Price the work from the price list
Enter quantities and the price recalculates instantly. You can adjust these rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
| Plumbing works | ||||
| Installation of concealed WC frame | pcs | 92,20 € | - | |
| Installation of wall-hung WC duct frame | pcs | - | ||
| Install and fit access panels | pcs | 24,06 € | - | |
| Install and brick-up bath | pcs | 120,28 € | - | |
| Install ceramic basin | pcs | 40,10 € | - | |
| Shower tray installation | pcs | 150,35 € | - | |
| Install shower enclosure glass (screen) | pcs | - | ||
| Install deck-mounted tap | pcs | 25,06 € | - | |
| Install wall-mounted bath/shower mixer | pcs | 30,07 € | - | |
| Install concealed shower valve body (iBox) | pcs | - | ||
| Install concealed mixer tap | pcs | - | ||
| Cold and hot water outlet point | pcs | 35,08 € | - | |
| Internal waste and drainage outlet point | pcs | 25,06 € | - | |
| Install washing machine/dishwasher valve and trap | pcs | - | ||
| Hang and connect electric water heater up to 120 l | pcs | 90,20 € | - | |
| Install whole-house water filter | pcs | 45,10 € | - | |
| Hot water circulation pipework | lm | - | ||
| Pressure test internal water supply pipework | hr | - | ||
| Chase cutting for plumbing (concrete) | lm | 27,06 € | - | |
| Make good walls after plumbing | lm | 6,50 € | - | |
| Install and chase in concealed valve body | pcs | 82,20 € | - | |
| Install shower channel + screed in | pcs | - | ||
| Install stopcocks / isolation valves | pcs | 5,80 € | - | |
| Install valve for dryer/washer + waste | pcs | 37,10 € | - | |
| Connect pipework to cast iron waste stack | pcs | - | ||
Duofix, Kombifix and masonry boxing: what is the difference
Both systems carry a wall-hung WC without trouble, as long as they are anchored properly. The main differences are the type of wall they belong in and how they are covered.
- Duofix is a self-supporting steel frame. It is fixed to the floor and to the wall and suits a false wall (a service wall built in front of the main wall) or a plasterboard partition. Fitting is quicker and needs no bricklaying.
- Kombifix is a frame designed to be built into a masonry wall or a masonry recess. It is fixed to solid masonry and then bricked in or built into the structure.
The option frame installation plus masonry boxing includes the frame and a short wall built around it, usually from aerated concrete blocks or bricks. Aerated concrete is easier to cut, so the work goes faster. Brick takes more effort to shape but is harder. The boxing can go right up to the ceiling, or stop at frame height and leave a handy shelf on top. Plan its thickness in advance, because it takes up floor space in the room.
Frames also differ in height. Standard frames are roughly 112 cm tall. For loft rooms or under a window there are lower versions of around 80 cm. Before you buy, check that the pan and flush plate you have chosen fit the frame, and read the manufacturer's installation instructions.
How the installation works, step by step
An experienced plumber usually works in roughly this order:
- Measures the WC position: distance from the side walls, the position of the waste pipe and the height of the finished floor, including tiles.
- Sets the frame in place, levels it and adjusts the extending feet so that the top edge of the pan usually ends up about 40 to 45 cm above the finished floor. For an accessible bathroom, the height is agreed individually.
- Anchors the frame to the floor and to a solid wall. In masonry this means suitable wall plugs or chemical anchors; in a plasterboard wall the frame is fixed to the supporting studs.
- Connects the waste. The waste pipe needs a steady fall in line with EN standards and the manufacturer's instructions. If the outlet does not line up exactly, an offset connector helps.
- Flushes out the water supply pipe and connects the cistern through an isolating valve.
- Carries out a pressure test and a flush test. Only when nothing drips and the water drains away freely is the frame covered.
- Boxes the frame in with masonry or covers it with moisture-resistant plasterboard. For wall-hung WCs, manufacturers usually recommend two layers of board. Cuts openings for the flush plate and the pan connections.
