Price list 2026 · Europe

Shower screen installation on a tray or bath

Fitting a glass shower screen means fixing the glass to the wall above a shower tray or bath and sealing it. The guide price is €180.00 per piece. The type of screen, how true the walls are and removing an old one affect the cost.

Updated 09/2026·12 min read·27 price list items
Standard labour price
€180.00/ pcs
Indicative range
€144.00 - €234.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Shower screen installation on a tray or bath

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Plumbing27 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Plumbing works cost

Install shower enclosure glass (screen)pcs€180.00 / pcspcsenter quantity-
Installation of wall-hung WC duct framepcspcs-
Install and fit access panelspcs€45.00 / pcspcsenter quantity-
Installation of concealed WC framepcs€120.00 / pcspcsenter quantity-
Install and brick-up bathpcs€90.00 / pcspcsenter quantity-
Install ceramic basinpcs€50.00 / pcspcsenter quantity-
Shower tray installationpcs€130.00 / pcspcsenter quantity-
Installation of shower enclosurepc€150.00 / pcpcenter quantity-
Install deck-mounted tappcs€35.00 / pcspcsenter quantity-
Install wall-mounted bath/shower mixerpcs€65.00 / pcspcsenter quantity-
Install concealed shower valve body (iBox)pcspcs-
Install concealed mixer tappcspcs-
Cold and hot water outlet pointpcs€35.00 / pcspcsenter quantity-
Internal waste and drainage outlet pointpcs€25.00 / pcspcsenter quantity-
Install washing machine/dishwasher valve and trappcspcs-
Hang and connect electric water heater up to 120 lpcs€104.35 / pcspcsenter quantity-
Install whole-house water filterpcs€55.00 / pcspcsenter quantity-
Installation of domestic sewage treatment plant / septic tank on gravel bedpc€600.00 / pcpcenter quantity-
Hot water circulation pipeworklmlm-
Pressure test internal water supply pipeworkhrhr-
Chase cutting for plumbing (concrete)lm€29.00 / lmlmenter quantity-
Make good walls after plumbinglm€8.50 / lmlmenter quantity-
Install and chase in concealed valve bodypcs€95.00 / pcspcsenter quantity-
Install shower channel + screed inpcspcs-
Install stopcocks / isolation valvespcs€13.00 / pcspcsenter quantity-
Install valve for dryer/washer + wastepcs€55.00 / pcspcsenter quantity-
Connect pipework to cast iron waste stackpcspcs-
Total labour
- enter quantity
Create quote from price list →

What fitting a screen involves and when it is needed

A glass screen separates the shower from the rest of the bathroom so that water does not splash onto the floor. It is fitted onto a shower tray, onto the floor tiles of a shower area or along the edge of a bath. It is needed when a bathroom is being refitted, when a bath is replaced with a shower, when an old plastic enclosure leaks or has gone yellow, or when the shower curtain over the bath is to go. The result depends on accurate measuring, secure fixing and careful sealing.

The price per piece covers one screen. This is usually one glass panel, or one panel with a door, fitted onto a tray or bath already in the bathroom. A corner enclosure with two fixed side panels and a door is made up of several glass panels, so check before ordering whether each panel is priced separately. If a complete shower enclosure is bought as a kit including the tray, the job is enclosure installation, which also covers bedding the tray and connecting the waste trap.

A trayless shower with glass set into a U-channel in the floor, known as a walk-in or wet room screen, is a separate job with different requirements for the floor and the fixings. This article covers screens on shower trays and baths.

What to decide before tiling

Most problems with a screen start before the installer arrives. Some decisions can only be changed after tiling by cutting out tiles.

  • Where the brackets and hinges will go. If the wall is plasterboard, the bracket positions need backing, such as timber noggins or a metal stud. For a frameless screen this is essential.
  • Where the mixer and shelves will go. A hinged panel or door must not hit the shower valve, a shelf or a hook when it opens. If a concealed valve is planned, the installation of a concealed shower valve (iBox) and shower mixer should be set out with the screen position in mind.
  • Which way the door will open. There must be clear space in front of the shower that does not clash with the basin or radiator.
  • Pipework and waste. If they need moving, this is a job for the plumber before tiling, for example by chasing channels for the water supply in concrete. Other first-fix work in the same room, such as the installation and boxing-in of concealed cisterns and frames, is best done at the same stage.
  • Standard size or made to measure. Made-to-measure glass is only produced once the finished walls have been measured, so the lead time is longer. Allow for this in the refit schedule.

Screens on a shower tray or in a shower enclosure

Most screens are fitted onto a shower tray. The glass or the bottom profile sits on the edge of the tray, so the tray must be bedded firmly and level. If it flexes or rocks under load, the silicone joint between the glass and the tray will eventually crack and water will start to leak.

