Price list 2026 · Europe

Geberit Frame Installation & Connection (Duofix / Kombifix)

Fitting a Geberit frame means setting a wall-hung WC frame into the wall, fixing it securely and connecting water and waste. With blockwork boxing-in, the guide price is €130.00 per piece. The waste position affects the price most.

Updated 09/2026·12 min read·13 price list items
Standard labour price
€130.00/ pcs
Indicative range
€104.00 - €169.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Geberit Frame Installation & Connection (Duofix / Kombifix)

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling13 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Sanitaryware installation cost

WC concealed cistern frame installation + boxing inpcs€130.00 / pcspcsenter quantity-
Bath installation (tiling work)pcs€61.00 / pcspcsenter quantity-
Bath boxing-in and waste connectionpcspcs-
Shower tray step construction and slopingpcspcs-
Close coupled WC installationpcs€45.00 / pcspcsenter quantity-
Bath / shower mixer tap installationpcs€55.00 / pcspcsenter quantity-
Basin installationpcs€35.00 / pcspcsenter quantity-
Basin mixer tap installationpcs€25.00 / pcspcsenter quantity-
Installation of glass screen on shower traypc€95.00 / pcpcenter quantity-
Installation of walk-in shower glass screen with U-channelpcpc-
Installation of glass bath screenpcpc-
Vanity unit installationpcs€60.00 / pcspcsenter quantity-
Fixing mirror with adhesivepcs€50.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What Geberit frame installation for a wall-hung WC involves

A concealed frame carries the wall-hung pan and houses the cistern. The whole unit sits inside the wall, so only the pan and the flush plate are visible. The floor under the pan stays clear, which makes cleaning easier and helps the bathroom feel larger.

The job covers setting the frame, fixing it firmly, connecting the water supply and waste, and preparing it for boxing-in. It is usually done during a bathroom or cloakroom refurbishment, when replacing an old close-coupled WC with a wall-hung one, or when changing a flat's layout. This page also covers the option where the tradesperson boxes in the frame with blockwork straight after connection and prepares it for tiling. For other jobs in this trade, see the overview of plumbing work.

Geberit Duofix or Kombifix: the difference

Both systems carry a wall-hung WC without difficulty when fixed correctly. They differ mainly in the type of wall they suit and how they are covered.

  • Duofix is a self-supporting steel frame. It is fixed to the floor and the wall and suits a false wall (stud wall) or a plasterboard partition. Installation is quicker and no blockwork is needed.
  • Kombifix is a frame designed to be built into a masonry wall or a masonry recess. It is fixed to solid masonry and then blocked in or built into the structure. The manufacturer offers a sound insulation set that separates the frame from the masonry.

The frame installation + blockwork boxing-in option includes building a masonry false wall around the frame as well as fitting the frame itself, usually with aerated concrete blocks or brick. Aerated blocks cut easily and the work goes faster. However, for a shelf, toilet roll holder or heavier accessory, fixings designed for aerated concrete are needed, as standard wall plugs hold poorly. Brick takes more effort to cut, but fixings hold more securely and it copes better with heavier tiles.

What to decide before fitting a wall-hung WC

Once tiled, the frame cannot be moved or raised without breaking out the wall. That is why most decisions are made before the plumber arrives.

  • Frame height: standard frames are roughly 112 cm high. Lower versions of around 80 cm exist for lofts or positions under a window.
  • Pan and flush plate: before buying, check that the chosen pan and flush plate suit the frame and read the manufacturer's installation instructions. Flush plates vary by cistern type and not every plate fits every frame.
  • Pan height: the top of the pan is usually around 40 to 45 cm above the finished floor. Taller people or older members of the household may prefer it higher. For accessible bathrooms, the height is set individually.
  • Floor tile thickness: the plumber needs to know how thick the finished floor will be, including adhesive and tiles. The frame legs are set from this level.
  • Full-height boxing or half-height with a shelf: the boxing-in can run up to the ceiling, or stop at frame height to leave a handy shelf on top. Plan the depth in advance, as it takes space from the room. The manufacturer states the exact frame depth, to which the blockwork or boards and tiles are added.
  • Method of covering: decide whether the frame will be boxed in with blockwork or clad in plasterboard. This affects the boxing depth, the sequence of work and the price item. The differences are explained in the questions at the end.
  • Extras: a shower toilet or heated seat needs both a water supply and a socket. The electrical part must be done only by a qualified electrician, not by the plumber or tiler. A new circuit or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.