- Prepares the surface for tiling: primer on masonry, or jointing tape and filler on plasterboard joints.
After tiling, the pan is mounted on an isolation pad, which reduces noise and protects the tiles, and the flush plate goes on. The nuts are tightened evenly so the ceramic does not crack.
What makes the job easier or harder
How much work is involved, and therefore the final cost, depends on what the tradesperson finds on site.
- It is easier in a new build or a full renovation, when the water and waste are already in exactly the right place for the frame and the floor is level.
- It is harder when replacing a floor-standing toilet in an older flat. The waste outlet is often too low or in a different place, the pipework is old, and sometimes walls or floors need chasing.
- Moving the waste pipe or running new water pipes adds extra plumbing work.
- Masonry boxing takes more work than plasterboard, and full-height boxing takes more than half-height.
- An uneven floor or a weak wall means extra levelling and anchoring.
In a block of flats, any work on the shared soil stack must be agreed in advance with the building management or owners' association. If you are changing the layout or touching load-bearing parts of the building, check with your local building authority what the local building regulations require. Do not assume that a simple notification is always enough.
Mistakes that are hard to fix once the tiles are on
Once the work is finished, the frame is hidden in the wall. Any mistake means breaking out the tiles. In practice the same ones come up again and again:
- Weak anchoring. Over time the pan moves and a joint or tile cracks.
- Wrong height. If nobody allows for the thickness of the floor tiles, the pan ends up too low or too high.
- Not enough fall on the waste. Water drains slowly and the drain smells.
- Skipped leak test. A small leak only shows itself later as a damp wall.
- One thin layer of plasterboard. The area under the pan can flex.
- Non-original seals and fixing kits. They lose their elasticity over time and start to leak.
DIY guide: fitting the frame where supply and waste are ready
If you have some building experience and the water supply and waste are already in exactly the right place for the frame, you can fit it yourself. If the waste needs moving or the pipework needs changing, call a plumber. Always follow the instructions for your specific frame.
- Turn off the main water supply and check that nothing runs from the outlet.
- Mark the centre line of the WC and the finished floor height, including tiles.
- Stand the frame in place, set the feet to the required height and lock them.
- Level the frame in every direction with a spirit level.
- Drill the holes and anchor the frame to the floor and wall with fixings suited to the surface.
- Push the frame from different sides and make sure it does not move.
- Connect the waste bend to the drain and check the fall.
- Flush out the supply pipe and connect the cistern through the isolating valve.
- Turn the water on, let the cistern fill and flush several times through the test opening.
- Leave the water under pressure for at least a few hours and check every joint with a dry paper towel.
- Only then cover or box in the frame.
Checklist for handover
- The frame is solid and does not rock when you push it
- The pan height matches what was agreed and the pan is level
- A pressure test and a flush test were done before the frame was covered
- All joints on the supply and waste are dry
- The cistern fills smoothly and the valve closes fully once it is full
- Both full and half flush work and the water drains away without slowing
- The opening behind the flush plate is accessible for servicing
- The boxing is straight, free of cracks and ready for tiling
- The pan sits on an isolation pad and the joint with the tiles is sealed with sanitary silicone
- You have received the instructions and the frame model details for future spare parts
Frequently asked questions
Yes, if the position of the waste and the space for the boxing allow it. In older flats, though, the waste or water supply often needs adjusting, and any work on the shared soil stack needs approval from the building management.
Fitting and connecting the frame where everything is ready usually takes a few hours. With masonry boxing, drying time and tiling, allow several days.
Usually not. The fill valve and flush valve are replaced through the opening behind the flush plate.
Masonry boxing is sturdier and suits bathrooms with solid walls. Plasterboard is quicker and suits lightweight partitions, but it must be moisture-resistant and properly reinforced.
Related work
Price the whole project, not just one job
In the building work price list you pick items from every trade, and NUMIQ turns them into a client-ready quote.