Building work price list: Fitting lintels over doors and windows
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Masonry cost | ||||
| Lintel installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Partition walling up to 12.5 cm (brick/Ytong) | m² | €19.00 / m² | m² | enter quantity- |
| Walling up to 30 cm (Porotherm, Ytong) | m² | €25.00 / m² | m² | enter quantity- |
| Wall and floor primer application | m² | €1.90 / m² | m² | enter quantity- |
| Mesh reinforcement for internal blockwork | m² | €11.50 / m² | m² | enter quantity- |
| Wall repairs (Rimano, Rotband) | m² | m² | - | |
| Wall plastering (base coat) | m² | m² | - | |
| Fine lime-cement render (Feinputz) | m² | €9.50 / m² | m² | enter quantity- |
| Stucco render | m² | €9.50 / m² | m² | enter quantity- |
| Machine-applied renders (lime-cement) | m² | m² | - | |
| Gypsum / skim plaster | m² | €12.00 / m² | m² | enter quantity- |
| External renders | m² | €15.50 / m² | m² | enter quantity- |
| Block up openings | m² | €25.00 / m² | m² | enter quantity- |
| Chimney construction (chamotte + ceramic liner) | lm | lm | - | |
| Schiedel-type chimney construction | lm | lm | - | |
Why and when a lintel is needed
The masonry above an opening has nothing to rest on. Without a lintel, the bricks or blocks above a door or window would drop. A lintel is therefore needed over every opening in a masonry wall:
- in external walls above windows, balcony doors and front doors,
- in internal load-bearing walls above doors, where the wall often carries the floor or ceiling slab as well,
- in partition walls above doors, where lighter non-load-bearing lintels are sufficient,
- above openings for roller shutters and external blinds, where special shutter lintels with space for the box are used.
A new opening in an existing load-bearing wall is a separate case. That is not a matter of setting a ready-made lintel into a wall under construction but an intervention in the structure of the house. It requires a structural assessment, a method set by a structural engineer and approval under local building regulations. Steel beams are often installed over such openings, which we cover in the article on the steel support structure in a cut opening.
What to decide before work starts
Type of lintel
In practice, these are the types you will come across most often:
- Porotherm KP 7 clay lintels: narrow lintels with a fired clay shell and a reinforced concrete core. They are load-bearing as soon as they are fitted and need no masonry above them to work. They are made in lengths from 1 to 3.5 m. In a thicker wall, several are laid side by side,
- flat lintels: shallow lintels that only start carrying load together with the masonry or reinforced concrete slab above them. They must be propped while this cures,
- Ytong load-bearing lintels (NOP): aircrete lintels with steel reinforcement, load-bearing immediately after fitting. They are made of the same material as the wall, so they do not create a significant thermal bridge,
- Ytong non-load-bearing lintels (NEP): for partitions and infill masonry,
- lintel beams and U-blocks: for larger openings, where the lintel is cast in place or together with the ring beam and floor slab,
- roller shutter and blind lintels: with space for the box of an external roller shutter or blind.
An overview of lintel types, their sizes and prices can be found in the materials article Ytong and Porotherm, section on lintels over doors and windows.
Length and number of pieces
The length of the lintel is determined by the width of the opening and the minimum bearing length on both sides. The number of pieces side by side depends on the wall thickness. Manufacturers publish tables of combinations and load capacities for this. The type, length and number of pieces should be specified in the design drawings, and for load-bearing walls by a structural engineer. If there are no drawings, the bricklayer should check the manufacturer's table rather than guess.
Thermal insulation in external walls
In an external wall, a lintel is a potential thermal bridge. Manufacturers of clay lintels show EPS or XPS insulation between or in front of the lintels in their external wall details. Whether insulation is needed and how much depends on the design and the thickness of the external insulation. On an externally insulated facade, the insulation largely solves this problem.
Roller shutters and blinds
External shading has to be decided before the walls go up. If you later opt for external roller shutters or blinds and the lintel is not prepared for them, the box has to be fitted on the facade or below the lintel at the expense of window height.
