Shower enclosure installation: fitting a complete enclosure with tray

Fitting a shower enclosure means setting the tray, connecting it to the waste, fixing the wall profiles, glass panels and door, and sealing everything. It costs roughly €150.00 per piece, depending mainly on the type of enclosure, removal of the old shower and the waste.

Updated 11/2026·13 min read·27 price list items
Standard labour price
€150.00/ pc
Indicative range
€120.00 - €195.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Shower enclosure installation: fitting a complete enclosure with tray

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Plumbing27 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Plumbing works cost

Installation of shower enclosurepc€150.00 / pcpcenter quantity-
Installation of wall-hung WC duct framepcspcs-
Install and fit access panelspcs€45.00 / pcspcsenter quantity-
Installation of concealed WC framepcs€120.00 / pcspcsenter quantity-
Install and brick-up bathpcs€90.00 / pcspcsenter quantity-
Install ceramic basinpcs€50.00 / pcspcsenter quantity-
Shower tray installationpcs€130.00 / pcspcsenter quantity-
Install shower enclosure glass (screen)pcspcs-
Install deck-mounted tappcs€35.00 / pcspcsenter quantity-
Install wall-mounted bath/shower mixerpcs€65.00 / pcspcsenter quantity-
Install concealed shower valve body (iBox)pcspcs-
Install concealed mixer tappcspcs-
Cold and hot water outlet pointpcs€35.00 / pcspcsenter quantity-
Internal waste and drainage outlet pointpcs€25.00 / pcspcsenter quantity-
Install washing machine/dishwasher valve and trappcspcs-
Hang and connect electric water heater up to 120 lpcs€104.35 / pcspcsenter quantity-
Install whole-house water filterpcs€55.00 / pcspcsenter quantity-
Installation of domestic sewage treatment plant / septic tank on gravel bedpc€600.00 / pcpcenter quantity-
Hot water circulation pipeworklmlm-
Pressure test internal water supply pipeworkhrhr-
Chase cutting for plumbing (concrete)lm€29.00 / lmlmenter quantity-
Make good walls after plumbinglm€8.50 / lmlmenter quantity-
Install and chase in concealed valve bodypcs€95.00 / pcspcsenter quantity-
Install shower channel + screed inpcspcs-
Install stopcocks / isolation valvespcs€13.00 / pcspcsenter quantity-
Install valve for dryer/washer + wastepcs€55.00 / pcspcsenter quantity-
Connect pipework to cast iron waste stackpcspcs-
Total labour
- enter quantity
Create quote from price list →

What a shower enclosure is and how it differs from a screen or a cabin

A shower enclosure is an assembly of a shower tray, wall profiles, glass panels and a door. Sometimes it is sold as one pack. Often the tray is bought separately from the glass and profiles. Fitting means assembling these parts, connecting the tray to the waste and fixing and sealing the whole unit firmly. The most common type is a corner enclosure of 800 × 800 or 900 × 900 mm. Rectangular, quadrant enclosures with curved doors and pentagonal enclosures are also available.

Fitting an enclosure differs from fitting a single glass screen in scope. With a screen, one panel or one panel with a door is installed, and the tray or bath is usually already in place. With an enclosure, the whole unit is installed, including the tray, the waste trap and two or more glass panels. A fully enclosed shower cabin with a roof, shower column or body jets is more demanding still, because it also needs a water supply and sometimes an electrical connection.

An enclosure is usually fitted during a bathroom refurbishment, or when an old bath is replaced with a shower to gain space in a small bathroom. It is also needed when an old enclosure leaks, the glass has gone cloudy and the door can no longer be adjusted.

What to decide before buying the enclosure

Many fitting problems start at the point of purchase. An enclosure that does not suit the waste position, the corner or the space in front of the shower then has to be adapted with a lot of effort.

Enclosure with a tray or without a tray

A standard shower enclosure sits on a tray. The tray can be low-profile, set almost flush with the floor tiles, or deep enough to bath a small child. A low-profile tray looks modern, but it needs the waste to run low beneath the floor, or a raised plinth. There must be space under the tray for the waste trap. Low-height shower wastes for slim trays have a fixed build height, which the manufacturer states in the technical data sheet. The waste pipe after the trap needs a fall, typically around 2 to 3 %. If the waste comes out of the wall too high, water drains poorly from a low-profile tray.

The type of tray also determines the order of work. A low-profile or recessed tray is often set before tiling, and the tiles then overlap its upstand. A waterproof sealing tape is bonded over the joint between tray and wall. A raised tray on adjustable legs is usually fitted against finished tiling, and the joint is sealed with sanitary silicone. Agree the order with the tiler before tiling starts.

With a tray on legs and a front panel, make sure the panel is removable or has an access hatch. Otherwise it will not be possible to reach the trap in case of a blockage or leak without dismantling.

