Price list 2026 · Europe

Walk-in shower screen installation in a U channel

A walk-in screen in a U channel means fixing the channel to the floor or wall and setting fixed toughened glass into it. Guide price: €190.00 per piece, mainly depending on channel type, screen shape and tiles.

Updated 11/2026·11 min read·13 price list items
Standard labour price
€190.00/ pc
Indicative range
€152.00 - €247.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Walk-in shower screen installation in a U channel

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling13 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Sanitaryware installation cost

Installation of walk-in shower glass screen with U-channelpc€190.00 / pcpcenter quantity-
Bath installation (tiling work)pcs€61.00 / pcspcsenter quantity-
Bath boxing-in and waste connectionpcspcs-
Shower tray step construction and slopingpcspcs-
WC concealed cistern frame installation + boxing inpcspcs-
Close coupled WC installationpcs€45.00 / pcspcsenter quantity-
Bath / shower mixer tap installationpcs€55.00 / pcspcsenter quantity-
Basin installationpcs€35.00 / pcspcsenter quantity-
Basin mixer tap installationpcs€25.00 / pcspcsenter quantity-
Installation of glass screen on shower traypc€95.00 / pcpcenter quantity-
Installation of glass bath screenpcpc-
Vanity unit installationpcs€60.00 / pcspcsenter quantity-
Fixing mirror with adhesivepcs€50.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What a walk-in shower screen is

A walk-in shower has no door. It is most often built without a tray, as a wet room style floor: the shower area is laid to a fall directly in the tiles and a fixed glass panel separates it from the rest of the bathroom. The same glass can also stand on a low-profile shower tray, in which case the tray handles the fall and the drainage. The glass usually sits in an aluminium or stainless steel U channel, firmly fixed to the floor, the wall or both. The result looks clean, is easy to keep and lets you step in without climbing over an edge.

A U channel is a narrow slot that takes the edge of the glass. How the glass is held depends on the manufacturer's system. Most often it is secured with wedge gaskets inserted on both sides, while some floor systems use clamps or a special fixing compound. With a wedge system, damaged glass can later be removed without taking the channel out.

This job covers only fitting the channel and the glass. The floor laid to falls, the waterproofing (tanking), the drain and the tiling must already be finished.

What to decide before tiling

With a walk-in shower, many decisions are made before the glazier arrives. If any of these points is neglected, the screen will not fix the problem.

  • Fall: the floor must carry water to the drain, not to the glass. Around 1.5 to 2 per cent is commonly quoted. The fall and any upstand are set out as part of constructing the fall for a shower kerb.
  • Waterproofing: it must cover the whole shower area and run up the walls. The channel is fixed through it, so every hole must be sealed.
  • Services in the floor: no underfloor heating pipe, water pipe or cable may run under a floor channel. It is worth photographing their positions before the screed is laid.
  • Wall strength: the wall at the channel must carry both the fixings and the stabiliser bar. In a plasterboard stud wall, timber noggins or metal backing should be fitted at that point in advance. Cavity fixings alone are risky with heavy glass and a stabiliser bar, as they can gradually work loose.
  • Glass length and entry width: these determine how much water splashes out. A panel covering most of the shower length with an opening of about 50 to 60 cm is a common choice. With a short panel, expect a wet floor outside the shower.
  • Channel type: floor channel, wall channel with stabiliser bar, or a combination. This decides where drilling will happen and what must be prepared behind the tiles.
  • Kit or made-to-measure glass: a standard size is available straight away, while made-to-measure glass is only produced after the finished surfaces have been measured.

Glass and channel for a walk-in shower

Walk-in screens use toughened safety glass, usually 8 or 10 mm thick. Thinner frameless glass would vibrate when touched. Fixed glass is heavy, roughly 20 to 25 kg per square metre, so two people must handle it during fitting.

A floor U channel holds the glass from below. It is the most rigid option, and the glass can then stand freely in the room, fixed to the wall on one side only.