In a block of flats, any work on the shared soil stack should be agreed in advance with the managing agent or management company. If the layout changes or load-bearing structures are affected, you may need building regulations approval from building control. In Scotland, structural alterations need a building warrant from the council before work starts. Do not assume that no approval is ever needed.

How a Duofix or Kombifix frame is installed

  1. Setting out: the plumber marks the WC position, meaning the distance from side walls, the waste position and the height of the finished floor including tiles.
  2. Positioning and levelling: the frame is stood in place, levelled with a spirit level and the adjustable legs set so the pan ends up at the agreed height above the finished floor.
  3. Fixing: the frame is fixed to the floor and to a structural wall. Suitable wall plugs or chemical anchors are used in masonry; in a stud wall the frame is fixed to the supporting studs.
  4. Waste: the pan connector bend is joined to the drainage. A WC usually connects to waste pipe of 90 to 110 mm diameter. The pipe must have a continuous fall in line with the applicable standards and the manufacturer's instructions, in practice roughly 1 to 2 %, that is 1 to 2 cm per metre of run. If the waste does not line up exactly, an offset connector helps.
  5. Water: the supply is flushed through so no debris gets into the valve, and the cistern is connected via an isolating valve.
  6. Testing: a pressure test is carried out with a gauge. The pipework is pressurised to roughly 1.5 times normal working pressure and checked for any pressure drop during the test. The exact pressure and duration are set by the pipework manufacturer's instructions. The flush is then tested. Only when pressure holds, nothing drips and water drains freely can the frame be covered.
  7. Boxing-in: the frame is blocked in or clad in moisture-resistant plasterboard. For wall-hung WCs, manufacturers usually recommend two layers of board. With blockwork, the frame should not be built rigidly into the blocks. An insulating strip or sound insulation set goes between the frame, pipes and masonry, otherwise flushing noise travels into the wall and to the neighbours. Finally, openings are cut for the flush plate and the pan connections.
  8. Preparing for tiling: masonry is primed; plasterboard joints are filled and taped with reinforcing tape.
  9. Fitting the pan: after tiling, the pan is fitted over an insulating pad that dampens noise and protects the tiles, and the flush plate is installed. The nuts are tightened evenly so the ceramic does not crack.

There is usually a break between boxing-in and fitting the pan for tiling and curing. Until then, the connection sockets are covered with protective caps, which must not be thrown away or damaged.

What affects the price of Geberit installation

The guide labour price is €130.00 per piece. It applies to the blockwork option where water and waste are already at the frame position and the boxing is of standard height. Plasterboard cladding is a different method with its own price item, so do not use this price for it. The final cost depends mainly on:

  • Waste position: if the waste is exactly where it should be, the work is routine. When replacing a floor-standing WC in an older flat, the waste is often low or elsewhere and has to be extended, moved or run in a chase cut into the floor. This adds separate plumbing work, and a more complex relocation can take several times as long as fitting the frame itself.
  • Condition of pipework: old cast iron or corroded pipe is often replaced over a longer section when connecting. Work on the soil stack also means coordinating with the managing agent.
  • New water supply: if the supply does not reach the frame, it has to be run and made good, for example after chasing channels for water pipes in concrete. Treat this as a separate item.
  • Boxing height: full height to the ceiling takes more work than half height with a shelf, and the difference is noticeable.
  • Boxing material: aerated blocks cut quickly, brick more slowly. Brick adds slightly to the time.
  • Substrate: an uneven floor or a weak, crumbly wall means extra levelling and fixing, such as chemical anchors instead of standard plugs.
  • Non-standard layout: a low frame under a window, a corner installation or a shared false wall for WC and bidet takes more work than a single frame on a straight wall. Some plumbing work, such as certain bidets, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify.
  • Removing the old WC: taking out a floor-standing WC and old cistern and removing the rubble are often charged separately.

When comparing quotes, ask whether the price includes the frame, fixings, sound insulation and blocks, or labour only, and whether it covers fitting the pan and flush plate after tiling.

