Building work price list: Terminal Valve Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Plumbing works cost | ||||
| Install stopcocks / isolation valves | pcs | €13.00 / pcs | pcs | enter quantity- |
| Installation of wall-hung WC duct frame | pcs | pcs | - | |
| Install and fit access panels | pcs | €45.00 / pcs | pcs | enter quantity- |
| Installation of concealed WC frame | pcs | €120.00 / pcs | pcs | enter quantity- |
| Install and brick-up bath | pcs | €90.00 / pcs | pcs | enter quantity- |
| Install ceramic basin | pcs | €50.00 / pcs | pcs | enter quantity- |
| Shower tray installation | pcs | €130.00 / pcs | pcs | enter quantity- |
| Install shower enclosure glass (screen) | pcs | pcs | - | |
| Installation of shower enclosure | pc | €150.00 / pc | pc | enter quantity- |
| Install deck-mounted tap | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install wall-mounted bath/shower mixer | pcs | €65.00 / pcs | pcs | enter quantity- |
| Install concealed shower valve body (iBox) | pcs | pcs | - | |
| Install concealed mixer tap | pcs | pcs | - | |
| Cold and hot water outlet point | pcs | €35.00 / pcs | pcs | enter quantity- |
| Internal waste and drainage outlet point | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install washing machine/dishwasher valve and trap | pcs | pcs | - | |
| Hang and connect electric water heater up to 120 l | pcs | €104.35 / pcs | pcs | enter quantity- |
| Install whole-house water filter | pcs | €55.00 / pcs | pcs | enter quantity- |
| Installation of domestic sewage treatment plant / septic tank on gravel bed | pc | €600.00 / pc | pc | enter quantity- |
| Hot water circulation pipework | lm | lm | - | |
| Pressure test internal water supply pipework | hr | hr | - | |
| Chase cutting for plumbing (concrete) | lm | €29.00 / lm | lm | enter quantity- |
| Make good walls after plumbing | lm | €8.50 / lm | lm | enter quantity- |
| Install and chase in concealed valve body | pcs | €95.00 / pcs | pcs | enter quantity- |
| Install shower channel + screed in | pcs | pcs | - | |
| Install valve for dryer/washer + waste | pcs | €55.00 / pcs | pcs | enter quantity- |
| Connect pipework to cast iron waste stack | pcs | pcs | - | |
What a terminal valve is and when it is needed
A terminal valve is the last shut-off at the end of a water or heating branch, just before the appliance. It lets you stop the water to a single tap, WC, washing machine or radiator while the rest of the flat or house stays in use. When a tap drips or a WC cistern keeps running, only this valve needs closing, and there is no need to hunt for the main stop tap.
Installation is needed on a new installation, when a tap or appliance is replaced, and when the old valve drips, will not turn or no longer shuts off at all. A faulty valve is often discovered at the worst moment, for example when a tap connector bursts and the water cannot be stopped.
Types of terminal valves in flats and houses
Terminal valves look similar, but they differ mainly in what is connected to them:
- angle valve or isolating valve under a basin, sink or at a WC, which takes the flexible connector of the tap or cistern,
- washing machine or dishwasher valve with a male hose thread, often with a check valve,
- quarter-turn ball valve at the end of a branch, which closes with a quarter turn of the lever,
- radiator valves: a thermostatic radiator valve (TRV) on the flow and a lockshield valve on the return, which allows the radiator to be isolated and balanced.
What to decide before replacing valves
Replacing a valve is a short job, but a few points are worth settling in advance. This saves a second visit and misunderstandings over the bill.
- How many valves to replace at once. Once the water is off and the plumber is on site, it makes sense to replace all the old valves in the bathroom or kitchen, not just the one that drips. Valves of the same age tend to be in similar condition.
- Who buys the materials. Agree whether the plumber supplies the valves or you buy them. If you buy them yourself, photograph the old valve and the thread and find out the size.
- What to do with the connectors. If the flexible tap connector is old or the braiding is rusty, it is sensible to replace it together with the valve.
- Where the main stop tap is and whether it shuts off. If the stop tap does not close fully, allow for replacing it or for shutting off the water to the whole building.
- Radiators in a block of flats. With communal heating, replacing radiator valves has to be arranged with the managing agent or the residents' management company, because the riser has to be drained. Draining is usually done by a contractor appointed by the building, often outside the heating season. The timing therefore follows the building, not the other way round.
How a terminal valve replacement is carried out
- Shutting off the water: the plumber closes the main stop tap or isolates the heating branch and releases the pressure by opening the nearest outlet.
- Disconnecting the appliance: the tap, cistern or washing machine connector is removed from the old valve.
