Building work price list: Bath Installation and Waste Connection
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Sanitaryware installation cost | ||||
| Bath installation (tiling work) | pcs | €61.00 / pcs | pcs | enter quantity- |
| Bath boxing-in and waste connection | pcs | pcs | - | |
| Shower tray step construction and sloping | pcs | pcs | - | |
| WC concealed cistern frame installation + boxing in | pcs | pcs | - | |
| Close coupled WC installation | pcs | €45.00 / pcs | pcs | enter quantity- |
| Bath / shower mixer tap installation | pcs | €55.00 / pcs | pcs | enter quantity- |
| Basin installation | pcs | €35.00 / pcs | pcs | enter quantity- |
| Basin mixer tap installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Installation of glass screen on shower tray | pc | €95.00 / pc | pc | enter quantity- |
| Installation of walk-in shower glass screen with U-channel | pc | pc | - | |
| Installation of glass bath screen | pc | pc | - | |
| Vanity unit installation | pcs | €60.00 / pcs | pcs | enter quantity- |
| Fixing mirror with adhesive | pcs | €50.00 / pcs | pcs | enter quantity- |
What bath installation includes and when it is needed
Bath installation is needed during a bathroom refurbishment, when an old bath is replaced with a new one, or when a shower room is turned into a bathroom with a bath. The quality of the installation decides three things: watertightness, stability and drainage.
A badly fitted bath rarely causes trouble straight away. Water can seep for years under the rim or through a leaking trap into the floor, the wall or the flat below. The damage is often only noticed when a stain appears on the ceiling downstairs. A full bath with a person in it also weighs several hundred kilograms. If it moves even slightly under that load, the sealant joint at the wall splits. If the waste has no proper fall or the trap is badly connected, water drains slowly, debris builds up in the pipe and the drains can smell.
The job sits between several trades. The plumber deals with the waste and trap, the tiler with the enclosure, sealing and tiling. A metal bath may also need an electrician. It is worth agreeing in advance who does which part and in what order. Often the plumber connects the basin installation on the same visit, and the tiler moves straight on to the rest of the tiling services in the room.
What to decide before work starts
Most decisions need to be made before the bath is bought, or at least before the waste is prepared. They are hard to change later.
- Bath size and shape: the bath must fit the space including the enclosure and tiles. When replacing a bath, measure not only the length and width but also where the existing waste is and at what height.
- Waste end: the waste outlet should be at the end where the drain is. Offset and corner baths are sold in left-hand and right-hand versions that cannot be swapped.
- Taps: decide whether they will be wall-mounted or deck-mounted on the bath. Deck-mounted taps need tap holes in the bath and supply pipes run under it.
- Waste type: plug and chain, a rotary (cable-operated) waste or a click-clack waste that opens when pressed. The waste and trap must suit both the bath and the diameter of the waste pipe.
- Access panel position: it belongs on the trap side. If a washing machine or cabinet will stand there, think about how the panel will be reached.
- Showering over the bath: if the bath will also be used as a shower, allow for higher tanking on the wall and a bath screen whose fixings should be known before tiling. If a walk-in shower is still under consideration, compare it with constructing and creating a fall for a shower kerb.
- Metal bath: with a steel or cast iron bath, supplementary bonding is often considered. Whether it is needed in a particular bathroom is decided by a qualified electrician based on the electrical installation, for example whether the bathroom circuits have RCD protection. Only the electrician may carry out the electrical part. In England and Wales, work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before work starts.
- Flats and approvals: if the work affects the shared soil stack, agree it in advance with the managing agent or freeholder. Replacing a bath does not normally need any approval. However, some plumbing work, such as fitting certain large baths, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify. If the refurbishment affects structural elements or shared services, check the requirements with your local authority and leave the work to a professional.
How bath installation is carried out step by step
- Preparing the floor: the floor under the bath must be solid, level and clean. Unevenness is corrected with levelling compound or screed.
- Checking the waste: during a refurbishment the old waste is checked. Cast iron or cracked pipework is worth replacing now, while everything is exposed.
- Tanking: the floor and the wall behind the bath are tanked before the bath goes in, because nobody can reach these areas later. The tanking must dry according to the manufacturer before further work.
- Feet or frame: the bath is set on adjustable feet or a support frame, with the base supported as the manufacturer specifies.
- Levelling and height: the rim is levelled with a spirit level in both directions. Most baths have the fall to the waste moulded into the base, so it is the rim that is set level. The height is set so the trap fits underneath and the rim lines up with the planned tiling.
- Connecting to the waste: the trap with waste and overflow is connected to the drainage. Details follow in the next section.
- Leak test: the bath is filled and every joint is checked while it drains. Only then does the enclosure go up.
