Building work price list: Breaking Out (Demolition) of Reinforced Concrete Slab up to 12 cm
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Demolition and dismantling works cost | ||||
| Demolish reinforced concrete slab up to 12 cm | m² | €54.00 / m² | m² | enter quantity- |
| Break out ceramic wall tiles | m² | m² | - | |
| Break out floor tiles | m² | €9.00 / m² | m² | enter quantity- |
| Remove bath | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove WC | pcs | €25.00 / pcs | pcs | enter quantity- |
| Remove basin | pcs | €17.00 / pcs | pcs | enter quantity- |
| Demolish brick partition wall up to 150mm thick | m² | m² | - | |
| Demolish solid / fair-faced brickwork | m² | m² | - | |
| Demolish concrete wall / partition | m³ | €150.00 / m³ | m³ | enter quantity- |
| Strip PVC or carpet floor coverings | m² | €4.00 / m² | m² | enter quantity- |
| Remove floating floor (parquet, linoleum) | m² | €2.50 / m² | m² | enter quantity- |
| Remove door with timber frame | pcs | €25.00 / pcs | pcs | enter quantity- |
| Cutting concrete and removing steel door frame | pcs | pcs | - | |
| Break out metal door frame from concrete | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove panel radiator | pcs | €35.00 / pcs | pcs | enter quantity- |
| Remove cast iron radiator | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove plasterboard ceiling and structure | m² | €9.50 / m² | m² | enter quantity- |
| Complete demolition of prefabricated bathroom core | pcs | pcs | - | |
| Strip old internal plaster | m² | €8.50 / m² | m² | enter quantity- |
| Remove kitchen unit | pcs | pcs | - | |
| Break out fitted wardrobe | pcs | €50.00 / pcs | pcs | enter quantity- |
| Break out WC soil pipe enclosure | pcs | €35.00 / pcs | pcs | enter quantity- |
| Remove window sills | pcs | €10.00 / pcs | pcs | enter quantity- |
| Rubble removal and disposal | t | t | - | |
| Removal and disposal of asbestos / asbestos cement | m² | €20.00 / m² | m² | enter quantity- |
Where a reinforced concrete slab up to 12 cm is found and when it is broken out
This is a thinner concrete slab with steel reinforcement cast into it. It is typically found as the floor slab in a garage or cellar, on a patio, on a balcony, as a base under a lighter outbuilding, or as a floor slab in an older house.
It usually needs breaking out in these cases:
- services under the floor are being replaced, such as drainage or water pipes,
- the slab is cracked and the reinforcement is rusting,
- a new layout needs an opening, a staircase or a lower floor level,
- the ground under a patio or garage is settling and the slab is breaking up,
- a new building is going on the site and the old slab is in the way.
The whole slab does not always have to go. Often it is enough to break out a strip for a pipe run or an opening for a staircase and leave the rest of the slab in place.
Why reinforced concrete is harder than plain concrete
Concrete handles compression well, and steel handles tension. Together they form a strong unit that holds together even after the concrete has been broken. For this reason, reinforced concrete cannot be broken out with a breaker alone. The concrete breaks into pieces, but the bars stay in the mesh and have to be cut out bit by bit. The result is two types of waste: concrete rubble and steel.
A thickness of up to 12 cm counts as a thinner slab. In practice, it can usually be handled with a hand-held breaker without heavy plant. It is still heavy, noisy and dusty work, and it must be clear what job the slab does in the building. For an overview of related jobs, see demolition work.
Before breaking out starts: structure, approvals, services and safety
The most important question is whether the slab is structural. A ground-bearing floor slab in a garage usually carries nothing. A suspended floor slab, a balcony or a slab carrying partition walls, however, is part of the structure. In that case, a structural engineer must set out the method, decide whether and how the structure needs temporary propping with props, and set the order of work.
- Building control: alterations to the structure normally have to meet the building regulations and are usually subject to approval. Check with your local authority building control or an approved inspector before any work starts. In Scotland, structural alterations need a building warrant from the council before work starts.
- Flats: in a block of flats, contact the freeholder or the managing agent in advance. Floor slabs are often part of the shared structure of the building, and the lease usually does not allow work on them without consent.
- Services: find out what runs in or under the slab. Electricity, water and gas must be isolated in the work area. Electrical work must only be done by a qualified electrician, and work on gas pipes only by a Gas Safe registered engineer.
- Old layers: old floors sometimes have tiles or adhesives on the slab that contain asbestos. In homes built before 2000, have suspect materials tested before you drill or break out. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Space below a suspended slab: when breaking out a floor slab or a balcony, pieces of concrete fall downwards. The area below must be closed off and signed, nobody may stay in it, and with a balcony the path or yard below must be fenced off too.
- Fall protection: nobody may stand on the part of the slab being broken out or on a part that has lost its support. On suspended slabs and balconies, the work is done from a safe part of the slab or from scaffolding, the edges of openings are protected with guardrails, and fall arrest equipment is used when working over a drop.
