Building work price list: Stripping Old Oil Paintwork
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparation | ||||
| Scraping off old oil-based paint | m² | €5.40 / m² | m² | enter quantity- |
| Crack bridging and repair of large cracks | lm | lm | - | |
| Acrylic sealing of joints | lm | €1.90 / lm | lm | enter quantity- |
| Priming walls and ceilings | m² | €1.00 / m² | m² | enter quantity- |
| Scraping off old (water-based) paint | m² | €3.50 / m² | m² | enter quantity- |
| Local crack repairs and patching | pcs | €3.50 / pcs | pcs | enter quantity- |
| Skimming walls | m² | €6.50 / m² | m² | enter quantity- |
| Skimming ceilings | m² | €7.50 / m² | m² | enter quantity- |
| Venetian plaster - polished finish | m² | m² | - | |
| Fitting corner beads | lm | lm | - | |
| Removing old wallpaper | m² | €3.50 / m² | m² | enter quantity- |
Why old oil paint causes problems
Oil-based paint was once used wherever a wall needed to be wipeable: kitchens and bathrooms in older flats, hallways, schools and stairwells, often up to dado height. It is hard and shiny, and that is why modern emulsion paints do not stick to it. New paint has nothing to key into on the smooth surface and eventually starts to peel.
Stripping old oil paintwork is preparation. It is needed when the wall is to be repainted, wallpapered or tiled and the old coating is cracked, flaking or built up in several layers. It is not the decorating itself. It is one of the more demanding jobs within painting and decorating and a specific case of stripping old paint in general. The result is a bare, clean, slightly rough wall that is ready for the next stage.
How can you tell it is oil paint? It is gloss or eggshell, hard, water runs off it and when tapped it feels like a thin shell. A more reliable check is a solvent test: rub an inconspicuous spot with a cloth dampened with acetone or white spirit. Emulsion softens and colours the cloth, while oil paint barely changes after a short rub.
Does oil paint always have to be removed completely?
Not always. The condition of the coating decides.
- Sanding and priming is enough: if the oil paint is sound, well bonded and not flaking anywhere, it is often enough to sand it thoroughly, degrease it and apply an adhesion (bonding) primer as recommended by the manufacturer.
- Strip back to the plaster: if the paint is cracking, blistering, can easily be lifted with a fingernail or there are several coats on the wall. Otherwise the new paint will sooner or later peel off together with the old.
You can check the soundness of the coating yourself. Try to lift the paint with a knife in several places, especially at edges, around switches and near the floor, where the wall takes the most wear. If the paint comes away easily in larger pieces, full removal cannot be avoided.
What to decide before ordering the work
- What will go on the wall afterwards. For paint or wallpaper the surface must be smooth and evenly absorbent. For tiling, strength matters more: tile adhesive does not bond reliably to gloss paint, so loose paint is removed before tiling and the background is prepared according to the adhesive manufacturer's instructions.
- Full removal or just preparing sound paint. If the paint is sound, discuss with the decorator whether sanding and a bonding primer would do. It saves time and dust.
- The exact area. Oil paint is often only up to dado height. Agree whether only the painted band is stripped, the whole wall, or also window reveals and the areas behind radiators.
- What the price includes. Ask whether the quote covers masking, washing down, priming, filling and cleaning up, or only the stripping. This is a common difference when comparing quotes.
- Lead in old paint. In older houses the paint may contain lead. If you live in an older property and are unsure, have the paint tested and do not dry-sand the wall.
- Communal areas. In a block of flats, contact the managing agent, freeholder or residents' association before any work on communal areas (hallway, stairwell).
How oil paint is removed from a wall
The method is chosen according to the background (plaster, concrete, plasterboard), the number of coats and the size of the area. In practice methods are often combined.
Hand scraping
A scraper, a stiff filling knife and a wire brush. Suitable for smaller areas and places where the paint is already flaking. The decorator has good control and, working carefully, will not damage the plaster, but it is hard work and slow on large walls. Today it is used mainly for details around door frames, in corners and behind radiators.
Machine sanding
A random orbital or orbital sander with coarse abrasive, and for larger areas a long-reach (giraffe) sander. It is fast and also roughens the surface so the new coat adheres. It works best on a flat, sound background. It creates a lot of fine dust, so dust extraction and a respirator always go with the sander. Pressing too hard can easily sand through softer plaster.