What makes the job easier and what slows it down

A plumber works faster when not waiting for decisions or materials. It helps to have ready:

  • the frame, pan and flush plate bought in advance and checked for compatibility,
  • the floor tiles chosen, so the exact finished floor thickness is known,
  • a cleared bathroom and free access to the main stopcock,
  • a water shutdown agreed with the managing agent if shared pipework is affected,
  • an alternative toilet during the work, for example a second bathroom, as the household will be without a WC for several days,
  • space for rubble and arranged waste removal. Before you hand over the rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.

The job takes longer when the pan or flush plate is changed after the frame is boxed in, when no tiler is booked and the boxing sits waiting, or when electrical changes are only discovered during installation. The process runs most smoothly when the plumber and tiler know about each other and coordinate dates. If a concealed shower valve (iBox) is also planned in the same bathroom, it makes sense to fit both before tiling.

Wall-hung WC installation mistakes that are hard to fix after tiling

Once finished, the frame is hidden in the wall, so any mistake means breaking out tiles. These come up most often in practice:

  • Weak fixing: the pan moves over time and the grout or tiles crack. This usually shows only after months of use.
  • Wrong height: if the tile thickness is forgotten, the pan ends up too low or too high and is uncomfortable to sit on.
  • Insufficient fall on the waste: water drains slowly, the pan blocks and the waste smells.
  • Skipped or guessed pressure test: a small leak only shows later as a damp wall, flaking grout or a stain on the ceiling of the flat below.
  • Frame blocked in without sound insulation: flushing and running water can be heard in adjoining rooms and the neighbouring flat.
  • A single thin layer of plasterboard: the area under the pan can flex and the tiles around the pan crack.
  • Non-genuine seals and fitting kits: they lose elasticity over time and start to leak.
  • Flush plate opening cut in the wrong place: the plate then does not sit properly in the tiling, or the valves cannot be reached for servicing.
  • Pan tightened without a pad or unevenly: the ceramic can crack, the pan knocks and transmits noise into the wall.

Checks at handover

The most important check takes place before the frame is covered. If possible, be present for the test.

  • the frame is solid and does not rock when pushed,
  • the pan height matches what was agreed and the pan is level,
  • a pressure test with a gauge was carried out before boxing-in and the pressure did not drop,
  • a flush test was carried out,
  • joints on water and waste are dry,
  • there is an insulating strip or sound insulation set between the frame and the blockwork,
  • the cistern fills smoothly and the valve shuts off completely when full,
  • both full and reduced flush work and water drains without slowing,
  • the opening behind the flush plate is accessible for servicing,
  • the boxing is straight, free of cracks and ready for tiling,
  • the pan sits on an insulating pad and the joint at the tiles is sealed with sanitary silicone,
  • you have received the instructions and the frame model details for future spare parts.

DIY guide: fitting a Geberit frame in a prepared position

With building experience, and with water and waste already in exactly the right place, fitting the frame yourself is manageable. If the waste needs moving, pipework changing or the soil stack altering, call a plumber. Always follow the instructions for the specific frame. More on related options is in the guide to installing and recessing concealed cisterns and frames.

  1. Turn off the main stopcock and check that nothing runs from the outlet.
  2. Mark the WC centre line and the finished floor height including tiles.
  3. Stand the frame in place, set the legs to the required height and lock them.
  4. Level the frame with a spirit level in all directions.
  5. Drill holes and fix the frame to the floor and wall with fixings suitable for the substrate.
  6. Push the frame from different sides to confirm it does not move.
  7. Connect the pan connector bend to the drainage and check with a spirit level that the waste falls continuously towards the stack.
  8. Flush the supply through and connect the cistern via an isolating valve.
  9. Turn the water on, fill the cistern and flush several times through the test opening.
  10. Carry out a pressure test with a gauge following the pipework manufacturer's instructions and watch for any drop. Without a gauge, have a plumber do the test, as simply looking at joints will not reveal a small leak.
  11. After the test, check all joints with a dry paper towel.
  12. Only then cover or block in the frame, with an insulating strip between the frame and masonry.

Frequently asked questions

Roughly €130.00 per piece for installation with blockwork boxing-in, where water and waste are already at the frame position. The price rises if the waste must be moved, new pipework run, the boxing taken to the ceiling or a weak substrate reinforced. The plasterboard option has its own price item.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.