A wall U channel holds the glass at the side. The bottom edge stands on the floor on setting blocks or a seal, or just above it, and the glass is usually braced with a stabiliser bar. The floor often carries much of the weight, while the wall and bar mainly take side loads and stop the panel leaning. The channel must therefore be perfectly plumb and securely fixed.

A combination of wall and floor channel is used for longer and taller panels, where the glass needs holding on two sides.

Channels come in anodised aluminium, stainless steel or black or brushed gold finishes. Check which glass thickness the channel is designed for, and buy the glass and channel from the same manufacturer. The gaskets, wedges and stabiliser bar will then match.

Walk-in screen installation step by step

The screen is fitted only once the wall and floor tiles are finished. Before that, the floor laid to falls, the waterproofing and the drain must be complete, most often a linear drain at the wall or a point drain.

  1. Survey: the channel position is set out and the floor under the channel is checked for level and the wall for plumb.
  2. Ordering the glass: if a standard kit size is not used, the glass is ordered to measurements taken on the finished surfaces.
  3. Marking the holes: fixing holes are marked on the floor or wall, and the drilling points are checked for pipes and cables.
  4. Drilling: drilling is done without hammer action so that tiles do not crack. A tile drill bit is enough for softer wall tiles, while hard porcelain needs a diamond core bit with water cooling. The holes are filled with silicone so the waterproofing stays sealed.
  5. Fitting the channel: the U channel is screwed down and carefully aligned with a spirit level. A wall channel must be plumb from the front and the side.
  6. Inserting the glass: using suction lifters, the glass is set into the channel on setting blocks and secured according to the manufacturer's system, usually with wedge gaskets.
  7. Bracing: where the manufacturer requires it, a stabiliser bar is fixed to the wall or ceiling and tightened so it does not pull the glass sideways.
  8. Sealing: the joint between the channel and the floor and wall is sealed on the outside with sanitary silicone.
  9. Curing: the silicone is left to cure as stated on the cartridge, usually at least 24 hours, before the shower is used.

The glass must not touch metal inside the channel. The gaskets hold it and also absorb knocks. Silicone is only an external seal, not an adhesive.

Walk-in screen installation cost and what affects it

The guide labour price is €190.00 per piece, meaning one fitted panel with its channel. For long or angled arrangements, some installers price by channel length, because it determines the number of holes, the alignment work and the length of the silicone joint. When comparing quotes, check exactly what is included.

  • Channel type: the simplest job is a short panel at the wall with a wall channel and stabiliser bar. A long floor channel means many holes in the tiles and precise levelling, so it takes considerably more work.
  • Screen shape: an L-shaped screen or two panels joined at an angle need more accurate measuring, more fixings and sealing in the corner. Such an arrangement costs noticeably more than a single straight panel.
  • Flatness of the substrate: walls out of plumb or a floor that is not level under the channel mean packing and longer alignment.
  • Tiles: large-format or hard porcelain tiles are drilled slowly with a diamond core bit, and the risk of damaging a tile rises.
  • Underfloor heating: drilling above it is only allowed at verified points, which slows the work, especially when the exact pipe layout is unknown.
  • Glass height and weight: tall, thick glass is heavier, needs two people and often a ceiling stabiliser.
  • Made-to-measure glass: the job takes two visits, survey and fitting, which extends the timescale and usually the price.
  • Fixing to plasterboard without backing: the wall has to be opened up and reinforced, which is extra work.

The glass and channel are usually charged separately from fitting. Also check whether the quote includes the survey, delivery of the glass, the stabiliser bar and the silicone seal.

How to prepare the bathroom for fitting

Fitting goes faster when everything is ready on site.

  • wall and floor tiling is finished, grout cured and surfaces clean, with no adhesive or mortar residue,
  • photos or a plan of pipes and cables in the walls and floor are to hand,
  • the glass and channel are on site, the packaging checked from the outside and the glass stored upright on a soft base, unpacked only at fitting,
  • the manufacturer's fitting instructions are available,
  • the bathroom is clear and the route to it can be used with heavy glass, with hallway and doors free,
  • there is power for the drill and lighting,
  • in a block of flats, it is clear whether the lift can be used and where to park when unloading the glass.