In a corner, one or two fixed side panels are fitted with a door. In an alcove between two walls, a single panel with a door is often enough. Choose the door type to suit the space:

  • hinged or pivot doors are the easiest to look after, but need room to open,
  • sliding doors save space, but have a track and rollers that need occasional cleaning and adjusting,
  • bifold doors suit narrow bathrooms, but have more joints and seals.

Bath screens

A bath screen replaces a shower curtain. It is usually a single fixed panel, a hinged panel or a folding screen with two to five sections. It is fixed to the wall above the bath edge, and the bottom edge of the glass finishes just above the rim.

Points to watch:

  • the bath rim must be level and the bath firmly supported, either built in or on feet that do not move,
  • for a bath with a curved rim or a corner bath, choose a screen designed for that exact shape,
  • the seal on the bottom edge of the glass must reach the bath rim, otherwise water will splash out every time the shower is used.

A bath screen is usually a simpler job than a full shower enclosure, as it is one panel and one wall profile. The fixing requirements are the same, however, because a hinged panel acts as a lever on the hinges and the wall.

Framed, frameless or made to measure: which to choose

A framed screen has the glass set in an aluminium or stainless steel frame. The frame offers some adjustment, so it can cope with a slightly out-of-plumb wall. It suits most bathrooms and is easier to fit. The drawback is that dirt and limescale build up in the profiles.

A frameless screen is just glass with minimal fittings. It looks light and makes a small bathroom feel bigger. It is easy to clean, but it needs straight walls, accurate measuring and a solid background, because thicker glass is quite heavy.

A made-to-measure screen makes sense in loft bathrooms with sloping ceilings, in irregular alcoves or where standard sizes do not fit.

Toughened safety glass is used, usually 6 to 10 mm thick. If it breaks, it shatters into small blunt pieces rather than sharp shards. For appearance, the choice is between:

  • clear glass, which lets light through and suits small bathrooms,
  • frosted or satin glass, where privacy matters,
  • sandblasted or patterned glass as a design feature,
  • glass with an easy-clean water-repellent coating, which water runs off more easily and limescale sticks to less.

How the installation is carried out step by step

  1. Removing the old screen: in a refit, the old screen or enclosure comes out first. Old silicone holds firmly, so it is cut out carefully to avoid damaging the wall tiles, floor tiles or tray edge. All traces of old sealant must be removed, as new silicone will not bond to old.
  2. Measuring: the installer measures the width and height of the opening at several points, at the top, middle and bottom. A spirit level or laser is used to check whether the walls are plumb, whether the corner is square and whether the tray or bath rim is level. In older houses and flats this is rarely the case. Measuring is always done after tiling, never before.
  3. Made-to-measure glass: if the screen is made to order, measuring is critical. Toughened glass cannot be cut or drilled once toughened, so all holes for hinges and brackets must be made by the glass supplier beforehand. A measuring error means a new panel.
  4. Marking out: positions for profiles, hinges and brackets are marked on the wall.
  5. Drilling: tiles are drilled with a diamond or tile drill bit at low speed with the hammer action off.
  6. Fixing: plugs suited to the background are set into sealed holes, and the wall profiles or brackets are fixed.
  7. Fitting the glass: the glass is lifted in with suction handles and aligned plumb and level.
  8. Fittings and seals: hinges, seal strips and magnetic profiles are fitted, and the door is adjusted so that it moves freely and closes properly.
  9. Sealing: the joints with the wall and the tray, bath or floor are sealed with sanitary-grade silicone.
  10. Curing: silicone needs time to cure, usually around 24 hours according to the manufacturer. The shower should not be used until then.

What affects the price of installation

The guide labour price is €180.00 per piece. It applies to a standard screen, meaning one panel or one panel with a door, on a level, solid tray or bath in a tiled bathroom. The final cost is affected by the following:

  • Type of screen: the simplest is a single fixed panel with no moving parts. Hinged doors add work fitting and adjusting the hinges. Sliding doors have a more complex mechanism and take longer to adjust, so they push the price up more noticeably.
  • Number of panels: with several panels in one enclosure, each must be aligned and sealed separately. A corner enclosure with two fixed panels and a door therefore costs more than a single panel in an alcove.
  • Removing the old screen: cutting out silicone and cleaning off old sealant is extra work, and slow where the sealant is firmly bonded.
  • Condition of walls and background: out-of-plumb walls, a corner that is not square or a tray or bath that is not level all need adjusting and packing. With a frameless screen, this can also mean made-to-measure glass.
  • Tiles: large-format or very hard tiles, such as porcelain, are harder and slower to drill and more likely to chip.
  • Load-bearing capacity of the wall: a weak background, such as plasterboard without backing at the bracket positions, needs special fixings or extra work.
  • Weight of the glass: heavy panels need two people to fit, which increases the cost.
  • Related work: a badly placed mixer or waste must be moved first. This is plumbing work for a plumber and is priced separately.

