Building work price list: Basin Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Sanitaryware installation cost | ||||
| Basin installation | pcs | €35.00 / pcs | pcs | enter quantity- |
| Bath installation (tiling work) | pcs | €61.00 / pcs | pcs | enter quantity- |
| Bath boxing-in and waste connection | pcs | pcs | - | |
| Shower tray step construction and sloping | pcs | pcs | - | |
| WC concealed cistern frame installation + boxing in | pcs | pcs | - | |
| Close coupled WC installation | pcs | €45.00 / pcs | pcs | enter quantity- |
| Bath / shower mixer tap installation | pcs | €55.00 / pcs | pcs | enter quantity- |
| Basin mixer tap installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Installation of glass screen on shower tray | pc | €95.00 / pc | pc | enter quantity- |
| Installation of walk-in shower glass screen with U-channel | pc | pc | - | |
| Installation of glass bath screen | pc | pc | - | |
| Vanity unit installation | pcs | €60.00 / pcs | pcs | enter quantity- |
| Fixing mirror with adhesive | pcs | €50.00 / pcs | pcs | enter quantity- |
What basin installation includes and when it is needed
The basin is fixed firmly to the wall, onto a vanity unit or into a worktop. It is then connected to the water supply and waste, and the edge against the wall is sealed. Basin installation is needed during a bathroom refurbishment, when a cracked or dated basin is replaced, or when the basin has to be raised or lowered, for example for children or older people. A basin that lasts for years without leaks or movement depends mainly on correct fixings, new seals and the right order of work.
A standard installation includes fixing the basin, fitting the tap, waste and trap, connecting to the isolating valves and waste pipe, a leak test and sealing the joint. Removing the old basin, assembling a vanity unit, cutting a worktop, replacing isolating valves or altering pipework in the wall are often priced separately. When comparing quotes, it is worth asking exactly what the price includes and who supplies the materials. If the refurbishment also includes bath installation and waste connection, it makes sense to plan both jobs together so the plumber can do the connections in one visit.
What to decide before the basin is fitted
Most problems with basin installation start in the shop or at the bathroom planning stage. Before the tradesperson arrives, settle the following:
- Basin type: wall-hung, vanity unit, inset, semi-recessed or countertop. Each type places different demands on the wall and is fitted in a different way.
- Height: agree it in advance according to who will use the basin most. Typical figures are given in the questions at the end of this article.
- Position relative to the connections: the waste is usually on the centre line of the basin, and the isolating valves are set symmetrically to the left and right of it, at a height where the trap or the unit will hide them. If the connections are elsewhere, the pipework has to be altered, and this is done before the tiling work.
- Tap: a deck-mounted tap on the basin or a wall-mounted tap. Check the number and size of tap holes in the basin and the spout reach, so the water lands in the centre of the bowl. A wall-mounted tap needs the pipework in the wall prepared to exact measurements.
- Overflow: a basin with an overflow needs a slotted waste, a basin without one needs an unslotted waste, often with a click-clack plug.
- Vanity unit: whether it has cut-outs for the trap and supply pipes and whether it fits around the connections.
- Wall: find out what it is made of. This determines the fixings and, in a lightweight stud wall, whether reinforcement is needed.
If a socket or a light above the mirror is planned near the basin, the electrical work must be done only by a qualified, registered electrician. In England and Wales, work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. Strict rules apply to electrical installations in wet areas near water, and neither the plumber nor a DIYer should touch them.
How basin installation is done step by step
The tradesperson usually works in this order:
- Removing the old basin. When replacing a basin, the isolating valves are closed, the tap connectors and trap disconnected, the old silicone cut out and the basin taken down. The old fixings and the condition of the valves are checked.
- Setting out. The agreed height and position of the basin are marked, and the isolating valves and waste are checked against the basin openings.
- Drilling and fixing. Wall plugs or a chemical anchor are chosen to suit the wall, and threaded studs or brackets are fitted. Holes in tiles are drilled carefully so the tile does not crack.
- Fitting the tap. It is easier to fit the tap to the basin before the basin goes on the wall. A pair of flexible tap connectors is attached to it.
- Hanging and levelling. The basin is placed, levelled with a spirit level, and the nuts are tightened with care so the ceramic does not crack.
- Connecting. The tap connectors are joined to the isolating valves, the waste and trap are fitted, and the trap is connected to the waste pipe in the wall.
- Testing and sealing. The water is turned on, all joints are checked, and finally the joint between the basin and the tiles is sealed with sanitary silicone.
