Demolition of Solid or Facing Brickwork

Demolition of solid or facing brickwork means taking down a wall, or part of one, built from solid or facing bricks. The guide price is €16.00 per m², depending mainly on wall thickness, mortar strength and rubble removal.

Updated 09/2026·11 min read·25 price list items
Standard labour price
€16.00/ m²
Indicative range
€12.80 - €20.80
60 m² flat
€2400.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Demolition of Solid or Facing Brickwork

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Strip-out and demolition25 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Demolition and dismantling works cost

Demolish solid / fair-faced brickworkm²€16.00 / m²m²enter quantity-
Break out ceramic wall tilesm²m²-
Break out floor tilesm²€9.00 / m²m²enter quantity-
Remove bathpcs€45.00 / pcspcsenter quantity-
Remove WCpcs€25.00 / pcspcsenter quantity-
Remove basinpcs€17.00 / pcspcsenter quantity-
Demolish brick partition wall up to 150mm thickm²m²-
Demolish concrete wall / partitionm³€150.00 / m³m³enter quantity-
Demolish reinforced concrete slab up to 12 cmm²€54.00 / m²m²enter quantity-
Strip PVC or carpet floor coveringsm²€4.00 / m²m²enter quantity-
Remove floating floor (parquet, linoleum)m²€2.50 / m²m²enter quantity-
Remove door with timber framepcs€25.00 / pcspcsenter quantity-
Cutting concrete and removing steel door framepcspcs-
Break out metal door frame from concretepcs€45.00 / pcspcsenter quantity-
Remove panel radiatorpcs€35.00 / pcspcsenter quantity-
Remove cast iron radiatorpcs€45.00 / pcspcsenter quantity-
Remove plasterboard ceiling and structurem²€9.50 / m²m²enter quantity-
Complete demolition of prefabricated bathroom corepcspcs-
Strip old internal plasterm²€8.50 / m²m²enter quantity-
Remove kitchen unitpcspcs-
Break out fitted wardrobepcs€50.00 / pcspcsenter quantity-
Break out WC soil pipe enclosurepcs€35.00 / pcspcsenter quantity-
Remove window sillspcs€10.00 / pcspcsenter quantity-
Rubble removal and disposaltt-
Removal and disposal of asbestos / asbestos cementm²€20.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What the work involves and when it is needed

This item covers removing a wall, or part of a wall, built from solid bricks or from facing bricks left exposed without plaster. It is most often needed when changing the layout of an older house or flat. Typical jobs include knocking a kitchen through to a living room, forming a new opening, enlarging an opening for a window or door, or replacing damaged brickwork. Solid brick is strong and heavy. Taking it down takes more time and more care, and the removal of rubble needs to be planned properly.

Solid brickwork is found mainly in older buildings: Victorian and Edwardian terraces, period villas, older detached and semi-detached houses and brick-built blocks of flats. In concrete-framed blocks the material is reinforced concrete, which is a different job with different rules.

Solid and facing brickwork: the difference when demolishing

Solid brickwork was used in older buildings for both partitions and load-bearing walls. The thinnest partitions, with bricks laid on edge, can be only about 65 mm thick without plaster. Ordinary partitions are usually about 100 to 150 mm, while load-bearing and external walls are commonly 300 to 450 mm or more. The bricks are usually bedded in lime or lime-cement mortar. Old lime mortar often crumbles easily, while cement mortar holds firmly and slows the work down. For thinner internal walls, see also demolition of brick partitions.

Facing brickwork is brickwork built from facing bricks that was never plastered. It appears on elevations, indoors as a design feature, or in historic buildings. Demolishing it often means doing two things at once: removing one section without damaging the adjoining section that stays exposed. If the bricks are to be reused, the wall is taken down by hand, brick by brick, and the mortar is cleaned off.

The wall thickness can be roughly measured at a door opening or by the door lining. Plaster on both faces usually adds about 3 to 4 cm in total. A wall up to 10 cm including plaster is a thin partition, about 13 to 20 cm is a standard partition, and 30 cm or more is more likely load-bearing or external. This is only a guide. Whether a wall is load-bearing is for a structural engineer to decide.

Load-bearing wall or partition: what to arrange in advance

The first question is not how to demolish, but what the wall is holding up. Even an unassuming partition in an old house can brace the surrounding walls or, after many years, partly carry a floor or ceiling. Before taking down solid brickwork it is therefore worth bringing in a structural engineer. The engineer will assess whether the wall is load-bearing, whether the floor above needs temporary propping during the work and what lintel or beam should go over the new opening.