Chemical stripper
A gel, paste or liquid product is applied with a brush or knife and left to work according to the manufacturer's instructions. On a thin coat this is usually several tens of minutes; on thick multi-layer paintwork, paste strippers are sometimes left for several hours, occasionally covered with film so they do not dry out. The softened paint is then scraped off. Chemicals help with thick, firmly bonded layers that would otherwise take days to scrape. They require ventilation, gloves, goggles and thorough washing off of residues. With alkaline (caustic) products the wall must also be neutralised after stripping as the manufacturer specifies, otherwise residues can damage subsequent coats.
Combination
With multi-layer paintwork, the paint is often first softened with stripper, scraped off and the remaining traces sanded. The result is a clean, slightly rough background ready for the next steps.
How the work proceeds step by step
- Masking: the floor is covered with dust sheets or film, edges, door frames and windows are masked with tape. Furniture is removed or covered.
- Electrics: before removing socket and switch faceplates, the relevant circuit is switched off at the consumer unit and the back boxes are taped over. The wiring itself is not touched - that is a job for a qualified electrician.
- Test patch: the decorator checks how the paint behaves under the scraper and after applying stripper, and chooses the approach accordingly.
- Removing loose paint: with a scraper held at a low angle so the plaster is not damaged.
- Firmly bonded layers: stripper is applied, and after the dwell time the softened paint is scraped off, with a further application if needed.
- Sanding back: remaining traces and islands of paint are sanded with an extracted sander, corners and details by hand.
- Washing down: the wall is washed with water and sugar soap or a degreaser, stripper residues are removed and, depending on the type of stripper, the surface is neutralised.
- Drying: the wall must dry thoroughly, usually for at least a day.
- Priming and filling: a deep-penetrating primer or stabilising solution is applied, and once dry, cracks and holes revealed under the paint are filled.
- Sanding and dusting: the filler is sanded with fine abrasive (around 120 to 180 grit), the wall is vacuumed and wiped with a damp cloth.
- Priming before painting: the filled areas, or the whole wall, are primed again so that filler and plaster absorb paint evenly. More detail is given under priming walls and ceilings.
After that an undercoat or mist coat can be applied, followed by the finish paint, usually in two coats. How many coats are actually needed depends on the paint and the background. A wipeable or kitchen and bathroom paint suits kitchens and hallways, standard emulsion suits ordinary rooms.
If the plaster turns out to be crumbling or hollow under the paint, skimming the wall or plaster repair follows. That is a separate job, best agreed in advance at least as an option.
What the price depends on
The guide price for labour is €5.40 per m². The actual cost can differ considerably, because oil paint behaves differently on every wall. The main factors are:
- Number of coats: each extra coat means another round of scraping or stripper. A wall with three or four coats can take several times longer than a single thin coat.
- Adhesion of the paint: paint that is already flaking comes off quickly and the price tends to be at the lower end. Hard, well-bonded paint resists and often needs chemical stripper.
- Complexity of the area: a flat wall goes quickly, a small bathroom with pipes, corners and door frames takes much longer. Per m², small and awkward areas therefore cost more than large flat ones.
- Condition of the plaster: if it crumbles under the paint, filling or skimming is added, usually charged separately.
- Method chosen: chemicals mean more material, protection and washing down; sanding means equipment and dust extraction.
- Background: hard concrete allows more aggressive work, while soft old plaster or plasterboard needs care and therefore more time.
- Height and access: a dado-height band is done from the floor, while a full wall in an older house with high ceilings or a stairwell needs a scaffold tower or podium steps.
- Masking and cleaning: preparing an occupied, furnished home takes more effort than an empty room.
- Extra precautions: where dry sanding must be avoided and waste handled more carefully, the work is slower and more expensive.
How to prepare so the work does not take longer than necessary
- A cleared room: when the decorator does not have to move furniture, work can start straight away. Wall units on a wall that needs stripping are best removed beforehand.
- Water and electricity: the decorator needs water for washing down and a socket for the extracted sander on a circuit that stays on. If the circuit for the whole room is switched off, an extension lead from another part of the home helps.
- Ventilation and temperature: chemicals need ventilation and the wall needs drying time after washing. In an unheated home in winter or a room without a window, everything takes longer.
- Radiators: if paint is to be removed behind a radiator, it is easier to have a plumber take it off beforehand. Otherwise a strip remains behind it that is hard to reach.
- Clear scope: when it is agreed in advance where the area ends and what follows stripping, there are no unnecessary breaks for decisions.
- Consent in a block of flats: for communal areas, allow time to obtain consent and check the hours when noisy work is permitted.
Typical mistakes and how they show later
Painting over undegreased gloss. The new paint looks fine for a few weeks, then starts peeling in whole strips.