How long installation takes and what speeds it up

A simple bath screen or one panel with a door on a prepared tray usually takes an installer two to four hours. A corner enclosure with several panels or a frameless screen in thick glass can take most of a day. Add about a day for the silicone to cure before the shower can be used.

The screen is fitted right at the end, once all other work is finished. Installation goes quickly if:

  • wall and floor tiling is finished and grouted, and the grout has dried,
  • the mixer, shower kit and shelves are fitted or their positions are precisely set,
  • the tray or bath is firmly bedded and supported, and the waste trap is connected,
  • the glass and fittings have been delivered in advance, unpacked and checked for chipped edges,
  • the installer knows where pipes and electric cables run in the wall, so they are not hit when drilling,
  • there is clear access to the shower and room in the bathroom to set the glass down,
  • in a block of flats, the work is planned for the hours when noisy work is allowed.

Installation takes longer or has to be rescheduled if the installer arrives and the tiling is not finished, the tray rocks or an agreed part is missing. With made-to-measure glass, any change after measuring means a new panel and a new date.

Common mistakes and how they show up later

Poor sealing. Cheap silicone without fungicide soon turns black, and silicone applied to a damp or greasy surface comes away. Water then gets under the floor tiles, into the wall or under the bath. Silicone should only go onto a clean, dry surface and be left to cure properly.

Drilling through the tanking. Under the tiles in a shower there is usually a tanking membrane or coating. Every hole breaks it, so holes are filled with silicone before the plugs go in. In practice, leaks often come from unsealed fixing holes rather than from the screen itself. This shows up as a damp wall behind the shower or mould in the next room.

Fixing only into the tiles. Fixings must reach into the masonry or a reinforced background. Otherwise the screen will loosen over time and the door will start to catch.

Measuring before tiling. Adhesive and tiles change the size of the opening by several millimetres. With made-to-measure glass, that is enough for it not to fit.

Seals fitted the wrong way round. The bottom seal with a flap must point into the shower or bath. Fitted the other way, it channels water out.

A rocking tray or bath. If the base under the glass moves, no silicone will last. The tray or bath must be packed and firmly bedded before the screen is fitted.

Poorly adjusted hinges. The door swings open on its own, closes at an angle or catches on the seal. Over time the seal tears and water runs through the joint.

DIY guide: fitting a framed kit screen

A competent DIYer can fit a framed shower enclosure or a simple bath screen from a kit, with a helper and the right tools. Frameless screens in thick glass and made-to-measure glass are best left to a professional. If water pipes or the waste need moving, that is a job for a plumber. Always follow the manufacturer's fitting instructions.

  1. Check that all parts are in the box and that the glass is undamaged, especially at the edges.
  2. Remove old silicone and degrease the surface.
  3. Check with a spirit level that the tray or bath rim is level and does not move.
  4. Hold the wall profile in place, set it plumb with a spirit level and mark the holes.
  5. Put masking tape over the drilling points and drill with a tile bit, hammer action off.
  6. Fill the holes with silicone, insert the plugs and screw the profiles in place.
  7. With a helper, fit the glass into the profiles. Never rest the glass on its edge on the floor tiles or the bath.
  8. Adjust the door or hinged panel so that it moves freely and lines up.
  9. Fit the seals and run silicone along the outside of the joints with the wall and the tray or bath.
  10. Leave the silicone to cure as stated by the manufacturer, and only then test the shower.

Checking the finished work and maintenance

At handover, inspect and test the finished screen carefully. Check that:

  • the glass has no scratches or chipped edges,
  • the tiles around the brackets are not cracked or chipped,
  • the screen is plumb and does not move when pushed gently,
  • the door or hinged panel moves smoothly, does not catch anywhere, does not open on its own and closes properly,
  • silicone joints are continuous, smooth and without gaps,
  • seals are fitted the right way round and along their full length,
  • once the silicone has cured, no water escapes during a test shower,
  • care instructions and warranty terms have been handed over.

One simple habit extends the life of the screen: squeegee the glass after showering and ventilate the bathroom. Clean with mild products without abrasives or strong acids, which damage the easy-clean coating and the fittings. Check the seals from time to time and tighten any loose screws.

Frequently asked questions

The guide price is €180.00 per piece, meaning one screen with a single panel or a panel with a door. The final cost depends on the type of screen and door, the number of panels, removal of an old screen, how true the walls and tray are, and the type of tiles to be drilled.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.