Building work price list: Bath removal
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Demolition and dismantling works cost | ||||
| Remove bath | pcs | €45.00 / pcs | pcs | enter quantity- |
| Break out ceramic wall tiles | m² | m² | - | |
| Break out floor tiles | m² | €9.00 / m² | m² | enter quantity- |
| Remove WC | pcs | €25.00 / pcs | pcs | enter quantity- |
| Remove basin | pcs | €17.00 / pcs | pcs | enter quantity- |
| Demolish brick partition wall up to 150mm thick | m² | m² | - | |
| Demolish solid / fair-faced brickwork | m² | m² | - | |
| Demolish concrete wall / partition | m³ | €150.00 / m³ | m³ | enter quantity- |
| Demolish reinforced concrete slab up to 12 cm | m² | €54.00 / m² | m² | enter quantity- |
| Strip PVC or carpet floor coverings | m² | €4.00 / m² | m² | enter quantity- |
| Remove floating floor (parquet, linoleum) | m² | €2.50 / m² | m² | enter quantity- |
| Remove door with timber frame | pcs | €25.00 / pcs | pcs | enter quantity- |
| Cutting concrete and removing steel door frame | pcs | pcs | - | |
| Break out metal door frame from concrete | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove panel radiator | pcs | €35.00 / pcs | pcs | enter quantity- |
| Remove cast iron radiator | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove plasterboard ceiling and structure | m² | €9.50 / m² | m² | enter quantity- |
| Complete demolition of prefabricated bathroom core | pcs | pcs | - | |
| Strip old internal plaster | m² | €8.50 / m² | m² | enter quantity- |
| Remove kitchen unit | pcs | pcs | - | |
| Break out fitted wardrobe | pcs | €50.00 / pcs | pcs | enter quantity- |
| Break out WC soil pipe enclosure | pcs | €35.00 / pcs | pcs | enter quantity- |
| Remove window sills | pcs | €10.00 / pcs | pcs | enter quantity- |
| Rubble removal and disposal | t | t | - | |
| Removal and disposal of asbestos / asbestos cement | m² | €20.00 / m² | m² | enter quantity- |
What bath removal includes and when it is needed
The job covers more than disconnecting the water and waste. The bath has to be freed from the tiling or a built-up plinth, carried out of the property and taken for disposal. It is usually part of a bathroom refurbishment, a bath-to-shower conversion, or a response to a damaged or cracked bath or one that leaks into the floor below. It is often the first step before stripping out an old boxed-in bathroom or changing the layout. Removing the bath is one of the smaller jobs within demolition work, and it is often done together with other strip-out tasks.
It looks simple, but more factors matter than most people expect. A bath with a clip-on plastic panel is very different from one boxed in with blockwork and tiled. An acrylic bath is light, while a cast iron one weighs more than an adult. It also matters whether the isolation valves in the bathroom work and can shut the water off reliably.
What to agree before booking the work
Most misunderstandings happen because the customer and the tradesperson picture a different scope. Before booking, agree on the following:
- What happens after the bath is out. If the whole bathroom is being stripped back to bare walls, there is no need to save the tiling around the bath and the job is easier. If a new bath or shower tray is going in the same place and the tiles are to stay, say so in advance, because the work will be slower and more careful.
- Whether the surrounding wall and floor tiles stay. With a boxed-in bath where tiling runs down behind the bath, damage to a few tiles can rarely be avoided entirely. Without spare tiles from the same range, expect a repair with different tiles or new tiling.
- What happens to the taps. Bath taps or a bath shower mixer that will be reused must be removed carefully. If they are being replaced, the supply pipes in the wall only need to be capped off.
- Whether there is any electrical connection to the bath. If so, book a qualified electrician in advance. The section on bath materials explains this in more detail.
- What the quote should include. For a cast iron bath, check whether breaking it up is included. For a boxed-in bath, check whether removing the front panel and any plinth is included.
Cast iron, steel or acrylic: the difference
The bath material determines how many people and what tools are needed. If unsure what the bath is made of, a magnet and a tap test help: cast iron and steel attract a magnet, acrylic does not. A cast iron bath has thick walls and sounds dull when tapped, while a steel bath sounds hollow and tinny.
- A cast iron bath is very heavy and commonly weighs over a hundred kilograms. Carrying it down the stairs in one piece is difficult, so it is often broken up with a sledgehammer. Eye and ear protection are needed, and the bath should be covered with a heavy blanket or strong sheeting so that shards of enamel do not fly around the room.
- An enamelled steel bath is much lighter. Two people can usually handle it and carry it out in one piece.
- An acrylic bath is the lightest, but it is often bonded with adhesive or set on legs and a cradle, so freeing it takes patience rather than strength.