Wall-hung, vanity unit or inset: how the installation differs
Wall-hung basin
It hangs directly on the wall, so the fixings carry all the weight. It needs a solid wall of concrete or solid brick. With plasterboard or lightweight partitions, the wall needs a pattress, noggins or a support frame, and these must be built in before the wall is boarded and tiled. The advantage is that the floor under the basin is easy to clean and the bathroom feels more open. The trap is visible underneath, so a designer bottle trap is often chosen, or a semi-pedestal is added to hide it.
Basin on a vanity unit
The unit hides the trap and tap connectors and adds storage. During installation it is important that the unit stands or hangs level and firm and that the basin sits precisely on the carcass. Cut-outs for the trap are often made in the back panel of the unit, and their edges should be protected from moisture.
Inset, semi-recessed and countertop basins
These basins are fitted into or onto a worktop. The installation is more demanding, because the opening has to be cut precisely to the manufacturer's template and the joint between basin and worktop thoroughly sealed. With countertop basins, check the tap height: if the tap is too low or too short, water splashes outside the bowl.
What affects the price of basin installation
The guide labour price is €35.00 per piece. It applies to a standard installation onto prepared connections. The final amount depends mainly on:
- Basin type: the simplest job is a like-for-like replacement of a wall-hung basin on a solid wall. A vanity unit adds assembly and levelling of the unit. An inset or semi-recessed basin with a worktop cut-out takes considerably more work, and the cut-out is often charged separately.
- Wall construction: standard fixings are enough for concrete and solid brick. Hollow brick, aircrete blocks or plasterboard need special fixings or a chemical anchor, which takes longer and costs more in materials.
- Tiles: thick or brittle tiles, for example large-format porcelain, are drilled more slowly and with more risk.
- Condition of the isolating valves: old seized valves need replacing, which is an extra item and sometimes means turning off the water for the whole flat or building.
- Waste position: if the waste is at a different height from what the new trap needs, or the old pipe is damaged, it has to be altered. When the wall and tiles are opened up, this often costs much more than the installation itself.
- Tap: a deck-mounted tap is a normal part of the installation. A wall-mounted tap with concealed pipework is a separate, more labour-intensive job.
- Removal and disposal: taking down the old basin, cutting out silicone and taking away the waste are often charged separately. Before you hand over the old basin and rubble, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Size and weight: a large ceramic or stone basin, or a double basin, needs two people and stronger fixings.
What speeds up basin installation and what slows it down
A like-for-like replacement on a solid wall with working valves and the waste in the right place usually takes about one to two hours. A basin with a vanity unit or a worktop cut-out often takes half a day. If the pipework in the wall needs altering, the work can stretch over several days, because the tiling repair also has to wait. The curing time of the silicone comes on top. On the customer's side it helps to:
- have the basin, tap, waste and vanity unit on site before the tradesperson arrives and check them for transport damage,
- check that the tap fits the basin tap hole and that the waste matches whether the basin has an overflow,
- check in advance that the isolating valves and the main stopcock can be closed,
- have the tiling finished and the grout dry, so the sealant is not applied to a damp surface,
- keep photos or a sketch of the pipe runs in the wall from before tiling, so no pipe is hit when drilling,
- clear the bathroom and give free access to the basin and the unit.
The work takes longer when materials are missing or do not match what was agreed and the tradesperson has to wait, when the basin type is changed on site, or when spare parts have to be sourced.
In a block of flats, remember that the waste and supply pipes connect to shared stacks and risers. If the work would affect a shared stack or require turning off the water for the whole building, agree it in advance with the managing agent or management company. For a larger bathroom remodel with changes to the pipework, remember that some plumbing work, such as certain bidets, pumps or large baths, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify.
Typical mistakes and how they show up later
Weak fixings. Ordinary wall plugs in hollow brick or aircrete pull out over time. The basin first wobbles slightly, then the silicone tears and water gets behind the basin. Hollow materials need fixings designed for them, either mechanical or a chemical anchor with a mesh sleeve that stops the resin running into the cavities. Fixings should be chosen for the substrate, not by what came in the box.
Overtightened nuts. The ceramic cracks at the fixing, often only after some time. Nuts are tightened with care and with a washer.
Old trap and old seals. This saves a few minutes, but this is exactly where leaks most often occur. The leak is usually slow, so it is only noticed from a swollen vanity unit or a stain on the floor. A new basin should get a new trap and new seals.
Wrong sealant. Ordinary acrylic or silicone without a fungicide soon turns black in a bathroom. Sanitary silicone is used.
