Building work price list: Connecting to a Cast Iron Soil Stack
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Plumbing works cost | ||||
| Connect pipework to cast iron waste stack | pcs | €55.00 / pcs | pcs | enter quantity- |
| Installation of wall-hung WC duct frame | pcs | pcs | - | |
| Install and fit access panels | pcs | €45.00 / pcs | pcs | enter quantity- |
| Installation of concealed WC frame | pcs | €120.00 / pcs | pcs | enter quantity- |
| Install and brick-up bath | pcs | €90.00 / pcs | pcs | enter quantity- |
| Install ceramic basin | pcs | €50.00 / pcs | pcs | enter quantity- |
| Shower tray installation | pcs | €130.00 / pcs | pcs | enter quantity- |
| Install shower enclosure glass (screen) | pcs | pcs | - | |
| Installation of shower enclosure | pc | €150.00 / pc | pc | enter quantity- |
| Install deck-mounted tap | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install wall-mounted bath/shower mixer | pcs | €65.00 / pcs | pcs | enter quantity- |
| Install concealed shower valve body (iBox) | pcs | pcs | - | |
| Install concealed mixer tap | pcs | pcs | - | |
| Cold and hot water outlet point | pcs | €35.00 / pcs | pcs | enter quantity- |
| Internal waste and drainage outlet point | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install washing machine/dishwasher valve and trap | pcs | pcs | - | |
| Hang and connect electric water heater up to 120 l | pcs | €104.35 / pcs | pcs | enter quantity- |
| Install whole-house water filter | pcs | €55.00 / pcs | pcs | enter quantity- |
| Installation of domestic sewage treatment plant / septic tank on gravel bed | pc | €600.00 / pc | pc | enter quantity- |
| Hot water circulation pipework | lm | lm | - | |
| Pressure test internal water supply pipework | hr | hr | - | |
| Chase cutting for plumbing (concrete) | lm | €29.00 / lm | lm | enter quantity- |
| Make good walls after plumbing | lm | €8.50 / lm | lm | enter quantity- |
| Install and chase in concealed valve body | pcs | €95.00 / pcs | pcs | enter quantity- |
| Install shower channel + screed in | pcs | pcs | - | |
| Install stopcocks / isolation valves | pcs | €13.00 / pcs | pcs | enter quantity- |
| Install valve for dryer/washer + waste | pcs | €55.00 / pcs | pcs | enter quantity- |
What connecting to a soil stack means and when it is needed
Connecting to a cast iron soil stack means joining new plastic waste pipework to the original vertical cast iron pipe. In many older blocks of flats and houses, this pipe still carries waste from every floor. The job usually comes up during a bathroom or WC refurbishment, when sanitaryware is moved, when a washing machine or dishwasher is added, or when a damaged section of old pipework is replaced. The aim is always the same: a tight joint that does not smell, and waste that drains without gurgling.
The connection is usually one step in a wider refurbishment and part of general plumbing work. It is done early, while the walls are still open and before tiling or boxing-in is finished. Typical situations include:
- Bathroom or WC refurbishment in a block of flats or an older brick house: old cast iron or steel waste pipes inside the flat are replaced with plastic, and the new run has to be connected to the existing stack.
- Moving a WC, bath, shower or basin: both the height and the direction of the connection change.
- Adding a washing machine or dishwasher: the original pipework has no branch prepared for it.
- Repairing a leaking or cracked joint: the joint smells or water seeps from it.
What to clarify before booking a plumber
Having these points settled in advance saves a second visit and avoids unpleasant surprises once the pipework is covered.
- Where the sanitaryware will go: the position of the WC, basin, bath and washing machine determines where and at what height the branch on the stack must be. Horizontal pipework needs a fall towards the stack, so the further away a fitting is, the higher its waste must start. With a distant WC or a level-access shower, this can decide whether the layout is possible at all. Where waste pipes are to be buried in a concrete wall, chasing channels in concrete needs to be planned at the same time.
- What the stack is made of: not every grey pipe is cast iron. Asbestos cement follows entirely different rules, as explained in the next section.