- Sealing tape: a bath sealing tape is fixed between the rim and the wall and bonded into the wall tanking.
- Enclosure: in a tiled finish the bath is usually boxed in with aerated concrete blocks, as an alternative to a ready-made bath panel enclosure. The enclosure holds the bath sideways but must not lift it or press against the rim. An opening for an access panel is left on the trap side.
- Tiling: the enclosure and walls are tiled so that the wall tiles overlap the bath rim. Water then runs down the tiles into the bath, not behind it.
- Access panel: a panel is fitted into the opening so the trap can be reached.
- Silicone: the joint between bath and tiles is filled with sanitary silicone, ideally with the bath full of water. The water is let out only after the silicone has cured.
Bath waste connection and fitting the trap
The waste connection is the part that disappears once the bath is enclosed, so it deserves the most attention.
- Pipe diameter: bath waste pipe is usually 40 mm, sometimes 50 mm, and bath traps have a 40 or 50 mm outlet. A change in diameter is made with a reducer or a rubber push-fit seal into the socket, never with tape or silicone.
- Socket height: the waste socket in the wall or floor must be lower than the trap outlet so the water runs with a fall. If the socket is too high, the bath has to be raised, which also moves the rim in relation to the tiles, or the waste has to be re-routed lower. Where space under the base is tight, low-profile traps are used.
- Fall: the horizontal run of waste needs a slight fall, usually around two per cent. The pipe must not sag or rise anywhere.
- Flexible connector: a short flexible section helps take up a small misalignment between trap and socket. A long corrugated hose, however, sags easily, forms a second bend where water stands, and debris collects in the ribs. Rigid pipe with fittings is more reliable.
- Overflow: the overflow hose connects the opening below the rim with the waste. It must not kink, and the overflow cover must be tightened with its seal. With a rotary waste, the operating cable also runs through the overflow and must not be trapped.
- Seals: fit them as supplied by the manufacturer, without silicone unless the manufacturer specifies it.
- Test: fill the bath up to the overflow and then release it all at once. This checks the waste, the overflow and the drain connection at full flow.
Types of bath and what each requires
- Acrylic bath: light and warm to the touch, but it needs good support under the base. Depending on the manufacturer it goes on a frame, on feet with a base support or into a bed. Without support the material can crack.
- Enamelled steel bath: stiffer and more scratch-resistant. A sound-deadening pad is worth fitting, as without it the bath drums when filling.
- Cast iron bath: very heavy, so the floor's load capacity must be checked and several people are needed to carry it.
- Freestanding bath: no enclosure is built, but the floor waste must be positioned all the more accurately, because it is visible and difficult to move later.
What affects the price
The guide labour price is €61.00 per bath. It reflects a standard case: a rectangular bath in a prepared bathroom with a level floor and the waste in the right place. These factors change the final figure:
- Floor condition: an uneven or damaged floor must be levelled first. That means extra labour and materials, and with screed also waiting for it to dry.
- Waste condition and position: a waste in the wrong place, too high or in poor condition has to be re-routed or replaced. Replacing old cast iron pipework may mean chasing into the floor and wall, which adds considerably to the cost.
- Bath type: an acrylic bath on a frame is the simplest. Corner and offset baths take more care to level and enclose. A cast iron bath adds work from the moment it is carried in.
- Enclosure: a straight block enclosure is routine work. Shelves, niches, curves and a step by the bath add hours of work and tile cutting.
- Access: a heavy bath sometimes has to be carried up several floors without a lift, which needs more people.
- Removing the old bath: breaking out the old enclosure and taking away the old bath, especially a cast iron one, is extra work and extra waste to dispose of. Before the rubble is taken away, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Scope of the quote: tanking, tiling the enclosure, the access panel, the trap and electrical bonding are often separate items. When comparing quotes, check exactly what each one includes.
What should be ready before the tradesperson arrives
A lot of time is lost waiting for a missing part or another trade. It helps to have the following ready:
- The bath: delivered in advance and inspected. Report damaged enamel or a crack in the acrylic before installation, as it is much harder to claim once the bath is enclosed.
- Fittings: trap and waste, feet or frame, access panel and sealing tape bought and on site, ideally as recommended by the bath manufacturer.
- Instructions: the bath's fitting instructions, which state how the base must be supported.
- Route: a clear path from the entrance to the bathroom and, in a block of flats, use of the lift arranged.
- Scheduling: for a metal bath, the electrician booked so the bonding is done before the enclosure goes up.
- Tanking: finished and dry, if someone else is doing it.
- Tiles: chosen and on site, so the rim height can be set precisely to the tile courses.
Common mistakes and how they show up later
The bath stands on feet only, with no base support, even though the manufacturer requires it. The base flexes under load, the bath moves, the silicone splits and acrylic can eventually crack.
