Building work price list: Socket and Switch Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Electrical works cost | ||||
| 230V socket outlet point - first fix | pcs | €6.80 / pcs | pcs | enter quantity- |
| Switch point - first fix | pcs | €8.50 / pcs | pcs | enter quantity- |
| 230V socket / switch - second fix | pcs | €11.00 / pcs | pcs | enter quantity- |
| TV / data socket point - first fix | pcs | €12.00 / pcs | pcs | enter quantity- |
| TV / data socket - second fix | pcs | €50.00 / pcs | pcs | enter quantity- |
| Data cabling installation (FTP) | pcs | pcs | - | |
| Lighting point - first fix | pcs | €8.40 / pcs | pcs | enter quantity- |
| Pulling power cable (up to 3x2.5) | lm | €1.50 / lm | lm | enter quantity- |
| Pulling data/comms cable (FTP, coaxial) | lm | €1.20 / lm | lm | enter quantity- |
| Chasing for cable - brick / aerated concrete | lm | €5.80 / lm | lm | enter quantity- |
| Chasing for cable - concrete / panel | lm | €8.50 / lm | lm | enter quantity- |
| Making good walls after electrical installation | lm | €7.50 / lm | lm | enter quantity- |
| Install and connect consumer unit | pcs | €150.00 / pcs | pcs | enter quantity- |
| Connect 1-phase circuit breaker | pcs | €12.00 / pcs | pcs | enter quantity- |
| Connect RCD (Residual Current Device) | pcs | €30.00 / pcs | pcs | enter quantity- |
| Install and connect doorbell | pcs | €55.00 / pcs | pcs | enter quantity- |
| Connect and fit room thermostat | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install LED strip with aluminium profile | lm | €12.00 / lm | lm | enter quantity- |
| Installation of recessed spotlight in plasterboard ceiling | pcs | €50.00 / pcs | pcs | enter quantity- |
| Install pendant light fitting | pcs | pcs | - | |
| Install wall-mounted light fitting | pcs | €14.00 / pcs | pcs | enter quantity- |
| Install and connect extractor fan (bathroom/WC) | pcs | pcs | - | |
| Professional connection of 400V hob | pcs | pcs | - | |
| Install external LV connection to flat | pcs | pcs | - | |
When sockets and switches are installed
- new builds and full renovations: all outlets are created at once during the first fix, while the walls are still unplastered or before skimming,
- kitchen or bathroom renovation: sockets are added above the worktop, for appliances and by the mirror, often together with dedicated circuits,
- new plasterboard partition or wall lining: back boxes are fitted into the boards and cables run through the cavity,
- adding a socket or data point: by the television, desk or bed, wherever an extension lead currently hangs,
- replacing old accessories: when redecorating or changing the design, only the second fix is done and the back boxes and cables stay in place.
What to decide before work starts
How many sockets and where
The most common complaint after a renovation is too few sockets or sockets in the wrong place. A university teaching text on electrical installations in flats gives the following recommended minimum: two sockets for a room up to 8 m², three for a room of 8 to 12 m², four for 12 to 20 m² and five for rooms over 20 m². For a kitchen, five sockets plus one each for the fridge and the cooker hood, two for a bathroom, and one each for the WC and the hallway. This is a minimum, not a ceiling. In practice it pays to go through each room and count the appliances that will actually be there.
This applies doubly to kitchens. On forums, people repeatedly describe how the electrician positioned the sockets without a finished kitchen design: the microwave socket ended up behind a tall unit, the cooker hood cable was too short and there were only two sockets above the worktop. Putting it right then meant cutting into brand new tiling. That is why the electrician should have a dimensioned kitchen drawing before the first fix, or at least a simple sketch agreed with the kitchen supplier.
Height and installation zones
Local wiring rules mainly deal with where cables may run in a wall. According to the teaching text mentioned above, the horizontal zones are 300 mm wide: the lower zone 150 to 450 mm above the finished floor, the middle zone 900 to 1200 mm and the upper zone 150 to 450 mm below the finished ceiling. The vertical zones are 200 mm wide and lie 100 to 300 mm from room corners, doors and windows. In the middle zone, switches and sockets are placed at a height of up to 1150 mm, which applies, for example, to sockets above a kitchen worktop. A light switch belongs by the door, on the handle side. The benefit of the zones is practical: if you know where they are, you will not drill into a cable when putting up a shelf.
Bathrooms and outdoor sockets
In a bathroom, the distance from the bath and shower is what counts under local regulations. According to the teaching text, sockets and switches at a height of 1.2 m above the floor may sit right at the edge of the washing area, while those placed lower must be at least 0.2 m away from it. Bathroom sockets and outdoor sockets must be protected by an RCD with a rated residual current of no more than 30 mA.
