Price list 2026 · Europe

Fitting a Water Tap

Fitting a water tap means securing a tap to a basin, sink or wall and connecting it to the hot and cold supplies. The guide price is €25.00 per tap. The cost depends mainly on the tap type, the condition of the isolating valves and access.

Updated 09/2026·12 min read·13 price list items
Standard labour price
€25.00/ pcs
Indicative range
€20.00 - €32.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Fitting a Water Tap

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling13 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Sanitaryware installation cost

Basin mixer tap installationpcs€25.00 / pcspcsenter quantity-
Bath installation (tiling work)pcs€61.00 / pcspcsenter quantity-
Bath boxing-in and waste connectionpcspcs-
Shower tray step construction and slopingpcspcs-
WC concealed cistern frame installation + boxing inpcspcs-
Close coupled WC installationpcs€45.00 / pcspcsenter quantity-
Bath / shower mixer tap installationpcs€55.00 / pcspcsenter quantity-
Basin installationpcs€35.00 / pcspcsenter quantity-
Installation of glass screen on shower traypc€95.00 / pcpcenter quantity-
Installation of walk-in shower glass screen with U-channelpcpc-
Installation of glass bath screenpcpc-
Vanity unit installationpcs€60.00 / pcspcsenter quantity-
Fixing mirror with adhesivepcs€50.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What fitting a tap includes and when it is needed

The job includes checking that nothing drips once the water is turned back on. Most often it means replacing an old tap that drips or mixes poorly. Other common situations are a new kitchen, a new basin or a bathroom refurbishment.

A straightforward swap is a short job. The details still matter: new washers, correct tightening and supply hoses that are not under tension. A tap that drips slowly under the basin often shows itself only through a swollen vanity unit or a damp patch on the ceiling of the flat below.

Replacing a tap is also worthwhile when the lever is stiff, the temperature cannot be set finely, water sprays sideways from the spout, or the body is so heavily scaled that cleaning no longer helps. If only the spout drips, a new cartridge is sometimes enough. If water leaks under the base or from the joints, the tap and washers need attention.

Basin, kitchen and wall-mounted taps: the differences

All these taps do the same thing, mixing hot and cold water. They differ in size, fixing method and what to watch for during fitting.

  • A deck-mounted basin mixer is smaller and compact. It fits into the tap hole in the basin and connects to the isolating valves with flexible tap connectors. Countertop basins, often called vessel or bowl basins, need a tall mixer or a wall-mounted tap, otherwise the spout will not reach over the bowl.
  • A kitchen sink mixer is usually taller, with a longer swivel spout and often a pull-out spray. It fits into the sink or directly into the worktop. Worktop thickness matters here, because the fixing studs must be long enough. With a pull-out spray, free space must be left under the sink for the hose and its weight.
  • A wall-mounted tap screws directly onto the outlets in the wall. The outlets are usually at 150 mm centres. Small deviations are taken up by offset (eccentric) connectors.
  • A concealed mixer has its body hidden in the wall, with only the controls visible. The body is fitted before tiling, so it has to be coordinated with the tiler.

When choosing a tap, it is also worth looking at the cartridge and the body material. A ceramic cartridge operates smoothly and lasts a long time. A brass or stainless steel body is more durable than cheap alloys. Before buying, measure the tap hole in the basin or sink, the spout length and the height under the spout. The spout should point to the centre of the bowl. At a kitchen sink, there should be room for a tall pan.

What to clarify before booking

Most problems during fitting arise because the tap does not suit the basin, the sink or what is underneath it. Before booking, check the following:

  • Who buys the tap. If you buy it yourself, agree with the plumber whether to bring connectors, washers or new isolating valves, so the job does not stop over a small part.
  • How the water is heated. A small open-vented water heater under a basin or sink needs a special tap designed for that type of heater. A standard mains-pressure tap is not suitable, as the heater is not built to take mains pressure and can be damaged. In homes with low-pressure, tank-fed hot water, check that the tap is rated for low pressure.
  • Number and size of holes. A basin or sink may have one tap hole, none, or a knock-out hole on the side. With a new sink without a hole, decide in advance where the tap will go, so the spout can swivel without hitting the wall or a wall unit.
  • Standard or thermostatic tap. A thermostatic tap holds the set temperature, but it is more sensitive to correct hot and cold connection and to debris in the pipework.
  • What happens to the old tap. Agree whether the tradesperson removes and takes it away, or whether you keep it.
  • Condition of the isolating valves. Try turning them off before the tradesperson arrives. If they do not hold or will not turn, say so in advance so that replacing them can be planned for the same visit.

