Building work price list: Bath Panel Enclosure
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Sanitaryware installation cost | ||||
| Bath boxing-in and waste connection | pcs | €75.00 / pcs | pcs | enter quantity- |
| Bath installation (tiling work) | pcs | €61.00 / pcs | pcs | enter quantity- |
| Shower tray step construction and sloping | pcs | pcs | - | |
| WC concealed cistern frame installation + boxing in | pcs | pcs | - | |
| Close coupled WC installation | pcs | €45.00 / pcs | pcs | enter quantity- |
| Bath / shower mixer tap installation | pcs | €55.00 / pcs | pcs | enter quantity- |
| Basin installation | pcs | €35.00 / pcs | pcs | enter quantity- |
| Basin mixer tap installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Installation of glass screen on shower tray | pc | €95.00 / pc | pc | enter quantity- |
| Installation of walk-in shower glass screen with U-channel | pc | pc | - | |
| Installation of glass bath screen | pc | pc | - | |
| Vanity unit installation | pcs | €60.00 / pcs | pcs | enter quantity- |
| Fixing mirror with adhesive | pcs | €50.00 / pcs | pcs | enter quantity- |
Why a bath is enclosed and when it makes sense
A bath is enclosed almost every time a standard acrylic or steel bath on legs is fitted. This applies to a new bathroom and to a refit where an old bath is replaced.
A fitted bath stands on adjustable legs and on its own feels fairly unstable. When someone climbs in and the bath is filled, it flexes or shifts slightly. That movement tears the silicone joint between the bath and the tiles. Water gets into the crack, and over time mould or a damp wall appears under the bath.
The enclosure therefore does two jobs. The first is technical. The weight of the bath, the water and the bather is carried by the legs and, where needed, by a support under the base. The wall holds the bath from the front so that it does not rock or slide and the rim does not deflect under load. The rim can rest on the wall, but it is never joined to the tiles with a rigid material, only with a flexible silicone joint. The second job is appearance: the wall hides the legs, the trap and the waste pipes, and the bath blends in with the bathroom tiling.
Freestanding baths, which stand in the room as a separate piece of furniture, are not enclosed. They are designed to look good from every side. Some baths come with a ready-made plastic or acrylic bath panel. It covers the bath, but it does not hold it as firmly as a built wall, and tiles cannot be fixed to it.
What to decide before building the enclosure
Once the wall is tiled it is hard to change. These points are best settled before the first block is laid.
- The actual bath and its fitting instructions: the wall is built to suit the bath, not the other way round. The manufacturer states whether the base needs support, which sealing tape is recommended at the wall and how the bath should be separated from the tiles.
- Height of the bath rim: this sets the height of the wall. Allow for the thickness of adhesive and tiles so that the top row of tiles can slip under the rim.
- Wall material: aircrete blocks, brick, cement board, plasterboard or concrete. The differences are described in the next section.
- Position and size of the access panel: usually by the trap. On a whirlpool bath the opening must be large enough to service the pump.
- Shelves, a step or a wider ledge: agree these in advance, as they change the shape and material of the wall.
- Tiles: have them bought, ideally with a spare allowance. The tile size affects how high the wall should be and where the grout lines fall. More on choosing and laying tiles is in the overview of tiling services.
- Electrics near the bath: with a steel bath, supplementary bonding may be needed, meaning a conductive connection between the bath and the earthing of the electrical installation. Whether it is required in a particular bathroom is assessed by an electrician based on how the electrics in the flat or house are arranged. If it is done, the cable is connected to the lug on the bath before the wall is built. A whirlpool bath also needs a power supply. All these connections must only be made by a qualified electrician. In England and Wales, electrical work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.
What to build it from: aircrete, brick, boards or concrete
Aircrete blocks
These are the most common choice in practice. They are light and can be cut with an ordinary hand saw, so they adapt easily to the bath size, and they are laid with thin-joint mortar. They also dampen the noise of the bath filling a little. Aircrete does absorb moisture, so it must always be primed and tanked.
Bricks or dense concrete blocks
These are used where the wall has to carry more load, for example under a wide ledge. They are strong and less sensitive to moisture than aircrete, but heavier and slower to lay. Tanking under the tiles is still not skipped, as water would otherwise penetrate through the grout into the masonry. In a block of flats it is worth thinking about weight, although a single low wall is not usually a problem.
Fibre cement or cement boards
These are fixed to a metal stud frame much like plasterboard, but they cope with moisture far better and are stronger. Behind tiles around a bath they are a more durable choice than plasterboard, particularly for an unusual shape where building in blocks is awkward. They are also tanked before tiling.
Moisture-resistant plasterboard
Moisture-resistant plasterboard on a metal frame is a quick, light solution. It is, however, less resistant to impact and moisture, so tanking is even more important. The frame must be firmly fixed to both the floor and the wall, otherwise the tiles will crack over time.
