Price list 2026 · Europe

Fitting a Bath / Shower Mixer Tap with Shower Head Holder

Fitting a bath or shower mixer to the outlets, with seals, shower head holder and a test, costs around €55.00 per piece. A standard swap takes up to two hours. The mixer type and outlet condition affect the price most.

Updated 09/2026·12 min read·13 price list items
Standard labour price
€55.00/ pcs
Indicative range
€44.00 - €71.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Fitting a Bath / Shower Mixer Tap with Shower Head Holder

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling13 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Sanitaryware installation cost

Bath / shower mixer tap installationpcs€55.00 / pcspcsenter quantity-
Bath installation (tiling work)pcs€61.00 / pcspcsenter quantity-
Bath boxing-in and waste connectionpcspcs-
Shower tray step construction and slopingpcspcs-
WC concealed cistern frame installation + boxing inpcspcs-
Close coupled WC installationpcs€45.00 / pcspcsenter quantity-
Basin installationpcs€35.00 / pcspcsenter quantity-
Basin mixer tap installationpcs€25.00 / pcspcsenter quantity-
Installation of glass screen on shower traypc€95.00 / pcpcenter quantity-
Installation of walk-in shower glass screen with U-channelpcpc-
Installation of glass bath screenpcpc-
Vanity unit installationpcs€60.00 / pcspcsenter quantity-
Fixing mirror with adhesivepcs€50.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What the work includes and when it is needed

The mixer tap is fitted to the prepared hot and cold outlets, the joints are sealed and the tap is tested. The job also covers connecting the shower hose and fixing the shower head holder or riser rail to the wall. It is usually done during a bathroom refit once the tiling is finished, when replacing an old dripping tap, or when switching to a more convenient type such as a thermostatic mixer. The tap goes on as one of the final stages after the tiling work is complete.

Bath mixer and shower mixer: the difference

Both types blend hot and cold water, usually through a ceramic cartridge operated by a single lever. They differ mainly in the outlet and the fitting height.

  • Bath shower mixer has a spout that fills the bath and a diverter between bath and shower. It is fitted low on the wall, usually about 10 to 20 cm above the top edge of the bath, so the water runs into the bath and does not splash around it.
  • Shower mixer has no spout. The water goes only to the hose and shower head. It is fitted higher, typically around 110 to 120 cm above the shower floor, so the lever can be reached without bending. If the shower floor, kerb and fall are still to be built, the shower kerb and floor fall should be taken into account when setting this height.
  • Thermostatic mixer (bath or shower) holds the set temperature even when someone else in the home turns on a tap. It is particularly suitable for households with small children or elderly people.

The height of the outlets is set during first fix plumbing, before tiling. If the outlets are already in the wall, the mixer has to be fitted to them. Moving them means alterations to the pipework and the tiling.

What to clarify before buying the mixer

Most problems during fitting arise because the mixer bought does not match what is in the wall. Before buying, it is worth checking a few points:

  • Mixer type to suit the outlets: if there are two outlets in the wall, a wall-mounted exposed mixer is the right choice. A deck-mounted mixer on the bath rim needs tap holes in the bath or in the tiled surround, with isolating valves beneath. A concealed mixer can only sensibly be fitted when the wall is open, before tiling.
  • Outlet centres: wall-mounted mixers usually work with 150 mm centres. Measure from the centre of one outlet to the centre of the other. Small deviations can be taken up by the offset connectors (S-unions), larger ones cannot.
  • Spout length on a bath: the spout should reach far enough over the bath that water does not land on the rim. For a corner bath or an unusual tap position, measure the length.
  • Shower head holder or riser rail: a fixed wall bracket is simpler, a sliding riser rail lets each member of the household adjust the shower height. Decide where it will go before fitting, so that no holes are drilled where the pipes run.
  • Box contents: check that the box includes the offset connectors, cover plates, washers, hose, shower head and holder with wall plugs. Cheaper sets sometimes lack some of these or include low-quality parts.
  • Thermostatic or not: a thermostatic mixer is more comfortable and safer, but more sensitive to debris in the pipes and to correct hot and cold connection. Check the manufacturer's minimum pressure requirements, especially on low-pressure gravity-fed systems.

How a wall-mounted mixer is fitted

A wall-mounted exposed mixer is common wherever two supply outlets come out of the tiled wall. It is fitted to these two outlets.