If a gas pipe is still damaged during the work, stop immediately, do not use electrical appliances or naked flames, open windows, leave the area and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.
What to agree with the contractor in advance
Most disputes in demolition concern what is included in the price and where the job ends. Before placing the order, clarify:
- Exact scope: whether the whole slab or only part of it is being broken out. It helps to mark the boundary directly on the slab and put the dimensions in the quote.
- What happens at the edge: whether the edge is cut with a diamond saw first, and whether reinforcement should be left protruding at the edge to tie in a new slab or cut back flush. With a structural slab, the structural engineer decides.
- Layers on the slab: tiles, screed, insulation or bitumen membrane are broken out with the slab, but are not always included in the price. Ask whether the quote covers the concrete only.
- Waste: who arranges the skip, loading, removal and a waste transfer note. Check that the carrier is registered with the Environment Agency. There is a lot of rubble and it is heavy, so it is worth discussing the skip size in advance.
- Props: who supplies the props and how long they need to stay on site.
- What comes next: if a new slab, drainage or a staircase is going in, it is practical for the breaking out and the next job to follow on without a long gap.
How the work proceeds step by step
- Marking out and trial hole: the area to be removed is marked out and the slab thickness is checked with a trial hole or a core. At the same time, the density and size of the reinforcement are established.
- Propping: for a structural slab, props are installed according to the structural engineer's instructions.
- Protecting the surroundings: the work area is sealed off with polythene sheeting, and windows, doors and vents are covered. With a suspended slab, the space below is closed off.
- Edge cut: the edge of the slab is cut with a diamond saw so that the breaking does not carry into the part that stays.
- Breaking the concrete: the concrete is broken with a breaker in smaller sections, working from the free edge inwards.
- Cutting the reinforcement: the exposed bars are cut with an angle grinder or hydraulic shears.
- Removal and sorting: waste is carried out and sorted as the work goes on, with concrete and steel kept apart.
- Cleaning up: the edges are trimmed and the base is prepared for the next layer.
If part of the slab is to stay, for example when cutting an opening for a staircase or a drainage pipe, it is always worth cutting the edge first. Without a cut, cracks easily spread into the remaining slab.
By hand, by machine or by sawing
For a slab up to 12 cm, the most common tool is a hand-held electric breaker. It suits flats, cellars and smaller areas where a machine cannot get in and where the work must be precise with little vibration.
Machine breaking with a breaker on a mini digger makes sense for larger outdoor areas, such as a patio or the floor of a large garage. It is faster, but needs access for the machine and causes stronger vibration.
Diamond sawing suits places where a clean edge is needed or where vibration must be kept low, such as cutting an opening in a floor slab. The whole slab can also be cut into blocks, which are then removed in one piece. Wet cutting also greatly reduces dust. Water and electrical tools together, however, create a risk of electric shock. Only tools designed for wet cutting are used, the supply must be protected by an RCD, and cables and extension leads must not lie in water.
Cost of breaking out a reinforced concrete slab: what it depends on
The guide price for the work is €54.00 per m². It applies to a standard slab with good access. The actual price goes up mainly because of the following:
- Amount of reinforcement: dense mesh or thick bars slow the work more than the concrete itself. A slab with two layers of reinforcement or heavy bars can take considerably more work than a slab with a single light mesh.
- Concrete quality: old, crumbling concrete comes out more easily, while hard concrete needs more time and tooling.
- Structural or non-structural slab: a ground-bearing floor slab is the simplest case. A suspended slab or a balcony means propping, careful work from above, fall protection and closing off the space below. Such work is usually considerably more expensive and slower, and the structural engineer's fee has to be added.
- Access: breaking out in a cellar, on an upper floor or in a tight space means hand work and carrying waste out by hand. Every extra floor and every extra metre of carrying rubble adds to the price.
- Extent and shape of the area: small openings and narrow strips cost more per m² than a large continuous area, because each m² involves more cutting and handling.
- Accurate edges: diamond sawing of edges or cutting the whole slab into blocks is a separate job that is often charged separately, per running metre of cut.
- Layers on the slab: tiles, screed or insulation mean more material to remove and more waste.
- Waste: loading, removal and disposal of concrete for recycling or to landfill make up a large part of the job. The steel can be taken to a scrap metal dealer.
- Surroundings: an occupied house, neighbours on the other side of the wall and limited hours for noisy work mean slower progress and sometimes work spread over more days.
When comparing quotes, check whether the price per m² includes cutting the reinforcement, carrying out, the skip and removal. A cheaper quote without waste can turn out more expensive in the end.
