Building work price list: Electric hob installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
Why a hob is connected at 400 V
A hob is one of the most powerful appliances in the home. A four-zone induction hob described in one manufacturer's manual, for example, draws 7 kW. A single phase with a 16 A breaker can carry only about 3.7 kW, so manufacturers connect hobs across several phases and spread the load. Bosch states plainly on its support pages that hobs are connected to a three-phase supply.
Common design principles for domestic installations also give appliances rated at 2 kW or more a dedicated circuit, and an electric cooker a three-phase circuit. That is why a separate cable runs from the distribution board to the kitchen and serves the hob alone. The oven usually has its own 230 V circuit.
What needs deciding before connection
Which wiring option the hob will use
On the underside of the hob there is a terminal block with a wiring diagram next to it. Manufacturers list several options in their manuals, and the hob is adapted using jumpers between the terminals. For one induction hob, Gorenje gives the following:
- three-phase connection is the factory setting, with 16 A protection on each phase,
- two-phase connection (380 to 415 V between phases) with a jumper between terminals 4 and 5, protection by at least two 16 A fuses, conductors of at least 1.5 mm²,
- single-phase connection at 230 V with jumpers between terminals 1 and 2 and between 4 and 5, protection of at least 32 A and conductors of at least 4 mm².
Terminal numbers and jumpers differ between manufacturers. What counts is always the diagram on the specific hob and its rating plate, not experience with another model.
Is there a 400 V supply in the home
For a three-phase connection, a five-core cable runs to the kitchen: three phases, neutral and protective earth. A copper cable with a 2.5 mm² cross-section, for example 5x2.5 mm², with a three-pole 16 A breaker is a standard choice for a cooker up to 10 kW according to tables for domestic installations. In older prefabricated blocks of flats, however, there is often no three-phase supply to the flat. On forums the same story keeps coming up: the owner had a five-core cable run to the kitchen and only then discovered that just one phase reaches the flat. Without a three-phase supply, that cable is of no use. The main breaker and the incoming supply belong to the network operator, and any change to them has to be arranged with the operator.
Single-phase hob and power limiting
If there is no 400 V in the home, you can buy a hob designed for 230 V or one that permits single-phase connection. Manufacturers allow the maximum power to be reduced in the settings if the breaker is smaller than recommended. The hob then works, but cuts back power when several zones are on at once. On forums, people with this setup say they have no problems; they simply avoid running the oven and all the zones at the same time.
Oven on a plug or hardwired
A built-in oven runs at 230 V. Its rating is typically around 3.5 kW. An oven with a cable and plug goes into a socket that must remain accessible after installation. An oven without a plug is connected to fixed wiring, which must include a means of disconnection. Whether the oven gets its own breaker and what kind of socket is decided by the electrician, based on the rating plate and the condition of the wiring.
Who may connect a hob
Connecting a hob means working on electrical equipment at 230 and 400 V. Under national rules, only a qualified, licensed electrician with the required experience may carry out such work independently. A person without electrical training may only assist under supervision. The work must be done by an authorised person, and an amateur should not touch the hob's terminal block or the distribution board.
Manufacturers say the same. Gorenje states that the appliance may only be connected by an authorised specialist, and other manuals refer to a qualified electrician. The warranty is also at stake. In its warranty terms, Beko states that connection is a service paid for by the customer, that proof of it should be kept, and that a claim may be rejected if a 400 V appliance was not commissioned by a professional company.
How the job is done step by step
- Checking the rating plate and manual: the electrician confirms the power rating, the permitted wiring options and the recommended protection.
- Checking the supply: at the distribution board, the electrician establishes which breaker protects the kitchen, how many phases are available and whether the cable cross-section is right.
- Isolating and proving dead: the circuit is switched off at the distribution board and a tester confirms that the conductors are not live.
- Means of disconnection: the fixed wiring must contain a device that disconnects the hob on all poles with a contact gap of at least 3 mm. As a rule, this is the breaker in the distribution board.
- Setting the jumpers: on the hob's terminal block, jumpers are fitted or removed according to the diagram for the chosen option.
- Connecting the conductors: phases, neutral and earth go to the correct terminals. According to the manuals, the green and yellow earth conductor is connected first and left slightly longer than the others. The cable is secured in the strain relief clamp.
- Fitting the hob: the cable is routed so that it is not trapped or kinked and does not touch hot parts of the oven. One manual states that the cable temperature must not exceed 75 °C at any point.
- Connecting the oven: if the oven is part of the job, it is plugged in or hardwired to its circuit.
- Testing and setup: the breaker is switched on, all zones are tested and, on hobs with power limiting, the limit is set to match the protection.
Cutting the opening in the worktop and fitting the appliances into the units is a separate job, covered under fitting appliances into kitchen units.
What drives the price
The guide price for connection in our list is €55.00 per piece where the supply is already in place. The final figure depends mainly on the following:
- hob alone, or hob with oven: connecting both appliances in a single visit works out better than two separate call-outs,
- supply in place: if there is no cable from the distribution board to the kitchen, a new one has to be run, plus chasing the walls and making good,
- work in the distribution board: adding a three-pole breaker or rebuilding the whole board are separate items, see connecting breakers and an RCD,
- hob without a cable: some hobs are sold without a supply cable, so the electrician has to provide and fit one,
- switching to another option: changing the jumpers and setting the power limit for single-phase connection,
- travel and time: on a separate call-out for a single hob, travel makes up a larger share of the cost.