- What diameter is being connected: soil stacks in blocks of flats usually have an internal diameter of around 100 mm and are continued with 110 mm plastic soil pipe. Wastes from basins, baths, showers and washing machines are smaller, commonly 32 to 50 mm. The reducer and adaptor are chosen accordingly.
- Whether the stack will be boxed in: if it will sit behind tiles or a false wall, decide now where the access panel will go.
- Who supplies the materials: adaptors and fittings are chosen according to the actual condition of the pipe. It is usually simpler if the plumber brings them after the survey.
The stack belongs to the whole building: agreement with the managing agent and the asbestos risk
In a block of flats, the soil stack is usually part of the common parts of the building, not part of your flat. Work on it normally needs consent from the freeholder, managing agent or residents' management company, so contact them before booking a plumber. Get the consent confirmed in writing - an email is enough. The managing agent can also agree a date, notify neighbours and may have their own requirements for materials or contractors.
If the refurbishment involves more than just the connection, for example rerouting the whole drainage run or changing the layout of the bathroom, contact local authority building control. Describe the scope of work and ask whether it needs to be notified or requires anything else from you. Get this answer confirmed in writing too.
An important note on materials: in some blocks of flats the stack is not cast iron but asbestos cement. It is grey, lighter and sounds different when tapped. Cast iron is darker, very heavy, rings metallically when tapped, and a magnet will stick to it. Do not cut or drill an asbestos cement pipe. Work involving asbestos should only be carried out by a specialist asbestos contractor. If in doubt, have the material assessed during the survey before any cutting. In homes built before 2000, have suspect materials tested before you drill or demolish.
How the connection is done step by step
Plastic cannot be joined "rigidly" to cast iron. After decades in use, cast iron has a rough, often uneven surface, and its dimensions do not exactly match plastic pipe. The joint is therefore always sealed with a flexible adaptor. A plumber typically works in this order:
- Survey: the plumber inspects the stack, checks its diameter and condition, and confirms there is reasonable access to the connection point. The old joints above and below the cut are also checked, and it is confirmed that the pipe is not asbestos cement.
- Scheduling: a time is agreed during which residents above do not run water into the waste.
- Preparing the area: the floor is covered and a container and rags are placed under the cut. Water and debris may remain in the stack, and something always runs out when it is cut.
- Supporting the stack: the stack is secured with clamps above and below the cut so the heavy cast iron does not drop or shift once cut. Without this, old joints on floors above and below can work loose.
- Cutting: the pipe is cut through, or the required section is cut out. The gentlest method is a cast iron chain cutter, which squeezes the pipe with a chain of cutting wheels and snaps it without sparks and with almost no dust. The cut is also square and clean. If an angle grinder with a metal-cutting disc is used, sparks and dust are produced, so the fitter wears safety glasses, a respirator and gloves and removes anything flammable from the area. The edges are then carefully cleaned so no sharp burrs or rust remain.
- Fitting the adaptor: an adaptor or rubber coupling is fitted, or a new plastic branch is inserted between the two cut ends of the cast iron. The branch with its couplings must fill the cut gap exactly, otherwise the upper section of cast iron may drop over time. When connecting into an original cast iron socket, the old sealing material is removed first.
- Connection and testing: the new pipework is connected at the correct fall and fixed in place, and tightness is tested with a real flow of water, ideally also after the building's waste system is back in normal use.
Why does the order matter? Without a survey, the fitter does not know which adaptor to bring. A rough cut stops the coupling seating all the way round. And if the test is skipped, a fault only shows up behind finished tiling.
With one fitting and good access, it is usually a single visit of a few hours. If the cut reveals that the cast iron is in poor condition and a longer section must be replaced, the job takes longer. The exact scope can only be reliably determined after a survey.
Coupling, reducer or new branch: what to choose and when
The specific component depends on what needs solving: a different material, a different diameter, or a new connection into a continuous stack.
- Rubber coupling (cast iron to plastic adaptor): conforms to the uneven surface of cast iron and seals the joint where the diameters roughly match. It is the most common solution in flats.
