Price list 2026 · Europe

Washing Machine and Tumble Dryer Valve and Waste Installation

Washing machine valve and waste installation means fitting a shut-off valve to the water supply and a trap to the drainage. A guide price is €55.00 per piece. The main factor is whether connections are already in the wall.

Updated 09/2026·13 min read·27 price list items
Standard labour price
€55.00/ pcs
Indicative range
€44.00 - €71.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Washing Machine and Tumble Dryer Valve and Waste Installation

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Plumbing27 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Plumbing works cost

Install valve for dryer/washer + wastepcs€55.00 / pcspcsenter quantity-
Installation of wall-hung WC duct framepcspcs-
Install and fit access panelspcs€45.00 / pcspcsenter quantity-
Installation of concealed WC framepcs€120.00 / pcspcsenter quantity-
Install and brick-up bathpcs€90.00 / pcspcsenter quantity-
Install ceramic basinpcs€50.00 / pcspcsenter quantity-
Shower tray installationpcs€130.00 / pcspcsenter quantity-
Install shower enclosure glass (screen)pcspcs-
Installation of shower enclosurepc€150.00 / pcpcenter quantity-
Install deck-mounted tappcs€35.00 / pcspcsenter quantity-
Install wall-mounted bath/shower mixerpcs€65.00 / pcspcsenter quantity-
Install concealed shower valve body (iBox)pcspcs-
Install concealed mixer tappcspcs-
Cold and hot water outlet pointpcs€35.00 / pcspcsenter quantity-
Internal waste and drainage outlet pointpcs€25.00 / pcspcsenter quantity-
Install washing machine/dishwasher valve and trappcspcs-
Hang and connect electric water heater up to 120 lpcs€104.35 / pcspcsenter quantity-
Install whole-house water filterpcs€55.00 / pcspcsenter quantity-
Installation of domestic sewage treatment plant / septic tank on gravel bedpc€600.00 / pcpcenter quantity-
Hot water circulation pipeworklmlm-
Pressure test internal water supply pipeworkhrhr-
Chase cutting for plumbing (concrete)lm€29.00 / lmlmenter quantity-
Make good walls after plumbinglm€8.50 / lmlmenter quantity-
Install and chase in concealed valve bodypcs€95.00 / pcspcsenter quantity-
Install shower channel + screed inpcspcs-
Install stopcocks / isolation valvespcs€13.00 / pcspcsenter quantity-
Connect pipework to cast iron waste stackpcspcs-
Total labour
- enter quantity
Create quote from price list →

What washing machine valve and waste installation includes

This job prepares the space for a washing machine, a tumble dryer or a washer-dryer. A shut-off valve is fitted to the cold water supply, and a waste with a trap is connected to the drainage so the drain hose can sit in it. The appliance then only needs to be pushed into place, the hose screwed on and the plug put in the socket. It is one of the most common tasks within plumbing work.

This job is needed in these situations:

  • in a new build or when refitting a bathroom, kitchen or utility room,
  • when moving the washing machine, for example from the bathroom to a utility room or the kitchen,
  • when the old valve drips, is stiff or will not close,
  • when the washing machine only drains into the bath or basin through a hooked-over hose,
  • when a tumble dryer is added and its condensate drain should go to the waste.

A tumble dryer usually does not need its own water valve. Condenser dryers and heat pump dryers take no water from the mains. They only remove water from the laundry. Only some models with a steam function need a water supply, so it is always worth checking the manual. A vented dryer needs neither water nor a waste. It needs an outlet for moist air to the outside, and that is not part of this job.

What to decide before fitting the valve and trap

Most problems with a washing machine in a new position come from the wrong location or the wrong type of valve or trap. These points are worth settling before the plumber starts drilling and chasing.

Where the valve will go

The valve must be accessible. If it sits low behind the machine near the floor, it cannot be reached in an emergency. It is usually fitted above the level of the machine's worktop, or where it can be reached by hand with the appliance pushed in, often at about one metre high. If the machine will sit under a kitchen worktop, the valve goes where it can be reached through the door of the neighbouring cabinet.

How high the waste will be

The manufacturer's instructions decide the waste height. Many washing machines require the end of the drain hose to be roughly 60 to 100 cm above the floor, though some manufacturers give 90 cm as the maximum. If the waste is too low, water can siphon out of the machine during the wash. If it is too high, the pump works at the limit of its capacity and the machine may show a drain error. The waste is usually run in 40 mm or 50 mm pipe with a fall towards the soil stack. If a tumble dryer will be stacked on the washing machine, plan where its condensate hose will go.

Which valve

  • Lever ball valve: simple and reliable, the water shuts off with one movement. For washing machines it has a 3/4" male thread, so the hose screws straight on.
  • Valve with backflow protection: stops water from the machine getting back into the mains supply. For drinking water this is a sensible choice, and many washing machine valves have a check valve built in.
  • Dual valve: has two outlets, for example for a washing machine and a dishwasher, or a water outlet combined with a waste connection. It saves space under the worktop.
  • Valve with leak protection: shuts off the water automatically if a hose bursts or leaks. It is especially useful in flats above other people's ceilings.