- Removing the old valve: the valve is unscrewed. If it is seized, a second spanner is used to hold back, so the pipe in the wall is not damaged.
- Cleaning the thread: remains of old sealant and limescale are removed, and the thread is checked for corrosion or cracks.
- Sealing: PTFE tape, thread sealing cord or hemp with jointing paste is applied to the thread. Some valves come with a factory-applied seal, and then nothing further is added.
- Fitting: the valve is screwed on and tightened so the outlet points in the right direction, for example towards the tap connector.
- Connecting the appliance: the connector or radiator is attached to the new valve. Joints with a rubber washer are tightened with care and without extra sealant.
- Refilling: the water is turned on slowly to avoid water hammer. On a heating system, the system is topped up and bled.
- Checking: the joint is wiped and checked with a dry cloth, and the valve is opened and closed several times.
- Pressure test: on new pipework or larger alterations, the whole branch is pressure tested according to the pipe manufacturer's instructions.
A routine replacement of one angle valve on a sound and accessible thread usually takes under an hour. A radiator takes longer, because draining, refilling and bleeding are added to the replacement itself.
How to choose the right valve
The valve must suit both the pipework and what flows through it. When choosing, check:
- thread size, in homes most often ½" and on main branches ¾",
- medium, drinking water needs a valve approved for drinking water, heating needs a valve rated for heating water and its temperature,
- pressure rating marked PN, which should be comfortably above the working pressure of your system,
- material, chrome or nickel-plated brass is standard, and in hard water areas a better-quality valve is worth it,
- operation, a ball valve closes quickly and reliably, a screw-down valve allows finer flow control,
- shape and length, under a narrow vanity unit or behind a wall-hung WC on a concealed cistern frame space can be tight, and a valve that is too long will not fit or will force the connector into a bend.
For washing machines and dishwashers, a valve with a check valve is chosen, because it prevents water from the appliance flowing back into the drinking water supply.
Ball and screw-down valves that are not turned for years can seize with limescale and fail to close when needed. Closing them fully and reopening them once or twice a year helps. With a lever ball valve this takes a few seconds.
What the price depends on
The guide labour price is €13.00 per piece. It covers a routine replacement on a freely accessible and sound thread. The final amount changes according to what the plumber finds on site:
- Condition of the old valve: a seized or corroded valve that will not loosen can sometimes double the time. It has to be freed carefully so the thread does not snap.
- Condition of the thread in the wall: if the thread is damaged, a section of pipe has to be altered and sometimes tiles have to be removed. This is then no longer a valve replacement but a pipework repair, priced separately according to its extent.
- Main stop tap: if it does not seal and has to be replaced first, there is an extra item.
- Access: a valve in a cramped space behind a unit or a bath takes longer, and sometimes a unit has to be removed or an access panel opened.
- Type of valve: an angle valve under a basin is the simplest. Radiator valves take more work because of draining, refilling and bleeding.
- Draining the riser: in a block of flats this is often done by the building's appointed contractor and invoiced separately.
- Number of valves: when several valves are replaced together, the travel, shut-off and refilling time is shared, so each one works out cheaper than with separate visits.
- Materials: whether the valve is included depends on the agreement. A better-quality valve or one with a check valve costs more than the most basic type.
Preparing the home before the plumber arrives
The plumber works faster without having to reach the valve through the contents of cupboards. Before the visit, it helps to:
- empty the cupboard under the basin or sink and pull out the washing machine,
- know where the main stop tap is and clear access to it, for example under the kitchen sink, in a cellar or in a service riser,
- in a block of flats, let the neighbours know the water will be off briefly,
- have the new appliance or tap ready if it is to be connected straight away,
- if you buy the materials yourself, have the valves and connectors at home before the appointment,
- have a bucket, cloths and a clear space for tools ready.
Typical mistakes and how they show up later
A fitting mistake often does not show immediately, but only after a few days or weeks. A slow weep stays hidden in the cupboard and is only revealed by a swollen cupboard base, a stain on the wall or a leak into the flat below. The most common mistakes are:
- tape wound against the thread, which bunches up when screwed and the joint weeps,
- overtightening, which cracks the valve body or damages the thread in the wall. The crack sometimes opens only later with changes in pressure or temperature,
- backing off after tightening to line up the outlet, which breaks the seal,
- valve fitted against the arrow on valves with a set flow direction, typically thermostatic and check valves. The radiator then hums and is hard to control, or the check valve does not work,
- extra sealant on joints with a rubber washer, which is unnecessary and harms the joint,
- valve unsuitable for the temperature or pressure, for example a cheap water valve fitted on heating,
- kinked or stretched connector, when the valve outlet does not point towards the appliance. The connector deteriorates at the bend over time and can burst.