How the work is done step by step
- Checking the jambs: the bricklayer checks the width of the opening and that both jambs are at the same height and level.
- Choosing the length: the lintel must bear on the masonry on both sides by at least the length the manufacturer specifies. For Porotherm KP 7 lintels, the manufacturer's catalogue gives 125 mm for lengths of 1 to 2 m and 250 mm for lengths from 2.25 m. For Ytong load-bearing lintels it is 175 to 250 mm depending on the type.
- Mortar bed: mortar is spread on the jambs. For clay lintels this is cement mortar, and the manufacturer's details specify class M10. For aircrete, thin-bed mortar according to the manufacturer's system.
- Fitting the right way up: lintels have the underside or arrows marked, and the arrows must point upwards. A KP 7 clay lintel is laid on edge, with the flat underside facing down. The manufacturer states explicitly that it may only be installed in the position shown in its drawings.
- Levelling: the lintel is set level and flush, with timber wedges used for precise positioning.
- Tying several pieces together: in a thick wall, several lintels are laid side by side. The KP 7 manufacturer recommends tying them together at the ends with soft binding wire so they do not tip over. Insulation is placed between them as specified in the design.
- Propping where needed: flat lintels and lintel beams are supported on adjustable props. For Ytong lintel beams over openings of 1.25 m and more, the manufacturer specifies a prop at midspan and full load capacity only after 28 days. Props are removed only after the period the manufacturer specifies.
- Continuing the masonry: above the lintels the masonry is bonded into the surrounding wall, followed by the ring beam and floor slab.
For openings wider than roughly 3.5 m, standard lintels are no longer enough. Manufacturers have dedicated systems for these spans, for example Porotherm KP XL lintels, which are cast together with the floor slab and ring beam. Openings like this are always designed by a structural engineer.
What affects the price
The guide price for labour in the price list is €25.00 per piece, excluding materials. The final amount is mainly influenced by the following:
- length and weight of the lintel: two people can lift a short lintel for a partition door by hand. Long lintels over sliding doors or a patio window are heavy and may need lifting equipment,
- number of pieces over the opening: a thick external wall takes several pieces side by side with insulation between them,
- height: fitting from scaffolding on an upper floor is slower than at ground level,
- propping: flat lintels and beams have to be propped and the props removed later,
- shutter lintels and non-standard pieces: they are heavier and need more precise fitting,
- a new opening in an existing wall: this is a completely different and considerably more expensive job. It includes propping the floor above, cutting chases, installing beams and breaking out the opening,
- materials: lintels are not included in the labour price, and their cost rises with length.
Fitting lintels is usually part of building the shell walls. You can work out the cost of the whole shell in the masonry work price list.
What should be ready
- design drawings specifying the type, length and number of lintels over each opening,
- the lintels on site, stored on a level base and undamaged,
- a clear decision on where roller shutters or blinds will go, with the correct lintels ordered for them,
- adjustable props available for flat lintels and beams,
- for heavy lintels, a means of lifting and scaffolding arranged.
Typical mistakes and how they show up later
Insufficient bearing
The lintel bears on the masonry by less than the manufacturer specifies. The end of the lintel presses on a small area, the masonry beneath can crush and a diagonal crack appears above the corner of the opening.
Lintel laid upside down
The reinforcement in lintels is positioned to take tension on the underside. A lintel laid upside down does not have its full load capacity, even though it looks the same.
Shortened lintel
According to the manufacturer, neither load-bearing nor non-load-bearing Ytong lintels may be cut to length, as their reinforcement is designed for the full length. Only types for which the manufacturer explicitly allows it may be shortened.
No mortar bed
A lintel laid dry or on uneven jambs rests on only a few points. The load is not spread and cracks are likely.
Flat lintels without propping
A flat lintel with no masonry above it can carry almost nothing. If it is not propped, it will sag during bricklaying or when the floor slab is poured.
