Price list 2026 · Europe

Venetian Plaster - Polished Stucco

Venetian plaster is a polished finish built up from several thin coats that looks like glossy stone once burnished and waxed. Labour costs around €49.00 per m², depending mainly on the wall's condition, the number of coats and the effect required.

Updated 09/2026·10 min read·11 price list items
Standard labour price
€49.00/ m²
Indicative range
€39.20 - €63.70
60 m² flat
€7350.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Venetian Plaster - Polished Stucco

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Painting and decorating11 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Preparation

Venetian plaster - polished finishm²€49.00 / m²m²enter quantity-
Scraping off old oil-based paintm²€5.40 / m²m²enter quantity-
Crack bridging and repair of large crackslmlm-
Acrylic sealing of jointslm€1.90 / lmlmenter quantity-
Priming walls and ceilingsm²€1.00 / m²m²enter quantity-
Scraping off old (water-based) paintm²€3.50 / m²m²enter quantity-
Local crack repairs and patchingpcs€3.50 / pcspcsenter quantity-
Skimming wallsm²€6.50 / m²m²enter quantity-
Skimming ceilingsm²€7.50 / m²m²enter quantity-
Fitting corner beadslmlm-
Removing old wallpaperm²€3.50 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What Venetian plaster is and why people choose it

It is neither paint nor wallpaper. A specialist plasterer or decorator applies several very thin coats with a stainless steel trowel, using short strokes in different directions. The final coat is compressed and burnished, then waxed and polished. The result is a smooth surface with soft veining and depth, similar to marble. The pattern comes from the craftsman's hand, so every wall is unique. Within painting and decorating, it is one of the most demanding decorative finishes.

People choose it to make one wall a feature, for example behind a sofa or bed, or in a hallway. It is also chosen as an elegant, jointless finish that can be wiped clean. It goes on a finished, flat and sound wall as the last decorative layer.

What to decide before booking a tradesperson

Polished plaster is hard to change once finished, and repairs often show. It is worth settling a few things in advance:

  • Which wall or area: a whole room, one wall, an alcove or just a strip behind the bed. Venetian plaster looks best as a feature on one wall. In a whole room, especially in a dark shade, it can feel heavy.
  • Colour and sheen: ask for a large sample board and look at it in the room in both daylight and artificial light. A small swatch looks different from a full wall.
  • Type of material: lime-based plaster or synthetic resin-based plaster. The differences are described below.
  • Electrics and lighting: sockets, switches, the TV supply and lights must be agreed and finished first. A channel chased out later or a moved socket leaves a patch in the finished plaster that differs from the surrounding area. A spotlight from the side brings out the pattern, but also every imperfection. Electrical work must be done only by a qualified electrician.
  • Condition of the wall: if the wall is out of true or cracked, it needs repairing first. Allow for this in both the budget and the schedule.

How polished plaster is applied step by step

This is slow, hand-applied work. Each coat is very thin, and timing has the biggest influence on the result. The work usually follows this order:

  1. Masking and protection: the floor, adjacent walls, door linings and window frames are covered with sheeting and masked with tape. Socket and switch faceplates are removed with the circuit switched off at the consumer unit.
  2. Preparing the surface: the wall must be flat, sound, dry and clean. Holes and cracks are filled, and loose old coatings are removed - see stripping old paint, or stripping old oil paintwork where gloss or oil-based paint is present. Flatness is checked with a long straightedge and raking light. A glossy surface highlights every imperfection, so this stage often takes longer than the plastering itself.
  3. Priming: the surface is coated with the primer recommended by the plaster manufacturer to even out its absorbency. More on this in priming walls and ceilings.
  4. Base coat: the first coat is spread thinly with a stainless steel trowel to even out minor irregularities. It is left to dry as the manufacturer specifies, usually a few hours. Any thicker spots are lightly sanded.
  5. Pattern coats: the second and further coats are applied with short strokes in different directions. This creates the typical marble effect. Usually two to four thin coats are applied, each only once the previous one is dry. With thin coats, total material use is typically around one kilogram per m², and the manufacturer gives the exact figure.
  6. Compressing and burnishing: the final coat is compressed and burnished at the right moment, when it is no longer wet but not yet fully hard. This is when the sheen starts to appear.
  7. Waxing and polishing: once dry - depending on the material, the next day at the earliest, and with lime plasters sometimes after several days - a thin layer of wax is applied and polished with a cloth or trowel. Wax deepens the colour, raises the sheen and protects the surface from water and dirt.
  8. Finishing: tape and sheeting are removed, faceplates are refitted and the whole area is checked under raking light.

With a good substrate, one wall usually takes two to four days, most of which is drying time. Lime plaster then continues to harden over several weeks, so it should only be wiped gently during that time.

Materials and options: what to choose

  • Lime-based Venetian plaster is the traditional option, made with marble dust. It is vapour-permeable and, being alkaline, less prone to mould. It suits living spaces best. In bathrooms it is traditionally protected with a soap solution as well as wax, which improves its water resistance.
  • Synthetic resin-based plaster is easier to work and tends to be more abrasion-resistant. However, it is usually less breathable.
  • Waxes are available in natural and synthetic versions, some with a pearlescent or metallic effect. A thick layer of wax reduces vapour permeability, so it is applied thinly.
  • Colour can be white, pre-tinted or mixed to match a sample. Light and mid tones are more forgiving of small flaws, while dark and metallic shades show every stroke.

The tools needed are stainless steel trowels and smaller spatulas for corners, fine abrasive paper and clean cloths. The trowel must be free of scratches, otherwise it transfers them to the wall.