Steel and cast iron baths often have an earth bonding conductor, a green and yellow cable connected to the bath. Disconnecting and safely terminating it is a job for an electrician, not for the person removing the bath. The same applies to whirlpool baths, which have a pump and their own electrical supply.
How bath removal is carried out
The process is similar in most bathrooms. It differs mainly in how firmly the bath is built in and how much it weighs.
- Preparation and protection. The floor, basin and WC are covered, and a clear route is made to the door and along the hallway to the exit.
- Isolating the water and removing the taps. The water supply is turned off, the bath taps or mixer are removed, or the supply pipes in the wall are capped.
- Removing the panel and tiling. A plastic bath panel is simply taken off. If the bath is boxed in or tiled, the front has to be broken out and the sealant or silicone along the wall cut. In older bathrooms this is often the most time-consuming part. Only then can the trap and the joints under the bath be reached.
- Disconnecting any electrics. An electrician disconnects and terminates the earth bonding conductor and, on a whirlpool bath, the pump supply.
- Disconnecting the waste. The trap and overflow are undone and the waste pipe is immediately plugged, so that no smells come into the room and no debris falls in.
- Freeing the bath. The bath is released from the walls, legs or plinth. A heavy cast iron bath is sometimes broken up on the spot so it can be carried out in pieces.
- Carrying out and disposal. The bath and rubble are carried out, loaded and taken to a site licensed to accept the waste.
- Checking and cleaning up. Once the water is back on, the capped pipes are checked for drips, and the area is cleared of rubble and old sealant.
What affects the cost of bath removal
The guide price for the labour is €45.00 per piece. It applies to a typical situation, meaning a bath that can be disconnected and carried out without major breaking out. The final figure mainly depends on these factors:
- How the bath is fitted. A bath with only a plastic panel is the cheapest case. A boxed-in, tiled bath means breaking out the front and sometimes the plinth, which can double the time. A sunken bath or one set into an alcove is even more work.
- Keeping the surrounding tiles. Careful removal that protects the tiles around the bath takes noticeably longer than demolition where the tiling does not matter.
- Material and weight. Acrylic and steel baths are usually carried out whole. Cast iron needs more people or breaking up, and this shows in the price.
- Floor level and access. A cast iron bath on an upper floor without a lift is one of the most expensive cases. A narrow hallway, a winding staircase or a long walk to the van also add cost.
- Condition of valves and pipework. Seized, faulty or missing isolation valves mean turning off the water at the main stopcock or the communal supply, and possibly waiting for the managing agent. Corroded steel or cast iron pipework can break when disconnected and must be repaired or capped another way, which is extra work.
- Electrician's work. Where needed, it is usually charged separately.
- Removal and disposal. Some firms include them, others charge separately based on the volume of waste. With cast iron and steel baths, part of the cost may be offset by selling the metal for scrap.
By contrast, the job is quick and cheap with a freestanding bath or one with a simple plastic panel, working isolation valves and plastic waste pipework.
What makes the job easier and what slows it down
Apart from the bath itself, a lot depends on how the property is prepared. The work goes smoothly when:
- the bathroom is cleared, with no mats, cabinets next to the bath or items on shelves,
- there is a clear route from the bathroom to the front door, with no furniture in the hallway and fragile items moved out of the way - if a built-in wardrobe is being removed in the hallway, it is worth scheduling it so the route stays clear,
- it is known whether the bathroom has its own isolation valves and where the main stopcock is, and both have been checked in advance,
- the managing agent has been informed if the communal supply needs to be turned off, and a specific time has been agreed,
- there is space outside for a van to stop or for a skip,
- the electrician's visit has been arranged in advance so the removal does not have to wait.
The job takes longer when the tradesperson finds on site that nobody can turn off the water, the lift is out of order, or it is unclear whether the tiles around the bath are to be kept. Any such waiting may appear on the invoice.
Things to consider in flats and with waste
In a block of flats, let the managing agent or freeholder know in advance. If the water needs to be shut off on the communal supply, this is normally arranged by the managing agent and neighbours should be warned. Shared pipework is a common part of the building, so do not alter it without consent. Plan noisy breaking out for times allowed by the building rules or the lease.
Replacing a bath with a new bath or a shower is usually treated as ordinary maintenance. However, if the work also involves removing brick partitions, altering shared pipework or changing the layout, check with the local authority's building control beforehand whether any approval is needed. In a leasehold flat, the lease may also require the freeholder's consent. If a doorway is being changed as well, for example removing a metal door frame set in concrete, include it in the same enquiry.