Fitting takes longer if other trades are still working in the bathroom, for example finishing the grouting, or if the delivered glass turns out not to match the channel. If the room also gets a new bath, it helps when bath installation and waste connection and the bath panel enclosure are finished before the screen is fitted.

Common mistakes and how they show up later

Fall towards the glass. If water runs to the channel instead of the drain, it is pushed under the glass and out into the bathroom. The screen will not solve this, and the fix means lifting and relaying the shower floor tiles. The fall is therefore checked before tiling.

Drilling through waterproofing and underfloor heating. Holes without silicone let water under the tiles, and damp often appears only months later, for example as stains on the next wall or in the flat below. A drilled underfloor heating pipe means breaking up the floor.

Glass stuck into the channel with silicone. Silicone does not replace gaskets or clamps. The glass is not secured, the silicone gives way over time and the glass starts to rock.

Missing or badly fitted bracing. A tall panel held only at the side flexes when leaned on. If the wall channel is not plumb or is fixed into a weak wall, the glass gradually leans and the bar starts pulling it sideways.

Fixing to plasterboard without backing. Cavity fixings work loose under repeated loading. The channel starts to move, the silicone cracks and water gets behind the tiles.

Glass that is too thin. 6 mm glass does not belong in a frameless walk-in channel. It vibrates and the channel cannot hold it firmly enough.

Measuring before tiling. Adhesive and tiles change both the height and width of the opening. Made-to-measure glass sized on bare walls will then not fit.

Hammer drilling or the wrong bit. The tile around the hole cracks, sometimes only once the screw is tightened. A damaged tile is then difficult to replace without removing the channel.

Glass set down on its edge on the tiles. Toughened glass is most vulnerable at its edges and corners. A knock against a hard floor can damage it so that it shatters later.

How to check the finished screen at handover

At handover, inspect the screen and, once the silicone has cured, test the shower. Check that:

  • the glass is free of scratches and chipped edges,
  • the glass stands plumb and does not vibrate or rock when pushed,
  • the channel is straight, firmly fixed and without a gap at the wall,
  • the gaskets in the channel are intact and do not protrude above it,
  • the stabiliser bar is firm and does not pull the glass sideways,
  • water runs to the drain during showering and does not escape under the glass,
  • silicone joints are continuous with no gaps,
  • tiles around the holes are not cracked or chipped,
  • you have received the manufacturer's fitting instructions and care guidance.

Looking after a walk-in screen

After showering, a squeegee over the glass is enough, with the channel cleaned now and then, as limescale can build up in it. Clean the drain regularly, because a blocked drain sends water back across the floor to the glass. Replace damaged or discoloured silicone promptly so that water does not get under the channel.

DIY guide: walk-in glass from a kit

A competent DIYer can manage a kit walk-in panel with a wall channel. Long panels in a floor channel, made-to-measure glass, fixing to plasterboard without backing and work above underfloor heating are better left to a professional, ideally coordinated with the tiling work in the bathroom. The procedure is the same as the professional installation above, and the manufacturer's instructions always apply. In addition, keep the following in mind:

  1. Arrange a helper and two suction lifters. Never lift or fit the glass alone.
  2. Find out what the tiles are made of beforehand and buy the bit as described above. If a spare tile is left over, test the drilling on it first.
  3. Cover the drilling point with masking tape so the bit does not skid on the glaze.
  4. Tighten the channel screws carefully, not as hard as possible, so the tiles under the channel do not crack.
  5. After securing the glass, check plumb once more and only then fit the stabiliser bar.
  6. Apply silicone only to dry, degreased surfaces.

Frequently asked questions

The guide fitting price is €190.00 per piece. The final figure depends mainly on the channel type, the screen shape, the hardness of the tiles, the flatness of the substrate and underfloor heating. The glass and channel are usually charged separately.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.