  1. Turn off the water, open the old tap and release the residual pressure.
  2. When replacing, remove the old mixer and clean old sealant and limescale from the outlets.
  3. Briefly flush the pipes, especially after a refit, to clear sand and debris.
  4. Screw the offset connectors into the outlets. Their threads are sealed with PTFE tape or hemp with jointing paste.
  5. Turn the offset connectors so that their centres match the mixer exactly, they sit level, and the cover plates sit flush against the tiles.
  6. Insert flat washers into the mixer nuts and offer the mixer up dry first to check that everything lines up.
  7. Tighten the nuts with a smooth-jawed spanner or through a cloth so that the chrome is not damaged.
  8. Turn the water back on, check the joints and test hot, cold and the diverter.
  9. Mark the position for the shower head holder or riser rail, confirm that no pipes run there and drill holes in the tiles.
  10. Insert wall plugs, fix the holder or rail, connect the hose with washers at both the mixer and the shower head, and check for leaks at full flow.

Why two kinds of seal? The offset connectors are sealed on the thread, while the mixer seals on the flat washer under the nut. PTFE tape does not belong on the mixer nuts.

Shower head holder and riser rail: points to watch

The holder seems like a minor item, but this is where tiles are most often damaged. Pipes to the mixer usually run vertically or horizontally from the outlets in the wall, so do not drill directly above or below the mixer without checking where the pipes go. A photo of the wall taken before tiling, if available, or a pipe and cable detector helps.

  • Drill tiles with the hammer action off, using a tile drill bit, and put masking tape over the spot so the bit does not wander.
  • With ordinary tiles it is possible to drill through the tile, but not right at the edge, where it may crack. With large-format or very hard tiles, it is often better to drill into the grout line if the layout allows, because grout is easier to repair than a tile.
  • Wall plugs must suit the substrate. Plasterboard behind the tiles needs different fixings from brick or concrete.
  • Holes can be lightly sealed with silicone before the screws go in, so that water does not get into the wall.
  • The riser rail should be vertical, checked with a spirit level, and the holder should hold the shower head without slipping once adjusted.

Deck-mounted and concealed mixers: how the work differs

Deck-mounted mixer on the bath rim

It is fitted into tap holes in the bath rim or in a tiled surround around the bath. Underneath, it is connected with flexible hoses to isolating valves. The work takes longer because it is done in a cramped space, and access to the valves must be left, for example through an access panel in the bath panel. Freestanding baths have the mixer on a separate floor-standing column with supplies from the floor, which must be prepared in advance.

Concealed mixer

The mixer body is built into the wall before tiling. Its depth must be set according to the manufacturer so that after tiling it sits exactly flush with the tiles. Before the wall is closed, the pipework must be pressure tested. After tiling, only the visible parts are fitted: the cover plate, lever and shower head or spout. This requires cooperation between the plumber and the tiler. If the body is set too deep or too shallow, the cover plate will not sit properly, and this usually cannot be fixed without disturbing the tiling.

What affects the price

The guide price for the labour is €55.00 per piece. It applies to a standard situation, meaning a wall-mounted mixer on working outlets at the correct centres. The final price rises mainly in these circumstances:

  • Mixer type: replacing a wall-mounted mixer with a similar one is simplest. A thermostatic mixer needs more precise connection and setting. A deck-mounted mixer connected under the bath rim and fitting the visible parts of a concealed system are considerably more labour-intensive, often several times more than a standard swap.
  • Condition of the outlets: corroded or furred-up outlets, damaged threads, centres that the offset connectors cannot correct, or outlets set too deep in or standing too far out of the tiles. The work then takes longer for cleaning, replacing the connectors or extending the outlets.
  • Removing the old mixer: seized nuts and connectors that will not undo add time and sometimes materials.
  • Riser rail or a more complex shower kit: drilling several holes in tiles, especially hard porcelain or large-format tiles, is slower than fitting a simple holder.
  • Alterations to pipework or tiling: if the outlets need moving or tiles need cutting out, this is no longer just fitting a mixer and the price is based on the additional work.
  • Materials: offset connectors, washers, hoses or isolating valves, if not in the box, are usually charged on top of the labour.

