Building work price list: CYKY cable: sizes, breakers, running
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
What the CYKY marking means
The letters describe how the cable is built: C stands for copper core, Y for PVC insulation, K for cable and the final Y for the PVC sheath. The marking is followed by a letter and the number and size of the cores, for example CYKY-J 3x2.5:
- J means the cable has a green-yellow protective earth conductor. This is the type used for ordinary socket and lighting circuits,
- O means a cable without a protective conductor. It is used where no earth conductor is needed, for example on some control circuits,
- 3x2.5 means three cores, each 2.5 mm². Five-core cables, such as 5x2.5, are run to three-phase appliances.
According to manufacturers' data sheets, CYKY cable is rated for 450/750 V, should not be laid at temperatures below -5 °C, and the bending radius should not be less than 12 times the cable diameter. Besides the round CYKY there is also the flat CYKYLo for dry areas. Suppliers point out that it must not be laid on combustible surfaces or in cavities, and some professionals advise against it.
When CYKY cable is run
- for a new installation in a new build or during a full rewire,
- when replacing old aluminium wiring in a prefab block of flats or an older house with copper,
- for a new circuit for a cooker, oven, washing machine, water heater or air conditioning,
- when adding a socket or light where there was none before,
- for a supply to a garage, workshop or garden: outdoors, CYKY cable is run in a protective conduit.
What needs deciding before work starts
Cable size and protection
The cable size and the breaker in the consumer unit go together. The breaker protects the cable from overheating, so it must not be rated higher than the cable can carry. In flats and houses the usual combinations are:
- lighting circuits: 3x1.5 cable, 10 A breaker,
- socket circuits: 3x2.5 cable, 16 A breaker; according to technical literature, no more than 10 sockets go on one circuit,
- appliances rated at 2 kW or more, such as a cooker, dishwasher, washing machine, tumble dryer or water heater, should have a dedicated circuit,
- three-phase appliances, such as a hob or a larger pump, are connected with five-core cable sized to their output.
On long runs, for example to a garage at the far end of the plot, the electrician also calculates the voltage drop and may choose a larger cable. The price list item applies to cables up to 3x2.5. Thicker cables are harder to pull and are priced differently.
Residual current device
Socket circuits and bathroom circuits are now protected by an RCD with a 30 mA tripping current. If a new circuit is added to an old consumer unit without an RCD, allow for fitting one. You will find more in the article on wiring breakers and RCDs.
How the cable is laid
- under plaster in a chase: the most common solution in masonry walls. The cable is laid in a cut chase, fixed and plastered over,
- in flexible conduit: the chase must be deeper, but the cable can later be pulled out and replaced without cutting the wall,
- in plasterboard partitions and ceilings: the cable runs in the cavity, usually in conduit,
- surface-mounted in trunking: a quick solution in a cellar, garage or for an added socket,
- outdoors: in a protective conduit so the cable is protected from damage.
Routes in walls
Cables in walls run horizontally and vertically within so-called installation zones, never diagonally. Horizontal zones are in a band 150 to 450 mm below the ceiling and above the floor, vertical zones in a band 100 to 300 mm from corners, doors and windows. In the kitchen there is an additional zone 900 to 1200 mm above the floor. This makes it possible to work out later where a cable runs, and nobody drills into it when putting up a shelf.
Who may run and connect the cable
Work on electrical installations is governed by national rules. Only a person with electrical training, the required experience and the relevant certification, in other words a qualified, licensed electrician, may carry it out independently. An instructed person without electrical training may only assist under supervision. The finished installation is checked by an inspector, who issues an inspection report.
So a layperson should not run and connect the cable themselves. This is not just a formality. Without an inspection report you may run into problems at building sign-off, when selling the flat and with an insurance claim, for example after a fire.
How the work proceeds step by step
- Circuit design: the electrician goes through with you where the sockets, switches and lights will be, and divides them into circuits with the right cable size and breaker.
- Marking out routes: the routes are drawn on the wall within the installation zones, straight and at right angles.
- Chases and boxes: chases and holes for back boxes are cut or routed. In plasterboard, holes are drilled through the studs.
- Pulling the cable: the cable is unwound from the drum or coil without kinking or twisting so the sheath is not damaged. In conduit it is drawn in with a flexible draw tape. A spare length is left at each end for connection.
- Labelling: the cable ends are labelled by circuit so it is clear what goes where.
- Fixing: the cable is fixed in the chase with plaster or clips so it does not fall out during plastering.
- Photo record: before plastering, the routes are photographed with a measuring tape or with reference to the room corners.
- Connection: the cable is connected in junction boxes, to sockets and switches and in the consumer unit.
- Testing and inspection: insulation resistance and continuity of the protective conductor are measured, the RCD is tested and the inspector issues a report.
- Making good: the chases are filled and the walls prepared for painting.