Brass or chrome-plated brass is the better material. Plastic valves on a pressurised supply tend to be less durable and their threads are more easily damaged.

Which trap

  • Recessed trap (in-wall waste box): built into the wall, so nothing sticks out behind the machine and the appliance can sit closer to the wall. It is best fitted at the tiling or plastering stage.
  • Surface-mounted trap or standpipe: fitted to an existing waste outlet, quick to install. Suitable for a utility room or a retrofit.
  • Trap with two inlets: for a washing machine and a dryer's condensate drain, or a washing machine and a dishwasher at the same time.

A good trap has a water seal against odours, a non-return valve against water coming back from the drainage, and can be cleaned without opening up the wall.

Socket and approvals

The electrical socket is not part of this job, but it is linked to the valve position. A socket in a bathroom should only be planned and wired by a qualified electrician in line with BS 7671:2018+A4:2026, the current IET Wiring Regulations. Electrical work in a bathroom is notifiable under Part P in England and Wales, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. These define zones around the bath and shower where a socket must not be, and the circuit should be protected by an RCD with a 30 mA tripping current. The valve and trap should not be directly above the socket.

In a block of flats, any work on the shared stack or shutting off water to several flats must be agreed with the managing agent or the freeholder. The stack is a shared part of the building and work on it is for a professional. If the bathroom layout changes during a refit, check with the local authority whether any approval is needed. Under the Water Supply (Water Fittings) Regulations 1999, some plumbing work, such as certain bidets, pumps or large baths, must be notified to your water company before you start, unless you use an approved (WaterSafe) plumber who can self-certify. It cannot be promised in advance that no formal approval is required.

Step-by-step valve and waste installation

If water and waste connections are already in the wall, the job is shorter. If the pipework has to be extended or rerouted, the job adds chasing, new pipe and making good the wall. A typical sequence looks like this:

  1. Turning off the water: the plumber closes the main stopcock for the flat or house and releases the pressure from the pipework.
  2. Setting out: the valve and waste positions are set according to where the appliance will stand and the manufacturer's instructions.
  3. Preparing the connections: the water and waste connections are prepared. With new pipework, the waste is laid with the correct fall towards the stack, often in channels created by chasing channels for the water installation.
  4. Pressure test: with new pipework, the pipes are pressure tested for leaks before the chases are covered.
  5. Fitting the valve: the valve is screwed onto the water connection and the thread sealed with hemp and paste or PTFE tape, depending on the type of joint.
  6. Fitting the trap: a recessed trap is built into the wall, a surface-mounted one is fitted to the waste outlet.
  7. Making good: the chases and the area around the connections are made good. Where there are tiles, they are cut to fit and grouted.
  8. Connecting the appliance: the machine's inlet hose is screwed onto the valve and the drain hose is inserted into the trap.
  9. Dryer condensate: if it is to drain directly to the waste, it is connected to the same trap through the second inlet.
  10. Test: the water is turned on, the joints are checked for leaks and a test cycle with draining is run.

What affects the price of valve and waste installation

The guide price for the labour in the price list is €55.00 per piece. One piece usually means one connection point, that is a valve and waste for one appliance. Check in the quote whether the price includes materials, meaning the valve and trap, or labour only. The final cost depends mainly on these factors:

  • Existing or missing connections: when working water and waste connections are in the right place and only the valve and trap need fitting, the job matches the basic item. If connections must be run from the nearest pipework or the stack, pipe, chasing and making good are added. The price can then reach several times the basic item.
  • Distance from the stack: the further the machine moves, the longer the pipe and the harder it is to keep the waste fall. Sometimes the waste has to run in the floor or in a stud wall or false wall, similar to the one built for the installation and recessing of concealed cisterns and frames, which lengthens the job considerably.
  • Condition of old pipework: old galvanised steel pipes are often furred up or rusty, and the thread can crack when the valve is loosened. A section of pipe behind the wall then has to be replaced too.
  • Tiling: if the wall is tiled, the connection must be made good without damaging the tiles. This is slower and more delicate work. If a tile breaks and there is no spare, the problem is bigger than the installation itself.
  • Type of trap: a surface-mounted trap on an existing outlet is quick. A recessed trap means cutting an opening in the wall and making it good, so the work is noticeably more expensive.
  • Type of valve: a basic ball valve is cheap. A dual valve or a valve with leak protection costs more in materials, but the fitting is similar.
  • Shutting off the water: if the water cannot be shut off for one flat only and the whole stack has to be closed, the job must fit into an agreed time slot and sometimes needs a second visit.
  • Two connections at once: a washing machine and dryer, or a washing machine and dishwasher, in one place are handled with a two-inlet trap or a dual valve. This is slightly more work, but still one connection point.