Forgotten insulation in an external wall
A cold spot forms above the window. In an uninsulated house, condensation can form there in winter and mould may appear.
Lintel chosen by guesswork
On forums, people often ask how many lintels a thicker wall needs or whether they will carry the floor slab. The answer should come from the manufacturer's table and the design, not from experience on another site.
How to check the finished work
- the lintel bears on both sides of the opening by at least the minimum length the manufacturer specifies,
- it is level and flush with the wall,
- there is a full mortar bed with no voids under the ends of the lintel,
- the underside marking or arrows are in the correct position,
- a thick wall has the correct number of pieces and insulation as per the design,
- flat lintels and beams are propped and the props were not removed too early,
- after some time, once the house carries the roof load and has been heated, no diagonal cracks have appeared above the corners of openings.
Small hairline cracks in the plaster above windows can also appear for other reasons, such as plaster shrinkage. A diagonal crack running from the corner of an opening that keeps growing, however, is a reason to call a structural engineer.
DIY guide: what to watch out for
Fitting a lintel into a wall under construction is within the reach of a skilled self-builder who can lay blocks. A new opening in an existing load-bearing wall, however, is not a job for a layperson, as it needs a structural engineer and an experienced contractor. When fitting lintels, pay attention to the following:
- Use exactly the type, length and number of pieces given in the design or the manufacturer's table.
- Keep to the minimum bearing on both sides and level the jambs to the same height.
- Lay the lintel on a full mortar bed, the right way up according to its marking.
- Do not cut lintels to length unless the manufacturer explicitly allows it.
- Prop flat lintels and beams and leave the props in place until the masonry above or the concrete has cured.
- Do not lift heavy lintels on your own; work in pairs or use lifting equipment.
Frequently asked questions
The guide price for labour in the price list is €25.00 per piece, excluding materials. If there are several lintels side by side over an opening, each piece is counted. Materials, scaffolding and any propping are added on top.
In a partition, a non-load-bearing lintel matching the thickness and material of the partition is sufficient. If the partition carries a floor slab or a wall above it, however, the design decides.
That depends on the manufacturer and the length of the lintel. For Porotherm KP 7 clay lintels it is 125 mm for lengths up to 2 m and 250 mm for longer ones. For Ytong load-bearing lintels it is 175 to 250 mm depending on the type.
It depends on the wall thickness and the type of lintel. In a thicker wall built from clay blocks, several narrow lintels are laid side by side; the exact number and the insulation between them are set by the manufacturer's table and the design.
Most load-bearing lintels cannot. For example, the manufacturer prohibits it for both load-bearing and non-load-bearing Ytong lintels. Only types for which the manufacturer explicitly states it may be shortened.
Load-bearing lintels such as KP 7 or Ytong NOP carry load as soon as they are fitted. Flat lintels and lintel beams need propping until the masonry above or the mortar has cured. For Ytong lintel beams, the manufacturer gives full load capacity after 28 days.
Altering a load-bearing wall affects the structure of the house, and in a flat it may also affect the common parts of the building. A structural assessment and approval under local building regulations are required. Your local building authority will tell you which procedure applies, depending on the extent of the work.
It is neither better nor worse; it is used in a different situation. In new builds, ready-made lintels are quicker and fit better into the masonry. Steel beams are used mainly for openings made later in existing walls, where a structural engineer designs them.
Related work
How thin partitions are built from brick or aerated concrete blocks, which material to choose, what to watch out for and how to check the finished wall.
How mesh reinforcement of masonry partitions is done, when it makes sense, which mistakes to avoid and how to check the finished wall.
How a cement-lime base coat is applied by hand or by machine, what makes the job easier or harder and how to check the finished wall.
How a Schiedel-type chimney with a ceramic liner is built, what makes the job harder, common mistakes and how to check the finished chimney.
How a chimney is built with fireclay bricks and a ceramic liner, what makes the job harder, typical mistakes and how to check the finished chimney.
When a gypsum patch is enough and when a wall needs heavy repair with lime-cement mortar. Method, common mistakes and checks.