Venetian plaster cost per m²: what affects it

The guide labour price is €49.00 per m². The actual price may differ depending on these factors:

  • Condition of the wall: a flat, primed wall ready for plastering is the cheapest case. An uneven or damaged wall needs more filling and sanding, and a wall that is out of true may need skimming over the whole area. This preparation can add noticeably to the cost, sometimes more than the Venetian plaster itself.
  • Number of coats and sheen level: each extra coat means more application, drying and burnishing. A high, mirror-like gloss is more demanding than a soft satin finish.
  • Special effects: pearlescent finishes, metallic pigments or several colours on one surface increase both material cost and labour.
  • Complexity of the area: many corners, reveals, sockets and switches slow the work down. Reveals and edges are sometimes priced separately.
  • Height and access: tall walls, areas above a staircase or behind fixed furniture need a scaffold tower or slower working.
  • Size of the job: for a small area, such as a single alcove, the price per m² is often higher, because preparation, colour mixing and drying time take about as long as for a larger wall.
  • Materials: the cost of plaster and wax varies between manufacturers. When comparing quotes, ask whether materials are included and which products exactly.

How to prepare your home so the work runs smoothly

A fresh coat is sensitive to dust, draughts and temperature changes. Much of this is within your control:

  • A cleared room: furniture out of the room or at least two metres from the wall, covered and set aside. Moving furniture during the work causes delays and stirs up dust.
  • No other trades at the same time: sanding, cutting or sweeping next to a fresh coat means dust sticks to it. Venetian plaster goes on after all dusty work is done, and the floor should be finished or thoroughly covered.
  • Stable temperature and no draughts: windows closed during application, no direct sunlight on the wall and no fan or fan heater pointed at the surface. Most materials should not be applied below +8 °C, and the technical data sheet gives the exact limit.
  • A dry wall: new plaster or patch repairs must be dry before work starts. Waiting for them to dry pushes back the whole schedule.
  • Access to water and power: the tradesperson needs to wash trowels and light the wall.
  • An approved sample: when the colour and effect are signed off in advance, there are no delays on the wall itself.

Where it works and where it does not

Venetian plaster suits living rooms, bedrooms, hallways, landings and offices. When waxed, it can also be used in a kitchen away from the worktop and in a bathroom away from direct splashing. Some people order it for a shower enclosure instead of tiles and are then surprised that the surface changes in a permanently wet area. Other systems, such as specialist waterproof finishes, are designed for that zone. Ask the contractor about them before deciding.

Walls that are damp or show mould are also unsuitable. Venetian plaster will not fix the cause, so the damp must be dealt with first.

As a decorative finish inside your own home, it usually needs no formal approval. If you want to treat walls in the communal areas of a building, agree this in advance with the managing agent or freeholder.

Typical mistakes and how they show later

  • Poorly prepared surface: on dusty or greasy areas the plaster flakes off, often only after some time. Irregularities that nobody noticed under paint stand out as shadows and waves once polished.
  • Coat too thick: it dries slowly and can crack. Cracks appear as a fine network and do not disappear under the wax.
  • Uneven strokes: patches, stripes and blotches appear. On a glossy surface they are visible whenever you look against the light.
  • Burnishing at the wrong moment: on a wet coat the plaster drags. On one that is too dry, the sheen is hard to achieve and tends to be uneven. Wax partly evens it out, but dull patches often remain.
  • Thick or uneven wax: the surface looks blotchy and artificial, can feel tacky and attracts dust.
  • Working in a draught or direct sunlight: the plaster dries too quickly, cannot be properly polished and dull spots form.
  • Stopping in the middle of a surface: when one wall is done in two sessions, a visible line remains where the work joins. A continuous surface is therefore completed in one go.

Flaws that would disappear with ordinary painting show immediately here. They can often only be corrected by removing the entire top layer.

How to check the finished wall

  • look at the wall against the light from the window and under the angled light of a lamp to check for waves or obvious irregularities,
  • the pattern should look even across the whole surface, with no sharp boundaries between sections,
  • the sheen should be uniform, without dull patches or wax smears,
  • the surface must have no cracks, bubbles or flaking areas,
  • the colour matches the approved sample,
  • corners, edges and the areas around sockets should be cleanly finished,
  • adjacent walls, the ceiling, floor and door linings are free of plaster and wax,
  • ask for the name of the plaster and wax used, the colour reference and care instructions,
  • agree that any leftover material stays with you for future repairs.

DIY guide: a test panel before your first wall

A competent DIYer can try polished plaster, but it takes practice and basic protection. Lime plaster is alkaline and irritates skin and eyes, so gloves and safety glasses are worn when mixing and applying. If it gets into an eye, rinse immediately and thoroughly with clean water for a long time. Start on a board or a small wall that is not the room's main feature, and follow the technical data sheet for the specific product.

  1. Clear the room, cover the floor and mask the surrounding area with tape. Switch off the circuit before removing socket and switch faceplates.
  2. Check the wall with a long straightedge, then fill and sand any irregularities.
  3. Dust the surface and apply the primer recommended by the plaster manufacturer.
  4. Spread a thin base coat and leave it to dry.
  5. Apply further thin coats with short criss-cross strokes, each once the previous one is dry.
  6. Compress and burnish the final coat with a clean trowel once it is no longer wet but not yet hard.
  7. When fully dry, apply a thin layer of wax and polish it with a cloth.
  8. Wash and dry the trowels straight away so no residue is left on them.

If the sample does not turn out as hoped, that is normal. For a feature wall, use an experienced specialist.

Frequently asked questions

The guide labour price is €49.00 per m². The final figure depends mainly on the condition of the wall and the preparation needed, the number of coats, the sheen level, any special effects, the complexity of the area and whether materials are included.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.