No tanking behind the bath or no sealing tape under the rim. Water that gets past ageing silicone goes straight into the wall and floor. It shows as damp patches, mould or a stain on the neighbour's ceiling.
The tiles stop above the bath rim instead of overlapping it. Water runs into the joint behind the bath and everything depends on the silicone.
Silicone is the only protection against water. Silicone ages and needs renewing. By the time someone notices a small split, water may already be under the bath. The main protection should be the tanking and sealing tape, with silicone only as the final layer.
The enclosure has no access panel. Traps occasionally block or seals loosen. Without a panel the tiles have to be broken out and replaced, often with tiles that are hard to match.
The waste has no fall or runs uphill. Water drains slowly, stands in the pipe, debris builds up and the waste smells.
No leak test before enclosing. A dripping joint only shows itself years later as damage to the floor or the flat below.
The enclosure presses on the bath rim. The bath lifts or the stress damages the rim, and the silicone joint tears.
DIY guide: installing an acrylic bath
If the tanking is done, the waste is ready at a suitable height and you have reasonable practical skills, a standard acrylic bath can be installed without a tradesperson. For re-routing drainage in a block of flats or for bonding a metal bath, call a professional.
- Check that the floor is level and solid, and correct any unevenness.
- Fit the feet or frame to the bath following the manufacturer's instructions.
- Fit the trap with waste and overflow, and fit the seals without silicone unless the manufacturer specifies it.
- Set the bath in place and level the rim with a spirit level in both directions.
- Connect the trap to the waste, check the fall and make sure no hose sags anywhere.
- Fill the bath to the overflow, release it all at once and check every joint.
- Fix sealing tape between the rim and the wall and bond it into the tanking.
- Build the block enclosure, leaving an opening for the access panel.
- Tile the enclosure and walls so the tiles overlap the bath rim.
- Fit the access panel into the opening and check that the trap can be reached through it.
- Fill the bath with water and run the silicone joint, letting the water out only once the silicone has cured as its manufacturer specifies.
How to check the finished work
- Stability: the bath does not move or creak under load.
- Level: the rim is level and water in the base runs to the waste.
- Watertightness: no joint drips after filling and draining a full bath.
- Drainage: water drains steadily, without gurgling.
- Overflow and plug: the overflow carries water away and the plug holds water in the bath.
- Access panel: it opens and the trap can be reached through it.
- Tiling: the tiles overlap the bath rim and the joints are fully grouted.
- Silicone: continuous, without splits, and well bonded to both surfaces.
- Bath surface: the enamel or acrylic is not scratched or chipped, and the bath is clean of mortar and adhesive.
- Electrical work: if the electrician carried out bonding, you have a certificate from them confirming the work was done to BS 7671:2018+A4:2026, the current IET Wiring Regulations.
Frequently asked questions
The guide price for installing one bath is €61.00 per bath. The final figure goes up with an uneven floor, re-routing the waste, a corner or offset bath, a complex enclosure and a heavy bath with no lift. Also check whether the quote includes tanking, tiling the enclosure and the access panel.
Positioning, levelling and connecting a bath to a prepared waste usually takes a few hours. The whole process spreads over several days, however, because the tanking, tile adhesive and grout must dry and the silicone must cure. Re-routing the waste or levelling the floor with screed adds further waiting time.
Usually before the walls around the bath are tiled. The tiles then overlap the rim and water has nowhere to get in. If the bath is fitted against finished tiling, the joint relies on silicone alone, which is a weaker solution.
Yes, if the pipe is in good condition, has a suitable diameter and the socket is low enough for water to run from the trap with a fall. Cracked or cast iron pipework is worth replacing during a refurbishment while it is exposed. Later it would mean breaking out the enclosure and the tiles.
A full bath settles slightly. If the silicone is run in this position, it is not stretched and torn in normal use.
The thin steel sheet resonates. A sound-deadening pad under the feet and filling between the bath and the enclosure, as the manufacturer recommends, both help.
Related work
How a built-up shower kerb and base is constructed, what fall it needs, which materials suit it and what to check before tiling and at handover.
How a built-in bath is boxed in, which materials to use for the panel wall, why waterproofing and an access hatch matter, and how to check the finished work.
How wall-hung, vanity and inset basins are fitted, what to watch with fixings and connections, and how to check the finished job.
How floor-standing and wall-hung vanity units are fitted, what makes the job harder, the mistakes to avoid and how to check the finished work.
How to stick a mirror to plaster, plasterboard or tiles, which adhesive to choose, what to avoid and how to check the finished job.
How a close-coupled WC is fitted and connected, which waste outlet you have, what complicates the job and how to check it stands firm and does not leak.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.