Concrete and cast solutions
These appear in unusual bathrooms where the bath is sunk into a raised platform or forms part of a larger built structure. The result is solid but labour-intensive and needs formwork and a longer curing time. The same principles of falls and tanking apply as when constructing and creating a fall for a shower kerb.
Building a bath enclosure step by step
- Setting the bath: the bath is stood on its legs, levelled with a spirit level and the legs are secured with locking nuts.
- Connecting and testing the waste: the bath is connected to the waste, filled with water and the trap and joints are checked for leaks. Later they can only be reached through the access panel. Details are covered under bath installation and waste connection.
- Electrical connections: where the bathroom requires them, an electrician connects the bonding cable and, on a whirlpool bath, the pump supply.
- Supporting the base: where the manufacturer requires it, mainly with acrylic baths, the base is supported with a support frame or a bed.
- Sealing tape at the wall: bath seal tape is applied where the rim meets the wall to stop water getting behind the bath.
- First course: on an uneven floor the first course of blocks is bedded in sand and cement mortar so it sits exactly level. Thin-joint mortar will not take up larger irregularities.
- Building the wall: further courses are laid in thin-joint mortar. The front wall is built and, if the bath is not in a recess between two walls, an end wall too. The wall stops below the rim with an allowance for adhesive and tiles. Where it meets the room wall it is tied in, for example with wall ties or strips set in the joints, so it does not pull away.
- Access opening: an opening is left in the wall for the access panel and its frame is fitted.
- Curing the mortar: the wall is left to cure according to the mortar manufacturer's instructions.
- Priming and tanking: the wall is primed and coated with a tanking membrane. Tanking tape is set into the corners and at the floor junction so that the tanking on the wall links with the tanking on the floor and room walls.
- Tiling and grouting: the wall is tiled, the top row slipped under the bath rim and the tiles grouted. Choose a tile adhesive classified to BS EN 12004 (e.g. C2 for demanding substrates) and a grout classified to BS EN 13888 (e.g. CG2). A gap is left between the tiles and the bath, and it is not filled with adhesive or grout.
- Silicone sealing: the gap between bath and tiles is filled with sanitary silicone. With an acrylic bath it is best to seal while the bath is full of water. The bath is then loaded, drops slightly, and the joint does not tear once it is emptied. The water is only let out once the silicone has cured.
Bath enclosure cost per bath: what it depends on
The work is charged per bath and the price list item covers building the enclosure and connecting the bath to the waste. The guide labour price is €75.00 per bath. The final figure is mainly affected by these factors:
- Shape and position of the bath: a bath in a recess between three walls only needs a front wall, which is the simplest case. A bath with two open sides also needs an end wall tied in at the corner, which adds time, although a short end wall takes less work than the front. A corner or asymmetric bath requires a lot of cutting and is among the more demanding jobs.
- Condition of floor and walls: walls out of true and an uneven floor mean more levelling so the wall and tiles sit correctly.
- Access to the waste: if the trap is in an awkward place or the waste pipe needs altering, plumbing work adds time.
- Wall material: aircrete is the quickest. Brick and dense blocks mean longer laying, board systems on a frame need accurate framing, and a cast concrete structure with formwork is the most labour-intensive.
- Supporting an acrylic bath: if the manufacturer requires a support frame or bed under the base, this adds labour and materials.
- Ledges and shelves: extending the wall into a shelf or step adds labour and materials.
- Type of access panel: a simple plastic panel is quick. A magnetic panel tiled in the same tile is almost invisible but needs precise cutting and fitting.
- What the price includes: some quotes cover only the wall and waste connection, others also tanking, tiling and silicone. The electrician is usually charged separately. When comparing quotes it is worth checking exactly what each includes.
Preparing the bathroom: what speeds up the work and what holds it up
- The bath is bought, checked and in the bathroom before the tradesperson arrives, together with the legs, trap and fitting instructions.
- Tiles, adhesive and the access panel are on site, so no one waits for deliveries between steps.
- The waste pipe is ready in the right position and height before the bath is set. If the soil stack or shared pipework in a block of flats needs altering, agree this in advance with the managing agent or freeholder.
- You know where the water is turned off, and the bathroom is cleared. Some plumbing work, such as certain pumps or large baths, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify.
- The bathroom is warm. In the cold, mortar, tanking and grout dry more slowly.
- The electrician is booked for a date before the wall is built, so it does not wait for connections.
- The trades follow in the right order: plumber and electrician, building the wall, tanking, tiling, silicone. If the order goes wrong, something has to be redone. If the plumber is also fitting other sanitaryware, such as during basin installation, it helps to plan it in the same visit.
- In a block of flats you know in advance the hours when noisy work, such as cutting blocks and tiles, is allowed.
Typical mistakes and how they show up later
A bath with no access panel
While the trap works, nothing shows. The problem appears with the first fault, when the trap cannot be reached without breaking the tiles and part of the wall.
An acrylic bath without the support the manufacturer requires
The bath stands only on its legs and the base flexes under load. This shows as creaking, cracked silicone and in the worst case a crack in the base of the bath.