Circuits
According to the teaching text, no more than 10 sockets are installed on one socket circuit, and the circuit is protected by a 16 A circuit breaker. Appliances rated at 2 kW or more, such as a cooker, washing machine, dishwasher, water heater or tumble dryer, should have dedicated circuits. The number of circuits and breakers is determined by the design and the consumer unit, not by the socket itself. For larger changes it is therefore worth considering the consumer unit as well.
Masonry or plasterboard
A standard back box is set into a solid wall of brick, concrete or aerated concrete. For a plasterboard partition or wall lining, according to ABB installation instructions, you need a dry-lining box with lugs that clamps into the board. Where several accessories sit side by side, the boxes are joined at 71 mm centres so that a multi-gang frame fits over them. ABB recommends boxes at least 40 mm deep so that an electronic device, such as a dimmer, will also fit later.
TV and data points
Under typical network operator recommendations, data cabling in a flat uses Category 5E or 6 UTP cable, and all cables are brought back to one central point where the router or a small data cabinet sits. A single segment may be up to 100 m long, which is not a problem in a flat. Data cables should run at least 30 cm away from 230 V wiring and are best placed in conduit with some spare capacity so that they can be replaced later without cutting into the wall. A TV point is fed by a coaxial aerial cable, which also runs separately. A TV point, a data point and 230 V sockets often meet by the television, so bear this in mind when planning the faceplate.
How the work is carried out, step by step
First fix
- Marking out: following the design or what has been agreed, the electrician marks the box positions and cable routes on the wall within the installation zones. The client should check them before any chasing starts.
- Chases and openings: chases for electrical wiring are cut into the masonry and holes drilled for the back boxes. In plasterboard, a hole saw is used to cut through the board.
- Setting the boxes: each box is set so that, once plastered or tiled, it sits flush with the surface, neither protruding nor recessed too deeply.
- Cable: a cable is brought into the box from the direction of the consumer unit or a junction box. Data and TV cables run in separate conduit.
- Slack and protection: enough conductor length is left in the box, ABB states around 13 cm. The ends are insulated and the box is covered so that the plasterer does not fill it.
- Making good: the chases are plastered over, which is a separate job, making good walls after electrical work.
Second fix
- Isolating the circuit: before fitting, the circuit is switched off at the breaker and a voltage tester is used to confirm it is dead.
- Preparing the conductors: the conductors are stripped to the length marked on the accessory, and the ends must be straight.
- Connection: with screwless terminals the conductor is simply pushed in, while screw terminals are tightened. On a socket, line and neutral are connected according to the local convention and the protective conductor goes to the earth terminal.
- Fitting the accessory: the insert is fixed into the box with screws or expanding claws, depending on the type, and levelled with a spirit level.
- Frame and cover: the frame must sit tight against the wall, and with a multi-gang frame all accessories are checked to be in a straight line.
- TV and data: the coaxial cable is connected to the TV point, and the data cable is punched down into an RJ45 module according to the chosen wiring scheme, and at the other end into a patch panel or socket at the central point.
- Testing: the breaker is switched back on and every socket and switch is checked for correct operation, and for data points the connection is tested.
What affects the price
The price list distinguishes between first fix and second fix, and each item is charged per piece:
- first-fix outlet for a 230 V socket €6.80 per piece,
- first-fix outlet for a switch €8.50 per piece,
- first-fix outlet for a TV or data point €12.00 per piece,
- second fix of a 230 V socket or switch €11.00 per piece,
- second fix of a TV or data point €50.00 per piece.
The final total is then driven mainly by the following:
- number of outlets: the price rises with every piece, so it pays to plan precisely, neither adding sockets where they will not be needed nor skimping where an extension lead will end up being used,
- wall material: boxes and chases take longer in concrete than in brick or aerated concrete. Chases are charged separately in the price list,
- distance from the consumer unit: long runs mean more cable and more chasing,
- plasterboard: boxes go into the boards quickly, but the cables must be pulled through before the second side of the partition is boarded,
- combinations of accessories: a double socket under one frame or a group of sockets by the television means several boxes and outlets, not one,
- accessories and frames: the second-fix price covers labour. Sockets, switches, TV and data modules and frames are chosen from a design range, and their prices vary considerably between ranges,
- data infrastructure: the central point, a patch panel or a small data cabinet are separate jobs.
You can work out the overall budget for a flat, including the consumer unit and lighting, in the price list for electrical installation work.