For a wall-mounted tap, measure the spacing of the wall outlets. For a concealed mixer, choose the product before tiling starts, because the body and its fitting depth differ for each system.

How a tap replacement is carried out, step by step

  1. Turning off the water: the tradesperson closes the isolating valves, or the main stopcock if needed, and opens the tap to drain the remaining water.
  2. Removing the old tap: the connectors are disconnected, the back nut is loosened and the tap is lifted out. Corroded nuts sometimes have to be cut off.
  3. Checking and cleaning: the area around the hole is cleaned of limescale and old sealant, and the threads and isolating valves are checked.
  4. Flushing the pipework: the valves are briefly opened into a bucket to wash out debris, especially after the water supply has been off.
  5. Preparing the new tap: the connectors are screwed into the tap body by hand and gently tightened according to the manufacturer's instructions.
  6. Fitting: a seal goes under the base, the connectors are fed through the hole and the washer and nut are fitted from below. The tap is aligned and tightened so it does not wobble. Ceramic basins must not be overtightened.
  7. Connecting: the connectors are attached to the valves, hot on the left and cold on the right, without kinks, crossing or tension.
  8. Leak test: the valves are opened slowly, the joints are checked with a dry paper towel and the tap is tested across the full temperature and flow range. For a few minutes, the area under the basin is watched for drips.
  9. Finishing: the aerator is fitted, the weight is attached to a pull-out spray on a kitchen tap, and the area is tidied.

What affects the price

The guide labour price is €25.00 per tap. It applies to the simplest case, replacing a deck-mounted tap with a similar type where the isolating valves work. The price rises if:

  • isolating valves are missing or seized and do not shut off the water. Replacing them is a separate job. In a flat this may mean turning off the water to the whole riser, which has to be arranged with the managing agent or building management,
  • the old nuts are corroded and the old tap is hard to remove, often by cutting. This can add tens of minutes of work,
  • access is poor, for example deep in a kitchen cabinet behind the waste trap, bin and sink bowl, or with a narrow pedestal basin, or with bath taps where access is through the bath panel enclosure,
  • it is a new installation where a hole has to be drilled in the worktop or sink, or new valves fitted,
  • the wall outlets do not match in spacing or height, or a wall-mounted tap is being swapped for a deck-mounted one or vice versa. The pipework then has to be altered, which is plumbing work priced according to its extent,
  • the tap is a more complex type, such as thermostatic, a kitchen mixer with a pull-out spray, or a tap with an extra outlet for a dishwasher, with more joints and adjustment,
  • it is a concealed mixer, which involves setting the body into the wall, a pressure test and fitting the controls later after tiling. The work is several times greater than for a deck-mounted tap.

Materials, meaning the tap itself, connectors, washers or valves, are usually charged separately. When comparing quotes, ask whether the price includes removing the old tap and small fittings.

What makes the job easier and what holds it up

Good preparation on your side saves a lot of time:

  • empty the cupboard under the basin or sink and move the bin out of the way,
  • have the new tap at home, unpacked and checked that the connectors, washers and fixings are in the box,
  • know where the main stopcock in the flat or house is and whether it works,
  • if the riser has to be turned off, arrange the time with the managing agent in advance, not on the day of fitting,
  • provide lighting at the basin and clear space for kneeling and tools.

The job is held up when it turns out on site that the tap does not fit the hole, the connectors are too short or have a different thread from the valves, or a part is missing from the box and a trip to the merchant is needed.

