Building work price list: Door threshold strip: fitting and cost
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Flooring cost | ||||
| Install transition strips | pcs | €8.00 / pcs | pcs | enter quantity- |
| Remove old nailed/glued wood parquet flooring | m² | €12.00 / m² | m² | enter quantity- |
| Careful removal of old parquet to laying plan | m² | €5.10 / m² | m² | enter quantity- |
| Install laminate flooring | m² | €12.50 / m² | m² | enter quantity- |
| Install click vinyl flooring | m² | m² | - | |
| Install click/lock engineered wood flooring | m² | €12.50 / m² | m² | enter quantity- |
| Full-bond solid/engineered wood flooring | m² | €12.00 / m² | m² | enter quantity- |
| Install underfloor heating (electric mat) | m² | m² | - | |
| Install parquet blocks | m² | m² | - | |
| Install Chevron parquet flooring | m² | m² | - | |
| Install and bond original parquet blocks (reclaimed/repaired) | m² | m² | - | |
| Sand and 3x lacquer parquet flooring | m² | m² | - | |
| Sand, fill and 3x lacquer parquet flooring (complete) | m² | €30.00 / m² | m² | enter quantity- |
| Install skirting boards | lm | €4.00 / lm | lm | enter quantity- |
| Caulking around skirting boards | lm | €1.90 / lm | lm | enter quantity- |
Why and when a threshold strip is needed
Laminate, engineered floating floors and vinyl on an HDF core all change size with air temperature and humidity. They shrink in winter when the heating is on and expand in summer. That is why an expansion gap is left around the whole floor and the floor is broken at certain points. The threshold strip covers that gap so it can be walked over and cannot be seen.
A strip is needed mainly in these situations:
- doorways between rooms: manufacturers of floating floor coverings, Egger for example in its installation instructions, require an expansion break at door thresholds, at transitions and in L-shaped rooms,
- where two different floors meet: laminate and tiles, vinyl and carpet, a new floor and old parquet. Each material behaves differently and the gap between them has to be covered,
- different floor heights: when the bathroom tiles sit a few millimetres higher than the hallway laminate, a height-adjusting strip turns a sharp step into a smooth ramp,
- large areas: with Egger laminate, an expansion break is required when a room is more than 10 metres long or wide. For some vinyl floors the limit is 15 metres. The expansion joint in the middle of the floor is then also covered with a threshold strip,
- floor edges: at a balcony door threshold, by a step or along any edge where the floor stops and has nothing to join, an end profile is fitted.
The job is done at the end of laying a floating floor, usually together with the skirting boards. It is also done on its own when replacing old strips or after a floor repair.
A flat with no threshold strips: is it possible?
On forums, people often ask about running one floor through the whole flat without a single strip. Some have done exactly that and report that nothing went wrong even after several heating seasons. Others have ended up dealing with a floor that buckled in a doorway and had to be cut afterwards. What decides it is the manufacturer's instructions for the specific floor. If they require an expansion break at doorways and the floor is laid without one, this can cause problems with a warranty claim.
Fully bonded vinyl is a different case, as it is glued to the subfloor, does not float and does not move as a whole. If you want a flat without strips, read the instructions for the specific floor before you buy and choose according to what the manufacturer allows.
What to decide before work starts
Strip type by floor height
- threshold strip joins two floors at the same height. It is flat and simply covers the gap,
- height-adjusting strip (manufacturers also call it an adaptation profile) bridges a difference in level. One side is lower, the other higher. According to manufacturers, some profiles can handle a difference of up to around 23 millimetres,
- end profile finishes the edge of the floor at a threshold, step or wall where there is no second floor.
When choosing a strip, it is worth measuring the actual height difference at the doorway rather than estimating from the thickness of the flooring. Adjoining floors often sit on underlays and screeds of different thicknesses.
