Fitting coving: steps, mistakes, cost

Coving hides the corner between wall and ceiling, which is often crooked, cracked or unevenly painted. It also gives a room a finished look, from a slim plain profile in a new build to an ornate cornice in an old period flat. The lengths are glued in place, the corners are mitred, the joints are filled and the whole lot is painted.

Updated 11/2026·8 min read·4 price list items
Standard labour price
€5.50/ lm
Indicative range
€4.40 - €7.15
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Fitting coving: steps, mistakes, cost

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Carpentry and joinery4 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Mouldings and cladding cost

Install ceiling corniceslm€5.50 / lmlmenter quantity-
Remove old mouldingslm€1.50 / lmlmenter quantity-
Install skirting boardslm€6.50 / lmlmenter quantity-
Timber wall claddingm²€28.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

Why and when coving is fitted

  • crooked corner: in older flats and houses the line where wall meets ceiling is rarely straight, and when the two are painted in different colours the edge looks ragged. Coving covers it,
  • hairline cracks in the corner: especially where plasterboard meets masonry or concrete. Coving hides them, provided it is fixed properly,
  • appearance: a cornice at ceiling level is typical of older properties, while modern interiors tend to use simple plain profiles,
  • indirect lighting: some profiles are shaped to conceal an LED strip that washes light onto the ceiling,
  • finishing a suspended ceiling: after installing a plasterboard ceiling or cladding the ceiling, coving covers the junction with the wall.

Coving goes up after skimming and before the final decoration, because it is painted together with the wall or ceiling. When replacing old coving, the old lengths are first carefully cut or peeled away, the adhesive residue is scraped off and the strip along the ceiling is made good. Only then is the new coving fixed.

What to decide before work starts

Coving material

  • polystyrene: the cheapest and lightest option. It is glued without mechanical fixings and cut with a knife or a fine saw. Softer polystyrene dents easily, so it suits the ceiling line rather than places within reach. It reacts with some solvent-based paints and adhesives and dissolves,
  • high-density polystyrene and polyurethane: harder, with crisper detail and a smoother surface. Manufacturers often supply them with a white primer coat. They tend to cost more. Flexible versions are available for curved walls,
  • plaster: traditional cornices in period properties. They are heavy, fitting is more demanding and it is usually a job for a plasterer,
  • timber and MDF: mainly with timber ceilings and panelling. They are fixed with adhesive plus nails or screws.

Profile size and shape

In a low room a bulky cornice looks heavy, while in a tall period flat a slim coving gets lost. Choose the profile to suit the ceiling height and the style of the room. For LED coving, decide in advance where the supply to the driver will run and how it can be reached later.

Adhesive

The adhesive must be intended for the material in question. Polystyrene needs solvent-free adhesives that will not attack it. The polyurethane moulding manufacturer Orac Decor distinguishes in its instructions between adhesive for the contact faces, adhesive for the joints and a stronger adhesive for heavy profiles and non-absorbent surfaces.

Follow the ceiling or follow the spirit level

In older houses the ceiling is often not level. If the coving follows the ceiling, there are no gaps along the top, but you can see on the wall that the bottom edge does not run straight. If it follows a spirit level, gaps open up along the ceiling that need filling. A compromise is usually chosen, and it is best to agree on it with the tradesperson before any gluing starts.

Who buys the materials

Coving is sold in lengths, usually of 2 metres. It is worth agreeing whether the carpenter or you will buy it, and allowing extra for mitres and offcuts.

When coving is not the answer

A badly uneven ceiling

Coving follows whatever it is glued to. With large irregularities, wedge-shaped gaps open between the coving and the ceiling, which have to be filled and remain visible. In that case it is better to skim the ceiling first, at least along a strip next to the wall.

A damp corner and mould

If moisture or mould keeps appearing in the corner at ceiling level, coving will only cover it up and it will continue to grow underneath. Deal with the cause first, that is ventilation or a cold corner.

A neat corner between plasterboard and wall

If you do not want coving for aesthetic reasons, the corner can be finished without it. Flexible acrylic sealant used when sealing corners with acrylic copes with small movements and is almost invisible once painted.