Common mistakes and how they show up later

  • Reusing old washers from the previous tap. New ones should always be used. An old, hardened washer holds at first but starts to weep after a while.
  • Badly tightened joints. Overtightening ruins the washer or cracks the nut. Undertightening leads to a slow drip that often goes unnoticed until the cupboard swells.
  • Hot and cold swapped. A standard tap then works the wrong way round. A thermostatic tap will also not regulate properly.
  • Twisted or stretched connectors. Over time they wear and burst. A burst connector under mains pressure can flood the kitchen and the flat below in a short time.
  • Debris in the pipework. After the water has been off, sand or rust gets into the tap and blocks the aerator. A short flush before connecting helps.
  • Silicone instead of a seal. Sealant around the base can add protection, but it does not replace the seal.
  • PTFE tape or hemp on a joint with a flat washer. Such a joint is sealed by the rubber or flat washer, not the thread. Tape under the washer stops it seating and the joint starts to leak.
  • A tap not tightened to the basin. It wobbles, turns during use, and the connectors gradually twist and are put under strain.

Checks at handover

Go over the finished work straight away, while the tradesperson is still there:

  • the tap is firm and does not wobble or turn when the lever is moved,
  • all joints under the basin or sink are dry after a few minutes of running,
  • hot is on the left and the lever moves smoothly through the full temperature range,
  • the spout points to the centre of the basin or sink and water does not splash outside,
  • the connectors are free of kinks and the isolating valves can be closed and opened,
  • on a kitchen mixer, the pull-out spray pulls out easily and returns by itself,
  • on a wall-mounted tap, the cover plates sit flush on the tiles and the tap is level,
  • the area is clean and you have received the instructions, guarantee and any spare parts from the box.

The next day it is worth looking under the basin or sink again with a torch and running a dry cloth over the joints. A slow leak sometimes appears only after several hours.

Replacing a kitchen or basin tap yourself

If the isolating valves work and the new tap is deck-mounted, you can replace it yourself. The procedure is the same as for a tradesperson above. Prepare an adjustable spanner, ideally two, a bucket, a cloth, a torch and new washers. If the tap does not come with connectors, buy good-quality braided stainless steel flexible connectors of the right length. These tips are also useful for a non-professional:

  1. Before buying, photograph the connections under the basin and take the old connector to the shop so that both the thread and the length match.
  2. After closing the valves, open the tap and check that the water has really stopped. If a valve does not hold, do not start and call a plumber.
  3. Put a cloth in the basin waste so that a washer or nut cannot fall into it.
  4. Spray a seized nut with penetrating oil and leave it for a while before loosening it.
  5. Screw the connectors into the new tap on a table, not under the basin where the tap body is hard to reach.
  6. When tightening the back nut, hold the tap with your other hand so it points straight once tightened.
  7. When tightening the connectors on the valves, hold the valve with a second spanner so it does not twist in the wall.
  8. After testing, leave a dry paper towel under the joints overnight. Any drip will be obvious in the morning.

Connectors with a rubber washer on the end and joints with a flat washer are not sealed with PTFE tape or hemp. Tape or hemp belong only on joints that seal in the thread, such as offset connectors screwed into wall outlets.

If there is an electric water heater, a socket or a dishwasher supply under the basin or sink, do not touch the electrical parts. Connecting the heater and any electrical work should be left to a qualified electrician.

Wall-mounted and concealed mixers: when it is a job for a professional

A competent DIYer can fit a wall-mounted tap to existing outlets at standard spacing, for example when completing a bath installation and waste connection. First, offset connectors sealed with hemp or PTFE tape are screwed into the outlets. Their spacing and depth are adjusted so the cover plates sit on the tiles. The tap is then screwed on over flat washers and levelled with a spirit level.

However, if outlets are being moved, walls opened up or a concealed mixer fitted, the work belongs to a plumber. The concealed body must sit at the exact depth specified by the manufacturer so the controls finish flush with the tiles. A pressure test is needed before the wall is closed. The tiler then leaves precise openings for the controls, so this step is best planned together with the tiling work and, in a walk-in shower, with constructing the shower kerb and creating the fall. If shared pipework in a block of flats is affected, consult the managing agent. For a larger alteration, check with your local authority building control whether any approval is required.

Frequently asked questions

The guide labour price is €25.00 per tap for a standard replacement of a deck-mounted tap with working isolating valves. Expect to pay more for corroded nuts, poor access, valve replacement, a new hole in the worktop or a concealed mixer. The tap and materials are usually charged separately.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.