During a complete kitchen refurbishment, connecting the hob and oven is handled together with the other work; for an overview see electrical installation work.
What should be ready
- the hob is fitted or ready to fit and the cut-out in the worktop has been made,
- a cable for the hob runs from the distribution board to the kitchen and it is clear which breaker switches it off,
- the clearance under the hob matches the manual. If there is an oven underneath, according to one manual it must have a cooling fan. If there is a drawer underneath, a protective divider is fitted above it,
- the manuals for the hob and the oven are to hand and the rating plates are legible,
- there is clear access to the distribution board.
Typical mistakes and how they show up later
Forgotten or wrongly fitted jumpers
The hob is often set at the factory for a different option from the one in your home. If the jumpers are not adjusted according to the diagram, some zones will not work or the electronics may be damaged.
Five conductors in the wall, one phase at the board
The cable is ready for 400 V, but only one phase reaches the flat. The hob then has to be connected single-phase and an undersized breaker trips during normal cooking.
Small breaker without a power limit
If the breaker is smaller than the manufacturer recommends, the hob's maximum power must be reduced. Otherwise the breaker trips when several zones are switched on or when the boost function is used.
Joined or shared neutral
On forums there are cases where an induction hob trips the RCD on another circuit. Electricians there recommend first checking whether neutral and earth are joined somewhere, or whether a neutral has been shared between several circuits.
Cable pressed against the oven
A supply cable trapped between the hob and the unit, or resting against a hot oven, will be damaged over time. The cable should have its own route and its own clip.
Connection without proof
If the hob fails and there is no record of professional connection, the manufacturer may reject the warranty claim.
How to check the finished job
- all zones switch on and heat, even when running together on a higher setting,
- the breaker in the distribution board does not trip during normal cooking or when the oven is switched on,
- the hob's breaker is labelled in the distribution board,
- the hob sits level, the cable is not trapped underneath it and does not touch the oven,
- with a single-phase connection, the electrician has shown you the power limit that was set,
- you have confirmation of the connection with the company stamp or details, or an entry in the warranty card.
With new or reworked electrics in the kitchen, the job should finish with an electrical inspection report.
For DIYers: what you can and cannot do yourself
Connecting a 400 V hob or hardwiring an oven is not a DIY job. Under national rules, it may only be done by an authorised person with an electrical qualification. A mistake with the jumpers or mixed-up conductors can destroy the hob and put people at risk. What you can prepare yourself is everything that has nothing to do with electricity: check the dimensions of the cut-out, have the manuals and rating plates ready, find out how many phases reach your home and clear access to the distribution board.
Frequently asked questions
The guide price in our list is €55.00 per piece with the supply and breaker already in place. Connecting the hob and oven together costs €50.00 per piece. A new cable from the distribution board or work on the board is charged separately.
No. Under national rules, work on electrical installations may only be done by an authorised person, and manufacturers require connection by a professional. If you connect it yourself, you also risk losing the warranty.
Yes, if the manufacturer permits it. For single-phase connection, Gorenje for example specifies protection of at least 32 A and conductors of at least 4 mm². With a smaller breaker, the hob's maximum power is reduced, and the zones then cannot all run at full power at once.
For a three-phase connection, a copper five-core cable with a 2.5 mm² cross-section and a 3x16 A breaker are commonly used. The exact values are set by the hob's rating plate and manual; for a two-phase connection, Gorenje specifies two 16 A fuses and conductors of at least 1.5 mm².
Appliances rated at 2 kW or more get a dedicated circuit. The hob has its own three-phase circuit and the oven usually has its own 230 V circuit.
Then you choose a hob that permits single-phase connection and set a power limit on it. Upgrading the supply to three phases or fitting a larger main breaker has to be arranged with the network operator.
You may. In their warranty terms, manufacturers state that for 400 V appliances they can reject a claim if the appliance was not connected by a professional company. Keep the proof of connection with your warranty card.
Usually not. The kitchen fitter sets the hob into the worktop, and the electrical connection is done by an electrician. When ordering kitchen fitting, it pays to agree in advance who will handle the connection.
Related work
How shielded FTP data cabling is installed in a flat, house or office, which cable category to choose and how to check the finished network.
How to fill cable chases and back box openings after rewiring, which filler to choose, common mistakes and how to check the wall before painting.
How a bathroom or WC extractor fan is installed and wired, which type to choose, what to watch out for and how to check the finished job.
How downlights are fitted into plasterboard ceilings: cutting the hole, wiring, choosing the fitting, typical mistakes and how to check the work.
How a pendant light or chandelier is installed, how to fix it safely to different ceilings, how high to hang it and how to check the finished job.
How an electrician fits a wall light, what makes the job harder, what to watch for in bathrooms and outdoors, and how to check the finished work.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.