Silicone applied before testing. If a leak appears after sealing, the joint has to be cut out. Water test first, then sealant.
Tap not matched to the basin. A short spout aims water at the edge of the bowl, a tall tap in a shallow basin splashes. Installation cannot fix this, the only solution is a different tap.
Basin not level. Water collects at one edge and runs to the silicone, which deteriorates sooner and starts to go mouldy.
Unprotected cut-out edges in the unit. Chipboard near the trap absorbs moisture and swells.
Hidden isolating valves. If the valves are concealed behind a fixed back panel of the unit, they cannot be closed quickly in an emergency.
DIY guide: replacing a basin on existing connections
If a basin is being replaced with a similar one, the wall is solid and the isolating valves close without problems, the job can be done as DIY. If there is any doubt about the wall or the valves, call a plumber. Do not touch any electrical installation near the basin. The tools needed are a spirit level, a drill, spanners, sanitary silicone and a new trap.
- Close the isolating valves and open the tap to release the pressure.
- Place a container under the trap, unscrew the trap and tap connectors.
- Cut out the old silicone, loosen the nuts and carefully take down the old basin, ideally with two people.
- Check the old fixings. If they are loose or do not match the new basin, mark and drill new holes and fit fixings suitable for the substrate.
- Fit the tap, waste and tap connectors to the new basin according to the manufacturer's instructions.
- Place the basin on the fixings, level it with a spirit level and tighten the nuts with care.
- Connect the tap connectors to the isolating valves and fit the new trap.
- Slowly open the valves, fill the basin completely, drain it and check all joints with a paper towel.
- After a successful test, clean and degrease the joint with the tiles and seal it with sanitary silicone.
- Let the silicone cure as the manufacturer specifies, usually about one day, before using the basin normally.
Checking the finished work at handover
Before accepting the work, check that:
- the basin is level and does not move when pressed by hand,
- the height and position match what was agreed,
- there are no cracks or chips in the ceramic around the fixings,
- nothing drips from the trap, waste or tap connectors when the basin is filled completely and drained,
- the isolating valves can be closed and opened and are accessible,
- water drains freely and there is no smell from the waste,
- the tap is firm and hot and cold are on the correct sides,
- the silicone joint is continuous, smooth and without gaps,
- with a vanity unit, the cut-out edges are protected and the unit stands or hangs level,
- the area is clean and the instructions and guarantees for the basin and tap have been handed over.
The same handover principles apply to other bathroom jobs, such as a bath panel enclosure or constructing a shower kerb with a fall, where level, sealing and access also need checking.
Frequently asked questions
The guide price is €35.00 per piece for a standard installation onto prepared connections. Expect to pay more for a lightweight or hollow wall, for assembling a vanity unit or cutting a worktop, for replacing isolating valves and for altering the waste.
The top edge of the basin is usually set at around 80 to 90 cm above the floor. It is set higher for tall people and lower for children or older people. For a countertop basin, both the worktop height and the bowl height are taken into account.
Yes, but only if the wall has a pattress or a support frame designed for sanitaryware. Plasterboard fixings alone will not hold the weight of the basin and a person leaning on it over the long term.
Yes, it is worth it. Old seals are hardened and often get damaged during removal. Compared with the risk of leaks into the unit or behind the tiles, new parts save a lot of work and trouble.
The tradesperson turns the water on during the leak test, before sealing. After sealing, however, let the silicone cure according to the manufacturer's instructions, usually about one day. Only then use the basin normally and wet or wipe the joint.
Replacing a basin on existing pipework is routine maintenance. For a larger remodel with changes to the pipework, check whether the work has to be notified to your water company before you start (an approved WaterSafe plumber can self-certify instead), and in a block of flats agree the work in advance with the managing agent or management company.
Related work
How a built-up shower kerb and base is constructed, what fall it needs, which materials suit it and what to check before tiling and at handover.
How a bath is fitted properly: levelling, waste and trap connection, boxing in, waterproofing and sealing, plus common mistakes and how to check the work.
How a built-in bath is boxed in, which materials to use for the panel wall, why waterproofing and an access hatch matter, and how to check the finished work.
How floor-standing and wall-hung vanity units are fitted, what makes the job harder, the mistakes to avoid and how to check the finished work.
How to stick a mirror to plaster, plasterboard or tiles, which adhesive to choose, what to avoid and how to check the finished job.
How a close-coupled WC is fitted and connected, which waste outlet you have, what complicates the job and how to check it stands firm and does not leak.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.