What makes the job easier and what slows it down
Good preparation by the client can save a lot of time. It helps when:
- the room or area is completely cleared and anything that cannot be moved is covered. Fitted furniture should come out first, see demolition of a built-in wardrobe,
- a place for the skip is agreed in advance, and a skip permit from the council is in place if the skip stands on the road,
- a power supply with adequate protection is available, together with water for cutting and damping down dust,
- services in and under the slab have already been isolated by a qualified person and their routes are known,
- the client has the structural engineer's details and building control approval ready if a structural slab is being broken out,
- neighbours have been told in advance and noisy work is planned within permitted hours,
- the route from the work area to the skip is clear and floors along the way are protected.
If partition walls stand on the slab, they are usually removed first, see demolition of brick partitions. The same applies to door frames concreted into the floor, see demolition of metal door frames set in concrete.
The job is slowed down when an unknown pipe or cable turns up during breaking out, when the skip does not arrive on time and the rubble has nowhere to go, or when the work has to wait for the structural engineer because the slab is different from what was expected.
Typical mistakes and how they show up later
Breaking out without checking whether the slab is structural. With a suspended slab or a balcony, this can end in part of the structure collapsing. Less visible consequences are cracks in walls and sagging of the floor, which may only appear weeks later.
Unprotected space below the slab and open edges. Falling pieces of concrete can injure people under the slab or balcony, and a worker on the slab can fall through the opening.
Underestimating the reinforcement. Without tools for cutting steel, the work stalls and bars get ripped out together with the surrounding concrete. The edge is left broken and needs further repair when a new slab is tied in.
No cut at the edge. Cracks run into the part of the slab that was meant to stay. On floors, they later show as cracks in new tiles or screed exactly above the old crack.
Heavy vibration near adjoining structures. It can crack plaster and the neighbours' wall tiles or damage services. A leaking pipe sometimes only shows up later as a damp patch.
Dust without protection. Concrete dust contains silica, which harms the lungs. Workers therefore need an FFP3 respirator, safety glasses, hearing protection and gloves. Without polythene sheeting, the dust also spreads through the whole house and settles in ventilation and furniture.
Mixed waste. Concrete mixed with plastics, timber and steel is harder to send for recycling and usually costs more to dispose of.
Edge reinforcement cut without thought. If a new slab is to be tied into the remaining one, protruding bars are often needed. If they are cut flush, new bars have to be drilled and resin-anchored later.
Props removed too early. If props under a structural slab are taken out before the structural engineer allows it, the remaining structure may sag or crack.
How to check the finished work
- the slab has been removed to the agreed extent and the edges are straight and sound,
- there are no new cracks in the part of the slab that remains,
- the reinforcement at the edges has been cut back or left as the structural engineer specified,
- surrounding walls, plaster and services are undamaged,
- props under a structural slab remain in place until the structural engineer decides on their removal,
- the edges of openings in a suspended slab are protected with guardrails or covered,
- the waste has been removed and you have a waste transfer note,
- the area is clear of rubble and dust and ready for the next work,
- windows, doors and floors along the route to the skip are not scratched or dirty.
Frequently asked questions
The guide price is €54.00 per m². The final amount depends on the amount of reinforcement, the hardness of the concrete, access, whether the slab is structural, edge cutting and above all waste removal. Check what the quote includes.
Yes, smaller areas are commonly broken out with a hand-held electric breaker. Without a breaker and tools for cutting the reinforcement, however, it is not realistic. With a sledgehammer alone, it is very slow and exhausting work.
It depends on the area, the amount of reinforcement and access. A small opening or part of a floor can usually be done in a few hours. A larger area including waste removal can take a day or more.
For work on the structure, expect building control to need to know about it. Check the procedure for your case with your local authority building control and have the structural engineer's calculations ready. In a block of flats, you also need consent from the freeholder or managing agent.
Reinforced concrete weighs about 2.5 tonnes per m³, so each m² of a 12 cm slab produces around 300 kg of rubble. Broken concrete takes up more space than the intact slab, so allow a margin when choosing the skip size.
Concrete goes to a recycling facility or to a landfill site for construction waste, and the steel reinforcement goes to a scrap metal dealer. The cleaner the waste is sorted, the easier it is to dispose of.
If the slab is sound and its level is not a problem, it can often serve as a base for new layers. Breaking out makes sense when the reinforcement is corroding, the slab is losing its strength, or new services have to run under it or the floor has to be lowered.
Related work
How a built-in wardrobe is removed, what makes the job harder, what to watch for with fixings and services, and how to check the result.
How a steel door frame is removed from a concrete wall, what makes the job harder, mistakes to avoid and how to check the opening before new doors.
How a brick partition up to 150 mm thick is demolished, what to check first, what makes the job harder and how to check the finished work.
How an old fitted kitchen is taken out, what a qualified professional must disconnect, what you can do yourself and how to check the room afterwards.
How a toilet riser partition is removed, what to watch for in a block of flats and how to check that the shared pipes stayed undamaged.
How old wall tiles are removed, what makes the job harder, how to protect pipes and cables, and how to check the wall before retiling.