanding.
- Small jobs: for just a few metres, tradespeople often charge a minimum call-out fee. Preparation and waiting for drying take as long as on a larger job.
How to prepare the property so the work goes quickly
Fitting corner beads follows on from other trades. A lot therefore depends on the state of the property on the day the tradesperson arrives.
- Windows and doors finished: reveals are formed only after the windows are fitted and the perimeter joint is sealed and made good. If a window is replaced later, the corner gets damaged and has to be redone.
- Chases and boxes finished: electrical work near the corner should be complete and the chases made good, so nobody has to cut into the new corner.
- Clear access: move furniture at least a metre away from the corners and clear plants and objects from window sills. Moving things during the work causes delays, and a fresh corner is easily damaged in the process.
- Temperature and ventilation: filler and plaster need normal room temperature and gentle ventilation to dry. In a cold, unheated property the wait between coats can stretch to days. Draughts and direct sun, on the other hand, make the thin coat along the bead crack.
- Combining with other work: it goes fastest when the corners are done together with skimming or plastering the whole room, so the tradesperson does not have to come back just for the corners.
- Communal areas: corners in the hallway or stairwell of a block of flats are part of the common parts of the building. Work on them needs the consent of the freeholder or managing agent. Also agree when the hallway can be sheeted over.
Typical mistakes and how they show up later
A crooked bead. If it is not checked with a level, the corner may look straight at first glance. After painting, however, light and shadow highlight every wave. Filling will not correct a crooked bead, the only fix is to cut it out and fit it again.
Voids behind the profile. If the material is applied in dabs or the bead is not pressed in firmly, gaps remain behind it. On impact the edge breaks and the filler around it cracks, often years later when furniture is moved.
Thick coats in one go. Thickly applied filler shrinks and cracks. Thin coats with drying times as specified by the manufacturer are better. Cracks show up after painting as a fine line along the bead.
Sanding through to the metal. An exposed bead edge shows through the paint. With aluminium and galvanised steel it can leave a dark stripe.
Unsuitable material. An internal bead on a façade, plain steel in a damp room, an aluminium bead in fresh lime-cement plaster, or a filler unsuitable for the background. This shows up as rust or dark stains, flaking and cracks near the corner.
A bead pressed against the ceiling or floor. A profile without a gap bends when fitted, and the corner then bulges in the middle. When the structure moves, it pushes on the filler, which cracks around the end of the bead.
A poor joint at the corner of a reveal. If the beads on a window reveal meet inaccurately or at different heights, a step forms in the top corner. It is the first thing anyone sees when looking at the window.
A bead standing proud of the wall. When the profile is fitted too proud, filler can no longer cover it with a thin coat. The corner then shows a hump or a wide band of filler.
How to check the finished corners at handover
Look at the corner from the side in daylight and hold a long straightedge against it. If filling is part of the agreement, check only once the corner is completely dry and sanded.
- the corner is plumb over its full height, with no gaps or waves under the straightedge,
- the edge is sharp and evenly formed, without steps or dips,
- the bead does not stand proud or show through the filler anywhere,
- tapping the corner does not produce a hollow sound,
- the filler blends smoothly into the wall without a visible band,
- there are no hairline cracks along the bead,
- at windows and doors the bead joints are clean and in line, including at the corners of the head,
- the type of profile matches the agreement and the conditions, for example PVC in the bathroom,
- windows, sills and floor are free of filler or plaster,
- the surface is dusted off and ready for priming and painting.
DIY guide: fitting a corner bead indoors
If there are a few corners of normal height in the home and the background is sound, the job can be done following the steps above. A spirit level or long straightedge, tin snips, filling knives, a material suitable for the background and a sanding mesh are needed. Leave façades and work at height to a professional. For DIY work, these points also apply:
- Choose the right material: filler for plasterboard and skim, plaster for plastered walls. Do not set an aluminium bead into lime-cement plaster.
- Buy beads with some spare, in 2.5 m or 3 m lengths depending on room height, so a vertical corner does not need a joint.
- Wear safety glasses and gloves when hacking off an old corner.
- Work on one corner at a time, so the material does not start to set before the bead is aligned.
- Check plumb with a level on both faces of the corner, not just one.
- Apply several thin coats rather than one thick one, and allow the drying time stated on the packaging between them.
- Wear a dust mask and glasses when sanding, and sand only until the unevenness is gone, not down to the metal.
If there is a socket or switch near the corner, switch off the relevant circuit breaker at the consumer unit before working near it and do not interfere with the wiring itself.
Frequently asked questions
The guide price in the price list is €2.90 per running metre. Expect to pay more mainly for hacking off old corners, for filling with sanding and for many short edges around windows.
External corners that are plastered, skimmed or made of plasterboard get a bead in practically every case. Without one, it is hard to form a straight edge and it chips easily at the first knock.
Yes, this is common. Loose plaster and thick layers of paint are removed from the corner, including stripping old oil paintwork where gloss has been used, the background is consolidated with primer and the bead is set into new filler or plaster.
PVC is more often chosen for damp rooms because it does not corrode. Aluminium can be used under gypsum filler or skim if it is properly bedded and protected by the final finish. An aluminium bead does not belong in lime-cement plaster in a bathroom without the manufacturer's approval. A plain steel bead is not recommended for damp areas.
Only when all coats of filler are completely dry and sanded. Drying time depends on coat thickness, temperature and humidity in the room, so follow the filler manufacturer's data. The corner is primed before painting.
If the bead under the filler is straight and firmly fixed, it is enough to clean the damaged spot and fill it again. If the profile is bent or hollow, the damaged section is cut out and replaced with a new piece joined exactly in line with the rest of the corner.
On external wall insulation, the beads are part of the whole system and the work is carried out at height from scaffolding. It is safer to leave them to the company installing the insulation, which knows the system manufacturer's procedure.
Related work
How to recognise old distemper, why it must come off before repainting and how to scrape it without damaging the plaster. Steps, mistakes and checks.
How old oil paint is removed from walls, when sanding is enough, when to use a chemical stripper and how to prepare the wall for new paint.
When walls, ceilings or floors need priming, which primer to choose and how to apply it properly. The main types and the mistakes to avoid.
How wall and ceiling skimming works, which skim coat to choose, what makes the job harder and how to check a smooth surface before painting.
How a ceiling is skimmed step by step, which compounds suit concrete, plaster or plasterboard, how long it takes to dry and how to check the work.
How Venetian plaster is applied, what base it needs, where it suits, common polishing mistakes and how to check the finished wall.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.