Strip material
- aluminium: the most common and hard-wearing option. It comes in plain finish, anodised in gold, silver and bronze shades, or with a wood decor. Floor manufacturers also recommend it for bathrooms, and Egger does not permit any profiles other than aluminium there,
- decor strips: MDF or plastic with a foil matching the floor decor. They blend in well but are less suited to damp areas and very heavy traffic,
- stainless steel and brass: used with tiles and wherever the strip needs to be really tough.
Fixing method
- screwed through the strip: the strip has holes and is screwed into wall plugs in the subfloor. The screw heads remain visible,
- base profile: a lower track or plugs are first anchored into the subfloor and the top strip clips into them. The joint has no visible screws,
- glued and self-adhesive strips: no drilling, the strip is fixed with construction adhesive or with adhesive tape on its underside.
With underfloor heating, you do not drill into the screed because of the risk of hitting a pipe. In that case a glued or self-adhesive strip is the answer. If drilling is unavoidable, you need to know exactly where the pipes run.
Colour and length
Strips are sold in lengths from roughly 90 centimetres to 2.5 metres and are cut to size. One piece is enough for a doorway, while a wide opening or an expansion joint across the middle of a room needs a longer length. It is best to choose the colour at the same time as the floor, not after it has been laid.
How the work is done, step by step
- Checking the gap: the floor fitter checks that there is an expansion gap between the floors and that nothing is blocking it. The width follows the floor instructions. For Egger laminate it is 1.5 millimetres per metre of floor, and at least 8 to 10 millimetres.
- Measuring the height difference: this confirms the type of strip and the height of the base profile.
- Cutting to size: the strip is cut with a hacksaw or mitre saw to fit exactly between the door frames. With lined door frames, the strip is sometimes cut in under the architrave.
- Anchoring: holes are drilled into the subfloor in the centre of the gap and plugs or the base profile are fitted. For gluing, the subfloor is cleaned, degreased and the adhesive applied.
- Fitting the strip: the strip is pressed into the profile, screwed down or glued. The screw or profile must sit in the gap, not in the floating floor.
- Checking: the strip is walked over. It must not move, knock or click, and the floor beneath must be free to slide.
The key point is that the strip is held by the solid subfloor, not by the floating floor. If the floor is screwed or glued to the subfloor through the strip, it can no longer move and will start to lift with the first change in humidity.
What affects the price
The guide price for labour in the price list is €8.00 per piece. The final amount depends mainly on the following:
- number of transitions: in a typical flat that means every doorway plus the transitions to the bathroom, kitchen and balcony. Each transition counts as a separate piece,
- width of the transition: a long strip across an open-plan space or an expansion joint across a whole room is more work than a strip in a doorway,
- fixing method: drilling into concrete and setting a base profile takes longer than a self-adhesive strip,
- underfloor heating: the strip has to be glued or the pipes located, which adds time,
- door frames and architraves: cutting the strip in under an architrave or around a frame is slower than a straight cut,
- replacing an old strip: removal, pulling out old plugs and cleaning off adhesive are extra work,
- material: the price of the strip varies with material and profile, and aluminium height-adjusting and stainless steel strips cost more than simple flat ones.
In practice, strips are priced together with the whole floor. You can work out the total cost of the floor including all strips in the flooring work price list.
What needs to be ready
- the floor is laid on both sides of the transition and the expansion gap is clear,
- the strip has been chosen, including its type, colour and fixing method,
- with underfloor heating, the pipe routes are known or gluing has been agreed,
- the door frames are fitted, or it is clear how the strip will be finished at the architrave. When fitting lined door frames after the floor has been laid, an expansion gap must also be left around the frame,
- there are no doors in the way at the transition, or they can be lifted off their hinges.
Common mistakes and how they show up later
Strip screwed through the floating floor
The floor cannot move, so it bulges in summer and opens up at the joints in winter. The screw belongs in the gap between the floors.
No expansion break at the doorway
Running a floor through the whole flat without a break is a risk with any floor whose instructions require one at doorways. It shows up as waves or buckling right at the doorway, where the floor is narrowest.