An enclosure without a tray stands directly on tiles laid to fall towards a drain. This cannot be done later simply by swapping the enclosure. The fall, the drain and the tanking are built into the floor before tiling. Without a tray, the glass is usually fixed into floor channels or to the wall. This is more of a walk-in or wet room shower, which is a separate job.

When choosing a tray, look at:

  • material: an acrylic tray is lighter and warmer to the touch, a stone resin tray is stiffer and quieter,
  • the height and position of the waste outlet, so that it lines up with the existing waste,
  • an anti-slip surface, especially for children and older people,
  • whether the tray and enclosure profiles are designed for each other, ideally from the same manufacturer if bought separately.

Enclosure size

The best-selling sizes are 800 × 800 and 900 × 900 mm. An 800 × 800 enclosure feels cramped, especially for a taller person. If the bathroom allows, every extra centimetre makes a difference. With rectangular enclosures, for example 1000 × 800 or 1200 × 900 mm, the longer side is usually where the door goes.

Before buying, measure the corner in the bathroom itself, on both walls, at floor level and higher up. Walls are often not perfectly plumb and the corner may not be a true right angle. Wall profiles usually allow some adjustment, and the manufacturer states the range.

Door type and opening direction

The door type decides how much space is needed in front of the shower:

  • sliding doors take no space in front of the enclosure and suit small bathrooms,
  • hinged and pivot doors need clear space in front of the shower but are easier to clean,
  • bifold doors fold in on themselves and save space, but have more joints,
  • a quadrant enclosure with curved sliding doors takes up the least space in the corner.

Check that the door will not hit the basin, radiator or a hook when it opens. Also check that the enclosure will fit through the bathroom door and up the stairs. With a hinged door, think about the opening side. The shower controls should be within reach so that the water can be turned on without standing under a cold spray. If a new concealed shower valve with an iBox mixer is planned, its position should be fixed before tiling.

Who handles water, waste and electrics

If water pipes or the waste need to be moved, this is a job for a plumber before tiling - see the overview of plumbing work. In solid walls this often involves chasing channels for the water pipes in concrete. In a block of flats, any work on the shared soil stack must be agreed in advance with the landlord or managing agent.

A shower cabin with electrical components, such as lighting, a radio or a steam generator, must be connected only by a qualified electrician. In England and Wales, a new circuit or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. The circuit should be protected by an RCD. A bathroom is divided into zones according to distance from the shower and bath, and in each zone only fittings with adequate protection against water are allowed. The electrician will assess where the supply can go and whether the cabin's components are suitable. All new electrical work should be designed, installed and certified to BS 7671:2018+A4:2026, the current IET Wiring Regulations. The supply is prepared before tiling, so that the finished wall does not have to be cut open later.

How fitting is done step by step

Wall profiles and glass are always fitted onto finished tiling, with tanking beneath it. The tray can be fitted earlier if it is recessed under the tiles. In a full refurbishment, other first-fix work such as installing and boxing in a concealed cistern frame is also completed before tiling.

  1. Removing the old enclosure or bath: during a refurbishment the old enclosure or bath is taken out, old silicone is cut away and the condition of the waste and wall is checked.
  2. Setting the tray: the tray is placed on its legs or on a plinth and levelled with a spirit level in both directions.
  3. Connecting the waste trap: the trap is connected to the waste and the tray is filled with water. The joint is checked before the trap is covered.
  4. Sealing the joint with the wall: using sealing tape or sanitary silicone, depending on the type of tray.
  5. Wall profiles: the profiles are placed on the edge of the tray, set plumb and the holes are marked.
  6. Drilling: the tiles are drilled with the hammer action off, the holes are filled with silicone and the profiles are screwed in place.
  7. Glass and door: the fixed panels and door are fitted, the hinges or rollers are adjusted and the seals are fitted.
  8. Siliconing the profiles: the joints are sealed exactly as the manufacturer's instructions say, especially the bottom corners at the tray.
  9. Curing and testing: silicone usually needs around 24 hours according to the manufacturer. The shower is not used until then. A test shower is then carried out.

How much shower enclosure fitting costs and what affects the price

Fitting is priced per piece. The guide labour price in the price list is €150.00 per piece. It applies to a standard enclosure with a tray in a prepared bathroom. The final figure varies depending on what the job involves.

  • Type of unit: the cheapest is swapping an enclosure for one of the same size in the same place, where the waste lines up and the walls are straight. A fully enclosed cabin with a roof, shower column or body jets has more parts and also needs a water connection, so it takes considerably longer.
  • Removing the old enclosure or bath: together with cleaning off silicone and disposal, this is extra work. A tiled-in bath takes more effort to remove than a freestanding enclosure.
  • A waste that does not line up: moving the waste is usually a separate plumbing job and often means disturbing the floor tiles. It can add more to the cost than fitting the enclosure itself.
  • Building a plinth for the tray: adds bricklaying and tiling work and drying time.
  • Tray recessed under the tiles: setting it with sealing tape before tiling means an extra visit.
  • Uneven walls or a corner out of square: the profiles have to be adjusted and sometimes packed out.
  • Tiles: large-format or very hard tiles drill more slowly and with a greater risk of cracking.
  • Access: a narrow route into the bathroom or an upper floor without a lift makes carrying large glass panels harder.
  • Electrical components: the electrician's work is charged separately.