How the work is done, step by step

  1. Acclimatisation: the coving and adhesive should be in the room for at least 24 hours before fitting. Orac Decor specifies a temperature of at least 5 °C and relative humidity of 40 to 70 per cent.
  2. Surface preparation: the wall and ceiling along the coving line must be flat, dry and free of dust and grease. Flaking paint is scraped off and absorbent surfaces are primed.
  3. Setting out: the bottom edge of the coving is marked on the wall. With a crooked ceiling, a decision is made whether the coving follows the ceiling or runs level by spirit level.
  4. Cutting corners: internal and external corners are mitred in a mitre box. Corners in older houses are rarely exactly 90 degrees, so the angle is measured and the cut adjusted.
  5. Gluing: adhesive is applied to the contact faces of the coving. The length is pressed in along its whole run and excess adhesive is wiped off at once.
  6. Joints: the ends of each length at joints and mitres are fully coated with adhesive and pushed together so that adhesive squeezes out along the entire joint. This determines whether the joint cracks later.
  7. Filling: once dry, joints and gaps along the wall and ceiling are filled or sealed with acrylic.
  8. Painting: the coving is painted together with the ceiling or wall. Polystyrene needs water-based paint.

What affects the price

The indicative labour price in the price list is €5.50 per linear metre. The final figure depends mainly on the following:

  • number of corners: a room with alcoves, piers and a chimney breast has many mitres, and each corner is a separate piece of precise work,
  • flatness of walls and ceiling: a crooked corner needs more filling, and sometimes the strip of wall has to be levelled before gluing,
  • material and profile size: wide, heavy cornices take longer to fix and sometimes need mechanical fixings too,
  • room height: tall period rooms need a scaffold tower or a longer ladder,
  • removing old coving: taking down old polystyrene coving with its adhesive and repairing the surface is extra work,
  • LED coving: profiles with concealed lighting add the cost of fitting the LED strip and driver,
  • painting: usually not included in the fitting price and charged as decorating work.

In practice, painting and possibly fitting an LED strip behind the coving are added to the fitting cost. You can work out the cost of decorating the whole room in the decorating price list.

What should be ready beforehand

  • walls and ceiling are skimmed and dry, and the strip along the ceiling is straight,
  • the coving and adhesive have been in the room for at least a day before fitting,
  • it has been agreed whether the coving follows the ceiling or runs level, and where the joints will be,
  • furniture has been moved away from the walls so a ladder can be moved around freely,
  • for LED coving, the power supply and a place for the driver are ready.

Common mistakes and how they show up later

Joints without adhesive

The lengths are simply butted together and the gap is filled. After a few months, often once the heating first comes on, a crack appears at the joint. That is why manufacturers explicitly require adhesive across the full end faces of the joint.

Fitting without acclimatisation

Coving brought in from a cold van will still expand or shrink in a warm room. The joints then open up.

Solvent-based adhesive or paint on polystyrene

The coving is attacked by the adhesive or paint, softens and distorts. Use products intended for polystyrene.

Gluing to a dusty or flaking surface

The coving is stuck to the paint, not to the wall. At the first movement it comes away along with the old paint.

Mitres cut without measuring the angle

A 45 degree cut in a corner that is not 90 degrees leaves a gap that no filler will hide neatly.

Coving fitted just before the wall is painted a different colour

If the wall is to be coloured and the ceiling white, the colour line has to be planned. The coving is usually painted like the ceiling and the wall colour stops below its bottom edge. If this is not agreed in advance, the decorator ends up cutting in by hand and the result is often uneven.

Coving merely covering a live crack

Where plasterboard meets masonry, the structures move. If coving is fixed rigidly to both wall and ceiling here, the crack can transfer into the coving joint or the acrylic around it. In such corners it is important to deal with the cause first, for example a plasterboard joint that was never reinforced.

How to check the finished work

  • sight along the coving from the side, parallel to the wall: it should not be wavy or jump up and down,
  • joints and corners show no visible gaps or offsets in the profile,
  • there are no dark gaps between the coving and the wall or ceiling, they have been filled,
  • there is no adhesive residue on the wall or ceiling,
  • after painting, the coving has an even finish with no runs,
  • after the first heating season, no cracks have appeared at the joints.

DIY guide: what to watch out for

A handy amateur can manage polystyrene coving in a smaller room. With heavy cornices, high ceilings and many corners, it is better to call in a tradesperson. For a DIYer, the key points are:

  1. Leave the coving and adhesive in the room for a day.
  2. Prepare a sound, clean and dry surface.
  3. Buy a mitre box and measure the actual corner angle before cutting. Start with the corners and fill in the straight lengths afterwards.
  4. Use adhesive intended for the coving material and glue the joint ends as well.
  5. Wipe off excess adhesive immediately while it is still soft.
  6. Fill the joints and paint the coving with a paint suitable for the material.

When working on a ladder, have a second person nearby to pass up and hold the long lengths.

Frequently asked questions

The indicative labour price in the price list is €5.50 per linear metre, excluding materials. Rooms with many corners, crooked walls and high ceilings cost more. Painting the coving is charged separately.