What makes the job easier and what slows it down

  • The mixer is bought in advance, unpacked and checked for all parts. A missing connector or washer means another trip to the merchant.
  • The location of the stopcock is known and it can be turned off. A stiff stopcock that does not shut off fully delays the work.
  • In a block of flats it is sometimes not possible to shut off the water to one flat only. In that case the supply has to be isolated for more than one flat, which needs arranging in advance with the managing agent or building management.
  • The bath and surrounding area are cleared of toiletries and bath mats, and there is free access to the outlets.
  • For a deck-mounted mixer, the access panel in the bath panel can be opened and is not sealed shut or blocked by furniture.
  • The position of the shower head holder is decided, and a photo of the pipework before tiling is to hand if one exists.
  • Tiling and grouting are finished and dry, so that the cover plates can be fitted against the final surface.

Changing the pipework or the position of the outlets is a job for a plumber. For a larger bathroom refit, note that some plumbing work, such as certain bidets, pumps or large baths, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify. If the refit includes a new circuit or work on bathroom circuits, this is notifiable under Part P in England and Wales, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. If the bath itself is being replaced, it is usually handled together with bath installation and waste connection.

Typical mistakes and how they show up later

  • Overtightening the nuts. The flat washer gets squeezed out and the nut may crack. The washer makes the seal, not force. It shows as a drip at the nut, sometimes only after several days.
  • PTFE tape on the mixer nut. Tape on the nut thread does not help the seal and can prevent the flat washer seating properly.
  • Hot and cold swapped. Looking at the mixer, hot is usually on the left. On a thermostatic mixer, swapped supplies usually mean the thermostat does not control the temperature. Some models have reversible connections or are made in a reversed configuration, so the manufacturer's instructions decide.
  • Mixer crooked or off-centre. On a bath, a sloping spout looks untidy and water may splash outside the bath.
  • Cover plates not sitting on the tiles. Water and dirt get behind the plate. The cause is badly adjusted offset connectors or outlets set at the wrong depth.
  • Pipes not flushed. Sand from the pipes after a refit clogs the filters and damages the cartridge. The mixer then has a weak flow, a stiff lever or drips.
  • Pipe drilled when fitting the holder. Water can leak into the wall unnoticed for a long time. It shows as a damp patch, mould or loose tiles, often in the neighbour's ceiling below.
  • Tile cracked while drilling. This happens with hammer action on or when drilling too close to the tile edge. Replacing a single tile in finished tiling is time-consuming and a matching tile is often no longer available.
  • Hose without a washer or twisted. It drips at the joint by the mixer or shower head, or is damaged over time at the kink.

Checks at handover

  • the mixer is level, centred and firmly fixed,
  • the cover plates sit on the tiles without gaps,
  • no joint drips, even at full flow,
  • hot water is on the side marked red,
  • the lever moves smoothly and the temperature can be adjusted evenly,
  • the bath/shower diverter switches fully, without leaking into the other outlet,
  • the shower hose does not leak at either end and the shower holder grips firmly,
  • the riser rail is vertical and the sliding holder holds at every height,
  • there are no cracked or chipped tiles around the drilled holes,
  • on a thermostatic mixer, the temperature limit works,
  • the area is clean and neither the tiles nor the bath are damaged,
  • the mixer instructions and guarantee have been handed over, along with any unused parts from the box.

It is worth checking the joints again the next day. Slight seepage under a nut or behind a cover plate often only appears after a few hours of use.

DIY guide: replacing a wall-mounted mixer

Replacing a wall-mounted mixer with a new one at the same centres is within reach of a competent DIYer. The procedure is the same as in the steps above. If the outlets are damaged or need moving, call a plumber. For a DIY swap, keep these points in mind:

  • have new flat washers, PTFE tape, a smooth-jawed spanner and a spirit level ready,
  • put a cloth under the mixer and a towel in the bath so dropped tools do not chip the enamel,
  • do not skip flushing the pipes before fitting the new mixer, even if it seems unnecessary,
  • replace furred-up or leaking offset connectors with new ones, cleaning the outlet threads first,
  • after fitting, turn the water on slowly and watch all joints for several minutes,
  • if the holder is also being changed, drill only where pipes definitely do not run; if in doubt, reuse the original holes or leave the drilling to a professional.

Frequently asked questions

The guide price is €55.00 per piece. It applies to a standard wall-mounted mixer on working outlets. Expect to pay more for a deck-mounted or concealed mixer, corroded outlets, incorrect centres, or where pipework or tiling needs altering.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.