Stripper residues not washed off or neutralised. They can cause stains, a change of shade or poor adhesion of later coats.
Sanding without extraction. Dust spreads through the whole home and is unhealthy to breathe, all the more so with old paint.
Skipping primer, especially after filling. Bare plaster and filled areas absorb paint differently and show as patches after painting.
Rushing. Painting a damp wall or cutting the stripper's dwell time comes back later as repairs.
Islands of old paint left behind. Edges between old paint and bare plaster show through the new paint unless they are feathered in.
Plaster gouged or oversanded. Too much pressure on the sander or a scraper held too steeply leaves hollows and scores. After painting they are visible in raking light, and the fix means skimming the whole area.
Unprotected door frames, radiators and floors. Stripper damages the finish on frames and floors and leaves dull marks that cannot be washed off.
DIY guide: removing oil paint from a wall
A smaller area can be tackled yourself if you have patience and protective equipment. The procedure is the same as in the steps above. For large areas or paint of unknown composition, it is more sensible to call a decorator. When doing it yourself, it pays to:
- start on a small test patch and only then buy stripper in a larger pack,
- wear chemical-resistant gloves, safety goggles and a respirator, even when scraping by hand,
- work in small sections so the stripper does not dry before the paint is scraped off,
- hold the scraper as flat as possible and apply stripper again rather than forcing it and gouging the plaster,
- use a sander connected to a vacuum or dust extractor and never dry-sand without extraction,
- not skip washing down, drying and two rounds of priming, even if the wall looks clean.
Do not pour scraped paint or stripper residues down the drain. The product packaging explains how to dispose of them.
How to check the finished work
Before painting, go over the wall in raking light, for example with a torch held against the wall. Check that:
- the old paint has been removed from the whole agreed area, including corners and behind radiators,
- the surface is matt and slightly rough, with no glossy spots,
- the plaster is sound and does not crumble when you run your palm over it,
- the plaster has no hollows or scores from the sander or scraper,
- the wall has been washed, with no grease or chemical residues,
- the wall is dry to the touch and to the eye, with no dark damp patches,
- every crack and hole has been filled and sanded,
- the transition between filler and plaster is inconspicuous in raking light,
- filled areas have been primed so they do not look more absorbent than the surroundings,
- door frames, radiators, windows and the floor show no traces of stripper,
- the area has been cleaned up and the masking removed or left ready for painting.
Frequently asked questions
Roughly €5.40 per m². The final price depends mainly on the number of coats, how firmly the paint adheres, how awkward the wall is and whether the quote also covers washing down, priming and filling.
It is not a good idea. Emulsion does not adhere to smooth oil paint. Sound oil paint must at least be sanded, degreased and coated with a bonding primer, and loose paint must be removed.
It depends on the number of coats, adhesion and the complexity of the wall. A single coat that is already flaking is quick for a decorator, while several firmly bonded coats needing stripper can take several days, including the stripper's dwell time and drying of the wall.
It can be used if the manufacturer's instructions are followed, with good ventilation and protective equipment. Children and pets should stay out of the room during the work, and residues must always be washed off thoroughly.
Usually yes, especially if the exposed plaster is absorbent or uneven. Primer strengthens the surface and evens out its absorbency, so the new paint dries evenly without patches. The right primer depends on the background and the paint manufacturer's instructions. Bare plaster usually gets a deep-penetrating primer or stabilising solution, while areas where sound oil paint remains are better suited to a bonding primer.
Not always. If the plaster is sound and flat, filling cracks and holes is enough. If the plaster crumbles, has many hollows or there are islands of old paint that cannot be feathered in, a full skim is usually the more sensible option.
Lead can be present in very old paintwork. If you are unsure, have the paint tested, do not dry-sand it and consider a professional with suitable protection.
Related work
How to recognise old distemper, why it must come off before repainting and how to scrape it without damaging the plaster. Steps, mistakes and checks.
When walls, ceilings or floors need priming, which primer to choose and how to apply it properly. The main types and the mistakes to avoid.
How wall and ceiling skimming works, which skim coat to choose, what makes the job harder and how to check a smooth surface before painting.
How a ceiling is skimmed step by step, which compounds suit concrete, plaster or plasterboard, how long it takes to dry and how to check the work.
How Venetian plaster is applied, what base it needs, where it suits, common polishing mistakes and how to check the finished wall.
How cracks in walls, ceilings and plasterboard are taped and filled, which tapes and fillers to use, and how to check that the repair will last.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.