What affects the price
The guide price for running CYKY cable up to 3x2.5 is €1.50 per linear metre. The total is mainly influenced by the following:
- length of the runs: what counts is the actual cable length from the consumer unit to the last socket, not the straight-line distance. Routing within the zones is longer than going diagonally across the wall,
- laying method: laying cable in a ready-cut chase is quicker than drawing it through long conduit with many bends,
- overhead work: runs in the ceiling, suspended ceiling or through the loft are slower,
- cable size and number of cores: the item applies to cables up to 3x2.5. Five-core and thicker cables are heavier and more expensive,
- occupied flat: covering up, moving furniture and working in stages add time,
- related work: cutting chases, fitting boxes, connecting sockets, altering the consumer unit, inspection and making good are charged separately,
- materials: the cable itself and conduit are paid for according to actual use.
For a whole flat it is worth looking at the total price of the electrical installation, not just at running the cable. A complete rewire of a flat covers all these steps at once.
What should be ready
- it is clear where the sockets, switches, lights and larger appliances will go, ideally with a floor plan and the kitchen layout,
- it is agreed whether the cable will be laid in conduit or directly in the chase,
- the walls have not yet been plastered, or cutting chases in finished walls has been agreed,
- the rooms are cleared and the power can be switched off in part of the flat,
- in a block of flats, the building manager knows about the work if the common supply or riser is affected.
Typical mistakes and how they show up later
Cable running diagonally across a wall
Cable routed outside the installation zones is the most common reason for drilled-through wiring when hanging cupboards and pictures. The consequences range from a tripped breaker to injury.
Undersized cable on a large breaker
A 3x1.5 cable on a socket circuit with a 16 A breaker overheats at full load. The breaker will not protect it, because it is rated for a thicker cable.
Damaged sheath
A cable kinked during pulling or nicked while cutting the chase can work for years and fail only later. Insulation resistance testing usually reveals it, which is why testing before plastering matters.
Joints hidden in the wall
A joint between two cables must be in an accessible box. A joint buried in plaster cannot be checked, and when a fault occurs it has to be found by cutting into the wall.
Joining copper to aluminium without a suitable connector
When old wiring is partly replaced, new copper cable is connected to aluminium. Without a connector designed for this joint, the contact loosens over time and heats up.
No record of the routes
Walls with cables should be photographed before plastering. Anyone who skips this has to search for cables with a detector or blindly at every later alteration.
How to check the finished work
- you have the inspection report and the breakers in the consumer unit are labelled by room or appliance,
- every socket and every light works and is switched off by the correct breaker,
- the RCD trips when the test button is pressed,
- in the socket box the marking is visible on the cable sheath, for example CYKY-J 3x2.5,
- you have photos of the routes before plastering and the routes are straight and at right angles,
- there are no cracks in the walls above the chases and no warmth or smell can be noticed at the sockets.
DIY guide: what you can do yourself
Running and connecting CYKY cable may only be done by an authorised person with electrical qualifications. A layperson can save the electrician time on preparatory work if this is agreed in advance:
- Prepare a floor plan showing the positions of sockets, lights and appliances.
- Clear the rooms and cover the floors.
- Once the electrician has marked out the routes, cut the chases, if the electrician agrees.
- When the work is finished, fill the chases and prepare the walls for painting.
Do not touch the consumer unit, boxes or sockets while they are live. If someone without authorisation has already done electrical work, have it checked and tested before plastering.
Frequently asked questions
The guide labour price for cable up to 3x2.5 is €1.50 per linear metre. Cutting chases, connection, inspection and the cable itself are charged separately.
Sockets usually take CYKY-J 3x2.5 with a 16 A breaker, lights CYKY-J 3x1.5 with a 10 A breaker. For higher-rated appliances and long runs, the electrician decides based on a calculation.
CYKY-J has a green-yellow protective earth conductor, CYKY-O does not. Type J is used for sockets and lights in a flat.
No. Under national rules, work on electrical installations may only be done by a person with electrical qualifications, and the work must be inspected once finished. You can help with preparation yourself, for example by clearing the rooms and filling the chases.
Under plaster in a masonry wall you can lay it directly in the chase. Conduit allows the cable to be replaced later without cutting the wall. Outdoors and wherever there is a risk of damage, the cable is run in a protective conduit.
Flat cable needs a shallower chase, but it is intended only for dry areas and must not be laid on combustible surfaces or in cavities. Round CYKY can be used in dry, damp and wet areas, which is why electricians choose it more often.
Yes. The inspector tests the new circuit and issues an inspection report. Without it you have no proof that the installation is safe, which can be a problem when selling the flat or making an insurance claim.
Related work
How shielded FTP data cabling is installed in a flat, house or office, which cable category to choose and how to check the finished network.
How to fill cable chases and back box openings after rewiring, which filler to choose, common mistakes and how to check the wall before painting.
How a bathroom or WC extractor fan is installed and wired, which type to choose, what to watch out for and how to check the finished job.
How downlights are fitted into plasterboard ceilings: cutting the hole, wiring, choosing the fitting, typical mistakes and how to check the work.
How a pendant light or chandelier is installed, how to fix it safely to different ceilings, how high to hang it and how to check the finished job.
How an electrician fits a wall light, what makes the job harder, what to watch for in bathrooms and outdoors, and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.