Self-adhesive strip on a dusty surface
Both experiences come up repeatedly on forums: for some people self-adhesive strips stay put for years, for others they come away after a while. Most often this happens where the surface was not clean and dry, or where the strip was stuck to the floating floor.
Strip that clicks underfoot
On forums, people complain about thin aluminium strips that click when stepped on. A stiffer profile or better packing underneath helps, so the strip is not bridging an air gap.
Wrong strip for a height difference
A flat threshold strip on floors of different heights rocks and leaves an edge that people trip over. A height difference calls for a height-adjusting strip.
Strip covering the floor on one side only
If the strip is narrow and the gap wide, the floor can pull out from under the strip as it shrinks and expose the gap. The width of the strip must match the expansion gap with an allowance for movement.
How to check the finished job
- the strip is straight, parallel with the door and runs from frame to frame with no gap,
- it does not move, knock or click when walked over,
- the screws or profile are in the gap, not in the floor. Pressing gently on the floor next to the strip should make the floor move slightly,
- a height-adjusting strip gives a smooth ramp with no sharp edge,
- screw heads are countersunk and the strip is not scratched,
- there is no adhesive or silicone squeezed out around the strip.
If the floor lifts next to the strip after the first winter, it almost always means it is pinned somewhere, either by the strip, a door frame or heavy furniture.
DIY guide: what to watch out for
Fitting a threshold strip is within reach of a handy DIYer with a drill and a hacksaw. The important points are:
- Measure the height of both floors and choose the right type of strip.
- Check that the expansion gap is clean and nothing is blocking it.
- Cut the strip accurately, ideally a millimetre long, and fine-tune it with a file.
- Drill only into the gap between the floors. With underfloor heating, gluing is the safer choice.
- For a self-adhesive strip, clean and degrease the surface, peel off the backing only just before fitting and press the strip down firmly.
- Finally, walk over the strip and check that the floor beneath it is not clamped.
Wear safety glasses when cutting aluminium and deburr the cut edges with a file.
Frequently asked questions
The guide price for labour in the price list is €8.00 per piece, excluding materials. Each transition is charged separately. A long strip across a wide opening, replacing an old strip or gluing over underfloor heating costs more.
With a floating floor, usually yes, if the manufacturer's instructions require it. The instructions for the specific floor are what count. With fully bonded vinyl that does not float, a transition can often be handled without a strip, provided the floors are at the same height.
If both floors are at the same height, a flat threshold strip is enough. Where there is a height difference, you need a height-adjusting strip. For bathrooms and transitions to tiles, aluminium is the most common choice.
A strip that is screwed down or clipped into a base profile holds more reliably. Self-adhesive is a good option where you cannot drill, for example over underfloor heating, but the surface must be clean and dry.
Better not. A drilled pipe means breaking up the floor. With underfloor heating, strips are glued or self-adhesive ones are used.
Most often there is no expansion break, the strip has been screwed through the floor or the door frame is pinning the floor. The fix is to free the floor, cut it at the doorway and fit the threshold strip correctly.
Yes. The old strip is unscrewed or prised off, the surface is cleaned and the new one is fitted into the same gap. Just choose a strip wide enough to cover the whole gap.
Related work
How laminate and other floating floors are laid, what the subfloor needs, which underlay to choose and how to check the finished floor.
How a floating click timber floor is laid: subfloor preparation, underlay, the method, common mistakes and checking the finished floor.
How click vinyl flooring is laid: subfloor preparation, underlay, expansion gaps and trims. Common mistakes and how to check the finished floor.
How to fill the gap between skirting board and wall, when to use acrylic caulk or silicone, and what to check in the finished job.
How skirting boards are fitted, which material and fixing method to choose, and how to handle the expansion gap, corners and uneven walls.
How nailed and bitumen-bonded parquet is lifted, what makes the job harder, and how to clear bitumen residue and prepare the subfloor.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.