Gap at the bath filled with a rigid material
When the gap between bath and tiles is filled with adhesive or grout, every movement of the bath is passed into the tiling. The result is cracked grout, loose tiles and water behind the tiles.
Wall not tied into the room wall
Where the enclosure meets the wall, a vertical crack eventually appears in the tiled corner and lets water in.
First course not levelled
If the first course of blocks is fixed straight onto an uneven floor, the wall ends up crooked or leaning. The tiles then do not line up, the joints drift and the top row does not finish neatly under the rim.
No sealing tape between the bath rim and the wall
Water gets behind the bath. The first sign is often a damp patch or mould on the wall next to the bath, or stains on the ceiling of the neighbour below.
Aircrete without primer and tanking
The blocks soak up moisture, the tiles may come loose and damp and odours linger behind the wall.
Sealing an empty bath
The joint tears after the first few baths and has to be redone.
No allowance for the tiles
If the wall is built tight under the rim, there is nowhere to slip the tile. The top row has to be cut or stops below the rim, which looks unfinished and is harder to seal.
Building the wall without testing the waste
If the trap leaks, water runs under the bath unnoticed and the problem only shows on the floor or in the flat below.
DIY guide: enclosing a bath with aircrete
With basic skill with tools, a simple aircrete front wall can be built yourself following the steps above. These principles help when working at home:
- Leave the waste connection to a plumber, or at least have it checked before building the wall.
- Leave any electrical connection near the bath strictly to a qualified electrician.
- Have ready a spirit level, an aircrete saw, a notched trowel for thin-joint mortar, a rubber mallet and a brush or roller for primer and tanking.
- Before cutting blocks, measure the height under the bath rim in several places and deduct the thickness of adhesive and tiles.
- Check with a spirit level whether the floor is flat. If not, bed the first course in sand and cement mortar and only lay the next course once it has set.
- Check level and plumb on every course, as a crooked wall cannot be corrected with tiles later.
- Use primer, tanking membrane, tapes and silicone from a single system range and keep to the manufacturer's drying times.
How to check the finished work
- the bath does not move or creak when you step into it,
- the wall is flat and plumb, and the tiles show no bulges and sound solid when tapped,
- there is no crack in the corner between the enclosure and the room wall,
- the access panel opens and the trap is visible through the opening,
- the silicone joint is continuous, free of bubbles and well bonded to both bath and tiles,
- no water appears under or behind the bath after a test fill and drain, which can be checked with a torch through the access panel,
- the grout lines are even and the top row of tiles sits cleanly under the bath rim,
- the bath is clean, free of scratches and traces of adhesive or grout.
Frequently asked questions
In the price list, building the enclosure and connecting the bath to the waste costs a guide €75.00 per bath. The price rises mainly with an end wall, an unusual bath shape, an uneven floor, base support, shelves or a tiled magnetic access panel. Also check whether the quote includes tanking, tiling and silicone sealing.
Yes, it is always sensible. The trap can block or work loose, and the access panel is the only convenient way to reach it. The panel can be tiled in the same tile, so it need not spoil the look.
Follow the manufacturer's instructions. Some acrylic baths require extra support under the base, such as a support frame or a bed, so they do not flex under load. Steel baths are stiffer, but a solid front wall still helps.
It depends on how the electrics are arranged in the bathroom and in the whole flat or house. This is assessed by a qualified electrician. If a connection is needed, it must be made before the wall is built, otherwise the lug on the bath is hard to reach.
The wall itself is usually built in a day. The whole process takes longer because of curing time for mortar, tanking and grout, so with tiling and silicone sealing allow several days.
It can, but it takes more work. The bottom row of wall tiles at the bath rim usually has to be removed so the sealing tape can be fitted correctly and the tiles slipped under the rim. The tanking on the new wall must be linked to the tanking on the floor and walls, for example with tanking tape at the junction with the floor tiles. A matching tile also needs to be found, or a contrasting one chosen that looks deliberate. Check the condition of the trap before building, as later it can only be reached through the access panel.
Aircrete is stronger and more resistant to impact, so it is used more often for baths. If a framed wall is built, for example for an unusual shape, fibre cement or cement boards are more durable than moisture-resistant plasterboard. With every material, tanking before tiling is essential.
Related work
How a built-up shower kerb and base is constructed, what fall it needs, which materials suit it and what to check before tiling and at handover.
How a bath is fitted properly: levelling, waste and trap connection, boxing in, waterproofing and sealing, plus common mistakes and how to check the work.
How wall-hung, vanity and inset basins are fitted, what to watch with fixings and connections, and how to check the finished job.
How floor-standing and wall-hung vanity units are fitted, what makes the job harder, the mistakes to avoid and how to check the finished work.
How to stick a mirror to plaster, plasterboard or tiles, which adhesive to choose, what to avoid and how to check the finished job.
How a close-coupled WC is fitted and connected, which waste outlet you have, what complicates the job and how to check it stands firm and does not leak.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.