What should be ready
- a floor plan showing the layout of furniture, beds, the television and the desk,
- for the kitchen, a dimensioned drawing of the units and a list of appliances,
- a decision on where the router or central data point will be and where the aerial cable runs,
- for plasterboard, the framework built with one side boarded so that cables can be pulled through,
- for the second fix, finished plastering, painting and tiling, and a chosen design range of accessories,
- access to the consumer unit and the ability to switch circuits off.
Typical mistakes and how they show up later
Outlets placed without a furniture plan
The socket ends up behind a wardrobe, a bed or a tall kitchen unit. An additional socket then means cutting into a finished wall and repainting.
Box protruding or set too deep
The frame does not sit against the wall, the accessory wobbles or cannot be fixed properly. ABB mentions spacer frames for this situation, but it is better to set the box accurately at first fix, allowing for the thickness of plaster or tiles.
Standard box in plasterboard
A box without lugs will not hold in the board. When a plug is pulled out, the socket is torn out of the wall together with the box.
Data cable in the same chase as 230 V
The recommended separation of at least 30 cm from 230 V wiring is not kept. A cable without conduit also cannot be replaced if it is damaged one day or a faster one is needed.
Shallow box
When later replacing a switch with a dimmer, timer switch or smart switch, the device will not fit in the box.
Bathroom sockets without an RCD
The inspector will not sign off such an installation.
Second fix before painting
Frames get paint on them or covered in dust, or the decorator removes them anyway. ABB recommends taking the covers off and masking the accessories with tape when painting, with the circuits switched off.
How to check the finished work
- the number and position of outlets match what was agreed or the design, and nothing is hidden behind furniture,
- frames sit flat against the wall across their whole surface, are level, and multi-gang groups are in a straight line,
- accessories are firmly fixed, and the socket does not move when a plug is pulled out,
- every socket is live and the switches control the correct lights,
- sockets in the bathroom and outdoors are behind an RCD, and pressing the TEST button on the RCD trips it,
- data points connect to the router and the TV point has a signal,
- circuits in the consumer unit are labelled so that it is clear which breaker belongs to which room.
For a new electrical installation, an inspection and testing by a qualified inspector is carried out before it is first put into service. The result is an electrical installation inspection report, which you should keep safe.
For DIYers: who may connect sockets
Work on 230 V electrical installations may only be carried out by a qualified, licensed electrician under national rules. ABB installation instructions also state explicitly that the accessories may only be installed by a person with electrical qualifications. A layperson should not connect sockets or switches, nor replace old accessories, even when it is a straight like-for-like swap.
What you can do yourself is anything not involving live parts: prepare a floor plan with the socket layout, mark furniture positions on the walls, choose the design range of accessories and check the finished outlets against the list above.
Frequently asked questions
For a new socket, you pay for the first-fix outlet at €6.80 per piece and the second fix at €11.00 per piece. Chasing, making good the walls and the accessory itself with its frame are charged separately.
First fix means setting the back box and running the cable before plastering. Second fix means connecting and fitting the socket or switch with its frame once the walls are finished and painted.
The first-fix outlet costs €12.00 per piece and the second fix €50.00 per piece. On top of that come the cable, the socket module and, for data, the termination at the central point.
The rules do not set a fixed height for rooms, they mainly cover installation zones for cables. Above a kitchen worktop, sockets go in the middle zone, up to a height of 1150 mm. In bathrooms, the distances from the bath and shower apply. Otherwise the height is set according to the furniture and agreed with the electrician.
According to a university teaching text on domestic electrical installations, no more than 10, protected at 16 A. Appliances of 2 kW or more, such as a washing machine, dishwasher or water heater, should have their own circuit.
Category 5E or 6 UTP is recommended, run from the central point to each data point, at least 30 cm away from 230 V cables. Conduit allows the cable to be replaced later without cutting into the wall.
No. Even replacing an accessory is work on an electrical installation, and under national rules it may only be done by a qualified, licensed electrician.
For a new electrical installation or an extension to one, an inspection and testing is carried out before it is put into service, after which the inspector issues an inspection report.
Related work
How shielded FTP data cabling is installed in a flat, house or office, which cable category to choose and how to check the finished network.
How to fill cable chases and back box openings after rewiring, which filler to choose, common mistakes and how to check the wall before painting.
How a bathroom or WC extractor fan is installed and wired, which type to choose, what to watch out for and how to check the finished job.
How downlights are fitted into plasterboard ceilings: cutting the hole, wiring, choosing the fitting, typical mistakes and how to check the work.
How a pendant light or chandelier is installed, how to fix it safely to different ceilings, how high to hang it and how to check the finished job.
How an electrician fits a wall light, what makes the job harder, what to watch for in bathrooms and outdoors, and how to check the finished work.