When comparing quotes, ask whether the price includes removal of the old enclosure, waste disposal, the waste trap, silicone and door adjustment.

How to prepare the bathroom for fitting day

  • The enclosure is on site and checked: unpack and inspect it as soon as it is delivered, especially the glass edges. Damaged glass found only during fitting means a return and another appointment.
  • Wall and floor tiling is finished and dry: including grouting. Fitting profiles in an unfinished bathroom will be postponed.
  • The door and shower control positions are decided: deciding on the day causes delays. With hinged doors it sometimes turns out that a different type of enclosure is needed.
  • The stopcock is accessible and working: a seized valve in the flat or an inaccessible stopcock slows the work down.
  • The bathroom is cleared: toiletries, mats and cabinets near the shower removed, so there is room to work and to lay down the glass.
  • Disposal is arranged: the old enclosure, the bath and the new enclosure's packaging take up a lot of space. Before you hand them over, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
  • There is somewhere else to wash: the new shower cannot be used until the silicone has cured.

Typical mistakes and how they show up later

A tray that is not level. Water sits in one corner and the enclosure profiles do not fit properly. The door then leaks or swings open on its own. The tray is therefore checked with a spirit level before the glass is fitted.

A waste trap not tested for leaks. A leaking joint under the tray may only show up months later, when water gets into the floor or the flat below. With a built-in plinth, an access hatch is left for this reason.

Profiles fitted before tiling. The tiles go behind the wall profiles. If the profiles are fitted first, water runs behind the tiles. This shows up as damp grout, mould and tiles coming loose.

A recessed tray without sealing tape. Silicone alone in the joint cracks over time and water gets behind the tiles and under the tray.

Silicone in the wrong place. Most manufacturers specify sealing the profiles on the outside. Silicone on the inside can trap water running down the glass and channel it under the tray. Some manufacturers, however, seal the joint between profile and tray on the inside or on both sides. The fitting instructions for the specific enclosure decide.

General-purpose silicone instead of sanitary silicone. Ordinary silicone soon develops black spots in damp conditions. A shower needs sanitary silicone with a mould inhibitor.

Drilled-through tanking. Every hole in the tiles breaches the tanking beneath. If the holes are not filled with silicone, water seeps into the wall around the screws.

Drilling with hammer action. The tile cracks around the hole or the glaze chips. Replacing a damaged tile behind a profile is very difficult.

Using the shower before the silicone has cured. Soft silicone is damaged by water and the joint leaks from the start.

Badly adjusted doors. Sliding doors with unadjusted rollers drag and leak, and hinged doors swing open on their own. Adjusting the doors is part of fitting, not an extra.

How to check the finished installation

At handover, inspect the enclosure carefully and try the shower. Check that:

  • the tray is solid, does not move and drains without water left in the corners,
  • the trap under the tray does not drip and can be reached through a removable panel or access hatch,
  • the profiles are plumb and the glass has no scratches or chipped edges,
  • the tiles around the screws are not cracked,
  • the door moves smoothly, does not open on its own and closes properly,
  • the silicone joints are continuous, smooth and without gaps,
  • during a test shower no water escapes outside or under the tray - aim the spray at the door and the bottom corners as well,
  • with a cabin that has electrical components, everything works and the electrician has handed over the electrical installation certificate,
  • care instructions and warranty terms have been provided.

A simple habit extends the enclosure's life: squeegee the glass after showering and ventilate the bathroom. It is worth descaling the sliding door rollers and seals from time to time. Worn seals can be bought separately and replaced.

DIY guide: fitting a flat-pack shower enclosure

A standard flat-pack enclosure with a tray on legs is within the reach of a competent DIYer with a helper and the right tools. Leave fully enclosed cabins with electrical components, trays on plinths, recessed trays and moving the waste to a professional. Follow the order described above, always in line with the manufacturer's fitting instructions. In addition:

  • have a spirit level, a drill with the hammer action switched off, tile drill bits, a screwdriver, a sealant gun, sanitary silicone and masking tape ready,
  • cover the drilling point with masking tape so the bit does not slip on the glaze,
  • before drilling, check that no pipes or electric cables run in the wall behind the profile,
  • carry and fit glass panels with two people and never stand them on their edge on the floor tiles - the edge of toughened glass is the most vulnerable part,
  • tighten the profile screws fully only after checking that the glass and door line up,
  • apply silicone to a dry, degreased surface and smooth it straight away, before it starts to skin.

Frequently asked questions

Roughly €150.00 per piece. Expect to pay more for removing an old bath, moving the waste, building a plinth for the tray or fitting a fully enclosed cabin with body jets.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.