- Reducer: used when a smaller waste from a basin or washing machine joins a larger pipe. Often combined with a rubber coupling.
- New plastic branch inserted into the stack: suitable when a new fitting needs connecting and the cast iron is in good condition. A short section is cut out and replaced with a fitting with couplings at both ends. This is typical when a new WC is fitted on a concealed cistern frame.
- Strap-on boss (saddle connector): allows a connection without cutting out a section, but on old cast iron it is a questionable solution. The seal needs a smooth, even surface, which corroded cast iron does not have, so the joint can easily leak or smell. Manufacturers often do not recommend strap-on bosses for cast iron. Inserting a new plastic branch is more reliable.
It is also worth thinking about accessories. An access fitting (rodding eye) and an access panel in the tiling allow the stack to be inspected or cleared later without breaking anything out. Odours from the stack are kept out by the water seal in the trap, so the washing machine and dishwasher must also be connected through a trap. If the water is siphoned out of traps when the WC is flushed, for example with a long branch or a poorly vented stack, an air admittance valve helps. A non-return valve serves a different purpose: it stops waste water flowing back into the appliance.
Cost of connecting to a cast iron soil stack: what it depends on
The guide labour price is €55.00 per piece, meaning per connection. It applies to a standard situation: the stack is accessible, the cast iron is in reasonable condition and one pipe is being connected. The final figure is then affected by these factors:
- Access to the stack: an exposed pipe in a duct with an access door is the cheapest case. If it is built into masonry or sits behind tiles, opening up and later making good are added, and there is considerably more work. Breaking out and making good are usually charged as separate items.
- Condition of the cast iron: a sound pipe cuts quickly and a coupling seats well on it. Sometimes, though, the cut reveals that the pipe is narrowed inside by deposits, rusted through or cracked. A longer section then has to be cut out, more cleaning is needed and an extra adaptor is often required, which noticeably increases the price.
- Type of connection: pushing into an existing socket with a new coupling is simpler than inserting a new branch, which involves two cuts and two transitions.
- Diameter: connecting a WC at full stack diameter is more demanding than a small basin waste. Heavier cast iron and larger fittings mean more work on supporting the stack.
- Number of connections: one fitting is a different job from a whole bathroom with WC, bath and basin. Each additional connection is charged separately. If they are done together, however, repeated preparation and scheduling are avoided, so it works out better value than several separate visits.
- Materials: couplings, reducers, branches, access fittings and clamps are usually charged on top of labour. Better-quality adaptors and access panels increase the price but save problems later.
- Timing and urgency: an emergency call-out for a leak, at the weekend or in the evening, is generally more expensive than a pre-planned installation.
When comparing quotes, ask whether the price includes the survey, materials, supporting the stack, a leak test and removal of the cut-out cast iron. As a householder you have a duty of care for your waste, so before you hand over the old pipe and rubble, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
How to prepare the flat so the work goes smoothly
Apart from the condition of the pipe, much depends on how well the area is prepared. The job is easier when:
- The area around the stack is cleared, cabinets, the washing machine and anything stored in the duct are moved out, and the pipe can be reached from both sides.
- The positions of the sanitaryware are decided in advance, so the plumber does not have to change the route mid-job - including fittings such as a concealed shower valve (iBox), whose waste and position affect the layout.
- You are at home or reachable by phone during the work, in case a decision is needed on a longer section or a different fitting.
- All connections in the flat are done at once while the walls are open.
The job takes longer when someone upstairs flushes during the cut, when fitting positions change on site, or when the fitter first has to clear and cover the area.
Typical mistakes that only show up later
Most of these mistakes are not visible straight after installation. They appear after weeks or months, often behind finished tiling. The most common are:
- The joint is sealed with silicone or tape instead of a proper adaptor, and after a while it starts to leak and smell.
- The cut edges are left rough and the coupling does not seat all the way round.
- The horizontal pipe does not have the correct fall. For 110 mm pipe, for example from a WC, a fall of around 2 % - 2 cm per metre of length - is commonly designed, with 1 % taken as the minimum. For smaller wastes from basins, baths or washing machines, around 2 to 3 % is commonly quoted. With too little fall, the waste gurgles, drains slowly and silts up.