An old bath counts as bulky or construction waste. It must not be left next to household bins. Before you hand over the bath or rubble, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. There are usually three options: the local household waste recycling centre under the council's rules, a skip for construction waste, or, for cast iron and steel baths, a scrap metal dealer. Take care with old boxed-in bathrooms and old seals and panels. If asbestos is suspected, stop the work. In homes built before 2000, have suspect materials tested before you drill or demolish - asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
Typical mistakes and how they show up later
Removing the taps without turning off the water
This is a common cause of flooding the flat below. Water can leak into the neighbour's ceiling before the leak is even noticed.
Leaving the waste pipe open
Rubble and pieces of enamel fall into the drain. The pipe later blocks, often only after the new bathroom is finished, when the repair is much more difficult. An open waste pipe also lets smells into the property.
Levering with force and no packing
This damages the wall, the floor or the pipework in them. A cracked pipe in the wall may not show straight away, but only as a damp patch a few days later.
Underestimating the weight of a cast iron bath
There is a risk of back injury, crushed hands and damage to stairs, banisters or doors.
Tearing the green and yellow cable
If the cable is torn off instead of being properly disconnected, the broken earth bonding may not be visible at first glance. It still compromises safety in the bathroom even after a new bath or shower is fitted.
Poorly capped pipes
A slowly dripping cap leads to damp walls and mould behind the new tiling.
Leaving the bath next to the bins
The council can issue a fine for fly-tipping.
DIY guide: removing an acrylic or steel bath
A competent DIYer with a helper can remove a lighter bath that is not firmly boxed in and has no electrical connection. For a cast iron bath, a whirlpool bath or a bath with an earth bonding conductor, call a professional. If the water can only be turned off on the communal supply, go through the managing agent.
- Cover the floor with cardboard or dust sheets and have gloves, safety glasses and a bucket ready.
- Turn off the hot and cold supply and open the taps to drain the remaining water.
- Remove the taps and cap the supply pipes in the wall.
- Take off the plastic bath panel or carefully break out the tiled front to reach the trap.
- Undo the trap, empty the water into the bucket and plug the waste pipe.
- Cut through the silicone and sealant between the bath and the wall with a sharp knife.
- Lift the bath with a crowbar over a timber block so the wall and floor are not damaged.
- Carry the bath out in pairs, lifting with care and wearing sturdy footwear.
- Check that no water is dripping from the capped pipes or joints.
How to check the work at handover
Before signing off the work, go through the bathroom using this list:
- the water supply pipes are capped and do not drip even with the main stopcock open,
- the waste pipe is plugged and free of rubble,
- the earth bonding conductor, if there was one, has been properly disconnected and terminated,
- the surrounding walls, floor and fittings that were meant to stay are undamaged,
- the taps, if they were to be kept, have been put aside complete with their fittings,
- the area where the bath stood is clear of rubble, sealant and silicone residue,
- the hallway and stairs are clean after the carrying out,
- it is clear where the bath and rubble went: the recycling centre, a skip or a scrap metal dealer.
Frequently asked questions
A guide price for bath removal is €45.00 per piece. The cost rises with boxing-in and tiling, a cast iron bath, an upper floor without a lift, faulty valves, and removal and disposal if they are not included.
Sometimes, especially if the bath only has a plastic panel and the tiling stops above its rim. If the tiling runs behind the bath or the bath is boxed in, expect some damage, and the surrounding tiles will need repairing or replacing.
If the bathroom has its own working isolation valves, closing those is enough. Otherwise the main stopcock must be turned off, or the communal supply in cooperation with the managing agent. The water should stay off for the whole time the bath is being disconnected.
A light bath that is not boxed in usually takes a few hours. A boxed-in cast iron bath on an upper floor without a lift can take most of a day.
It depends on the individual firm's quote. When booking, check whether it covers carrying out, removal and disposal of the waste, and for a cast iron bath, breaking it up.
Take it to the local household waste recycling centre under the council's rules, put it in a skip for construction waste, or, for cast iron and steel baths, take it to a scrap metal dealer. Leaving it next to household bins is not allowed.
Related work
How a built-in wardrobe is removed, what makes the job harder, what to watch for with fixings and services, and how to check the result.
How a steel door frame is removed from a concrete wall, what makes the job harder, mistakes to avoid and how to check the opening before new doors.
How a brick partition up to 150 mm thick is demolished, what to check first, what makes the job harder and how to check the finished work.
How an old fitted kitchen is taken out, what a qualified professional must disconnect, what you can do yourself and how to check the room afterwards.
How a toilet riser partition is removed, what to watch for in a block of flats and how to check that the shared pipes stayed undamaged.
How old wall tiles are removed, what makes the job harder, how to protect pipes and cables, and how to check the wall before retiling.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.