How to prepare the home so the plumber does not have to wait

With this job, much depends on whether the space is ready and the brief is clear.

  • Clear access: the washing machine is pulled out or not yet in place, the area in front of the wall is cleared and the plumber does not have to move things first.
  • Known stopcock: the location of the stopcock for the flat or house is known and it has been checked that it closes. A seized stopcock can stop the job before it starts.
  • Appliance manual: keep the washing machine and dryer manuals to hand, or at least the exact model numbers. They show the waste height and whether the dryer needs water.
  • Agreed position: if the position of the machine or kitchen units is still undecided, the connections may end up in the wrong place. For a kitchen, a drawing of the units with cabinet dimensions helps.
  • Agreement with the managing agent: if the stack has to be shut off, the date is agreed with the managing agent and neighbours are warned in advance. Otherwise the job gets postponed.
  • Order of works: a recessed trap and new connections are done before tiling or plastering, just like the installation of a concealed shower valve (iBox). The electrician should know where the valve will be before the socket is fitted.
  • Materials bought in advance: if the valve and trap are bought by the customer, agree the exact type with the plumber beforehand. The wrong thread or waste diameter means a trip to the merchant.

Typical mistakes when connecting a washing machine and how they show

Valve hidden behind the machine

When a hose bursts, the valve cannot be closed quickly and water flows until someone shuts the stopcock. A valve that has not been touched for years is also often seized when it is needed.

Hose loosely hooked over the edge of the bath or basin

The hose moves during draining and the water ends up on the floor, and in a block of flats often in the flat below. It works as a temporary fix, but a fixed trap in the wall is safer in the long term.

Missing trap or hose pushed too far into the waste

Odours come up from the drainage and the machine may siphon waste water back in. The laundry can then smell even after washing.

Wrong waste height

If the waste is too low, water drains out of the drum by itself and the machine keeps refilling. Water consumption rises, the wash takes longer and some machines show an error. If the waste is too high, the pump is overloaded over time and fails sooner.

Waste without sufficient fall

Water stands in the pipe and fibres and detergent residue build up. Over time the waste blocks and the machine drains slowly.

Kinked or stretched inlet hose

Over time it bursts, most often at the bend.

Too much PTFE tape or hemp

The valve may crack when tightened, or the joint leaks from the start. A hairline crack in the valve body sometimes only shows weeks later as a damp patch on the wall.

New pipework covered without a pressure test

A leaking joint in the wall only shows as damp plaster or loose tiles, and the repair means chasing the wall open.

Dryer condensate hose left loose

The hose falls out, water runs behind the appliances and nobody notices for a long time.

Replacing a washing machine valve yourself

If water and waste connections are already in the wall and only the old valve needs replacing and a trap fitting, this can be done as a DIY job. New pipework, work on the stack and wiring a socket should be left to professionals. With old galvanised steel pipework, where the valve is hard to loosen, it is wiser to call a plumber so the connection in the wall does not crack.

  1. Close the main stopcock and open the nearest tap to release pressure from the pipes.
  2. Put a cloth and a container under the connection for the remaining water.
  3. Loosen the old valve with a spanner while holding the connection with a second spanner so it does not move in the wall.
  4. Clean the female thread of the connection of old hemp and dirt.
  5. Wind PTFE tape, or hemp with paste, onto the thread of the new valve in the direction of the thread, without overdoing it.
  6. Screw the valve in by hand and tighten it with a spanner. The lever should end up facing forwards or upwards, but the valve should only reach this position by further tightening, never by backing off. A joint with PTFE or hemp that is turned back after tightening will stop sealing.
  7. If the lever will not reach a suitable position without excessive force, unscrew the valve completely, rewind the sealing and repeat.
  8. Fit the trap to the waste outlet and tighten the union nut by hand.
  9. Connect the machine's inlet hose with its rubber washer and insert the drain hose into the trap.
  10. Slowly open the stopcock and check the joints for a few minutes with a dry paper towel.
  11. Run a short programme with draining and check the trap and hoses.

Checking the valve and waste on handover

When handing over the work, take a few minutes to check that:

  • the valve opens and closes easily and can be reached with the appliance pushed in,
  • the valve, hose and trap joints are dry even after several minutes under pressure,
  • with new pipework, a pressure test was carried out and the plumber has confirmed it,
  • the waste height matches the washing machine manufacturer's instructions,
  • the drain hose sits firmly in the trap and does not slide out during draining,
  • no water overflows during draining and there is no smell from the waste,
  • the inlet hose is neither kinked nor stretched,
  • the dryer condensate drain, if used, is connected to the trap and not left loose,
  • the valve and trap are not directly above an electrical socket,
  • the area around the connections is made good and the tiles are not damaged.

Frequently asked questions

The price list gives a guide price of €55.00 per piece for one connection point. This applies mainly where connections are already in the wall. If new pipework, chasing or making good of tiles is needed, the price goes up.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.