- The fall is unnecessarily steep. With a WC, water then runs away faster than solids, which stay in the pipe and cause blockages. In practice, around 5 % is usually given as the upper limit for horizontal runs.
- The route has too many bends or is too long, which increases the risk of blockages, especially with a WC.
- New pipe is connected to rusted cast iron, which soon cracks next to the new joint.
- The stack is not supported above and below the cut, and old joints on other floors work loose during the job.
- The inserted branch is shorter than the cut gap, and the cast iron above gradually drops.
- A strap-on boss is fitted to corroded cast iron and leaks after a while.
- The plastic pipe is not secured with clips and moves when water flows, gradually loosening the joint.
- The joint disappears behind tiling with no access point, and the first blockage or leak means breaking out.
Symptoms depend on the fault. A leaking coupling usually shows first as a smell, and only later as a damp patch on the wall or in the flat below. Poor fall shows as slow drainage and gurgling in the trap. Unsecured pipework can often be heard knocking when the WC is flushed.
If the cast iron is in poor condition, it is better in the long run to replace the whole section, or to agree with the managing agent on replacing the stack throughout the building, than to keep returning to one joint.
How to check the finished connection
Before the pipework is covered with tiling or boxing-in, go through these points with the plumber:
- The cast iron to plastic joint stays dry even after running water for a longer time.
- Nothing drips or escapes when the WC is flushed and a full bath or basin is emptied.
- The waste drains smoothly, without gurgling and without water rising in other fittings.
- After flushing the WC, water remains in the basin and bath traps and is not siphoned out.
- There is no drain smell around the joint.
- The new pipe is secured with clips and does not move.
- Horizontal runs have a visible fall towards the stack.
- Access to the joint remains through an access fitting or panel.
- The cast iron above and below the joint has not been loosened or damaged by the work.
It is a good idea to photograph the joint before it is covered. A photo showing the position of the branch and the access point helps with future repairs and when selling the flat.
Frequently asked questions
For one connection, the guide price is €55.00 per piece. The final figure can rise if the stack is built in, the cast iron is in poor condition, a new branch is inserted, or it is an emergency call-out outside normal hours.
Yes, but always through a rubber coupling or adaptor designed for joining cast iron to plastic. Simply pushing it in or sealing it with mastic usually leaks after a while.
A competent DIYer can connect a washing machine trap to a waste that is already prepared. Cutting into a cast iron soil stack, however, means working on drainage shared by the whole building and requires the pipe to be supported, so it should be left to a plumber.
For one connection with good access, usually a few hours. If the cut reveals that the cast iron is in poor condition and a longer section has to be replaced, it can take longer. That is why the date is agreed in advance.
Most often the coupling does not seal all the way round, a trap is missing, or water is siphoned out of the trap when the WC is flushed and the water seal is lost. Checking how the adaptor is seated, adding a trap and, where siphoning occurs, fitting an air admittance valve will help.
On old cast iron, generally not. Its seal needs a smooth, even surface, which a corroded pipe does not have. It is more reliable to cut out a short section and insert a new plastic branch with couplings.
When the cast iron is rusted through, cracking, repeatedly leaking or heavily furred up inside. Replacing the stack affects several flats, so it is handled by the freeholder, managing agent or residents' management company.
Related work
How channels for water pipes are cut into concrete, when to use a wall chaser, what to watch for in concrete blocks of flats and how to check the work.
How a concealed cistern frame or valve body is set into a wall, what to watch when chasing it in, and how to check the work before tiling.
How a concealed shower valve body (iBox) is installed, what makes the job harder, the mistakes to avoid and how to check the finished work.
How access panels are fitted into masonry, concrete, plasterboard and riser boxing. Choosing type and size, installation steps, typical mistakes and checks.
How a shower channel is set into the floor, connected to the waste, bedded in screed and waterproofed, and how to check the finished work.
How a glass shower screen or bath screen is fitted, screen versus shower enclosure, choosing glass and doors, common mistakes and checks at handover.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.