With a threaded joint, the outlet is lined up only by tightening further, never by backing off. If the valve goes past the right position, it is better to unscrew it and reseal it.
Replacing an angle valve yourself
If the main stop tap works and the valve is screwed onto a freely accessible thread, the replacement can be done as DIY. The procedure is the same as for the plumber above, but when doing the work yourself these details are worth following. For radiators, corroded pipework or a damaged thread in the wall, it is better to call a plumber.
- Close the main stop tap, open the tap and put a bucket and cloth under the valve.
- Disconnect the connector and unscrew the old valve anticlockwise. If the thread in the wall turns with it, hold it with a second spanner.
- Clean the thread thoroughly, as remains of old tape or hemp would prevent the new seal from working.
- Wind PTFE tape or sealing cord with the thread, that is clockwise when looking at the end of the thread. A few layers of tape are enough, and for sealing cord follow the number of turns on the pack.
- Screw the new valve on by hand first so it does not cross-thread, then tighten it with a spanner to the position where the outlet points to the connector.
- Connect the connector, close the new valve and slowly open the main stop tap.
- Open the new valve and check the joint several times with dry tissue, which shows even a small drop.
Check the joint again after a few hours and the next day. If the pipe in the wall starts to turn or break while loosening the old valve, stop work and call a plumber.
How to check the finished work
At handover, ask for everything to be shown on site. Check that:
- the wall joint and the connector joint are dry even after several hours of use,
- the valve turns easily and no water passes when it is closed,
- the outlet points straight to the appliance and the connector is not kinked or stretched,
- the valve is firm and does not turn in the wall when moved slightly,
- on a radiator, the lockshield valve can be closed and the radiator heats evenly once opened,
- the arrow on valves with a set flow direction matches the direction of the water,
- a valve with a check valve is fitted to the washing machine or dishwasher, if agreed,
- the area is clean, and for new pipework there is a record of the pressure test.
Terminal valves are one small part of plumbing work. On a new installation they follow steps such as chasing channels for the water pipes in concrete, and in a bathroom refit they are often fitted alongside the installation of a concealed shower valve.
Frequently asked questions
As a guide, €13.00 per piece for a routine replacement on an accessible and sound thread. The price rises with a seized old valve, a damaged thread in the wall, poor access or draining the riser for radiators.
A plumber usually replaces one angle valve on a sound thread in under an hour. It takes longer with a seized valve, a damaged thread or a radiator, where the system has to be drained, refilled and bled.
There is no fixed interval. A valve is worth replacing when it is stiff to turn, does not seal when closed, is corroded or weeps. It is also sensible to replace it during a bathroom or kitchen refit, or when a radiator or tap is replaced.
In a house it is possible, but at least part of the system has to be drained, then refilled and bled. In a block of flats the managing agent has to be involved, because the whole riser is drained. In most cases it is better to leave the work to a plumber.
Both work if used correctly. Tape and sealing cord are clean and simple. Hemp with paste forms a thicker seal, so the outlet is easier to bring round to the right position while tightening. Even with hemp, however, the joint is never backed off after tightening. The correct winding direction and the right amount are what matter.
If the joint between the valve and the wall drips, the thread is usually poorly sealed or the valve was backed off after tightening. The valve then has to be unscrewed, the thread cleaned and resealed, as forcing it tighter risks cracking. If the connector nut drips, the rubber washer is usually damaged or badly seated. Loosening the nut, reseating or replacing the washer and tightening with care is enough.
Replacing a terminal valve is routine maintenance and does not normally need approval. If it is part of a larger alteration to the pipework or involves the common parts of a building, check with the managing agent or freeholder. Under the Water Supply (Water Fittings) Regulations 1999, some plumbing work, such as certain bidets, pumps or large baths, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify.
Related work
How channels for water pipes are cut into concrete, when to use a wall chaser, what to watch for in concrete blocks of flats and how to check the work.
How a concealed cistern frame or valve body is set into a wall, what to watch when chasing it in, and how to check the work before tiling.
How a concealed shower valve body (iBox) is installed, what makes the job harder, the mistakes to avoid and how to check the finished work.
How access panels are fitted into masonry, concrete, plasterboard and riser boxing. Choosing type and size, installation steps, typical mistakes and checks.
How a shower channel is set into the floor, connected to the waste, bedded in screed and waterproofed, and how to check the finished work.
How a glass shower screen or bath screen is fitted, screen versus shower enclosure, choosing glass and doors, common mistakes and checks at handover.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.