  • Building control: removing or altering a load-bearing wall falls under building regulations and needs building control approval. Check with the local authority building control or an approved inspector before work starts, rather than assuming nothing needs to be done. In Scotland, building or removing load-bearing walls needs a building warrant from the council before work starts.
  • Flat in a block: inform the freeholder, managing agent or management company and check the lease. Structural walls are usually not part of the leaseholder's demise and cannot be altered without consent.
  • Listed building or conservation area: for a listed building, contact the local planning authority, as listed building consent may be required.

It also helps to decide in advance what will happen after the demolition:

  • Whole wall or just an opening: for an opening, the exact width and height must be known, allowing for future door linings or sliding doors.
  • Floor: a strip without flooring will remain where the wall stood, often with a level difference between the rooms. Decide whether the floor will be patched, levelled or replaced throughout.
  • Ceiling and walls: an uneven strip will remain at the junctions and will need plastering. With facing brickwork, agree beforehand how the edge will be finished so that it looks clean.
  • Services: if the wall carries a socket, switch, water pipes or heating, decide where they will be moved.
  • Bricks: decide whether to keep them or let them go as rubble. Careful dismantling must be agreed before work starts, not during it.

How a brick wall is demolished step by step

  1. Have the structural engineer's details and the necessary approvals in hand.
  2. Find out what runs through the wall: electrics, water, waste pipes, ventilation ducts, gas. These must be isolated and disconnected by a professional - electrics by a qualified electrician, gas by a Gas Safe registered engineer. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
  3. Clear the room, cover floors, windows and doors with polythene sheeting and seal the work area off from the rest of the home. If a fitted unit stands against the wall, the demolition of a built-in wardrobe usually comes first.
  4. For a load-bearing wall, install temporary props to the floor or ceiling above as instructed by the structural engineer.
  5. If the opening needs straight, clean edges, cut its outline with a diamond blade, or with a wire saw on thick walls. Cutting is done before demolition so that hammering does not loosen the retained part of the wall.
  6. For an opening in a load-bearing wall, cut a pocket, install the new lintel or beam and allow it to bear as instructed by the engineer. Only then remove the brickwork below it.
  7. Demolish from the top down, course by course, checking continuously that the remaining brickwork is stable.
  8. Sort the rubble on site: bricks and mortar separately, metal, timber and plastics separately.
  9. Clean up the reveals and the junctions with the ceiling and floor, and remove the waste.

If gas can be smelt during the work, stop immediately, do not use electrical appliances or naked flames, ventilate, leave the area and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter. Call the emergency line, not your energy supplier.

By hand or by machine

Demolition by hand with a breaker, chisel and masonry saw is usual in flats and houses. It is more precise, causes less vibration in the structure and allows part of the wall or facing bricks to be kept. It is, however, slower and physically demanding.

Machine demolition with hydraulic breakers or small demolition robots suits thick external and load-bearing walls, larger areas or places where hand work is not possible. It is faster, but noisier and creates more vibration, which can damage surrounding structures. In practice the methods are often combined: the machine removes the bulk and the edges and junctions are finished by hand.

Every method produces a lot of dust. Damping down, dust extraction, a respirator, safety glasses and a hard hat are standard equipment, not extras.

Cost of demolishing a brick wall per m²

The guide price for labour is €16.00 per m². The measured area is the wall area, meaning the length times the height of the demolished section, less any openings already in the wall. The actual price is affected by the following:

  • Wall thickness: a price per m² applies to a given thickness. A 45 cm wall has roughly three times as many bricks and as much mortar per m² as a 15 cm partition, with matching labour and rubble. When comparing quotes, check which thickness the price refers to.
  • Function of the wall: a thin non-load-bearing partition is straightforward, while a thick load-bearing wall with props and a lintel is far more demanding. Props and lintels are usually charged as separate items and can raise the total considerably.
  • Mortar strength: crumbly lime mortar comes apart easily, hard cement mortar slows the work.
  • Keeping the bricks: careful dismantling of facing brickwork and cleaning the bricks takes much longer than ordinary demolition, often several times as long.
  • Accuracy of edges: an opening with cut edges costs more than rough demolition that is later plastered.
  • Plaster and tiling: if the wall is tiled or heavily plastered, removing these may be a separate item.
  • Height and access: tall rooms needing scaffolding, upper floors without a lift, narrow stairs or no space for a skip all lengthen the work and the removal of rubble.
  • Volume of rubble: one cubic metre of solid brickwork produces roughly one and a half to almost two tonnes of waste, and once broken it takes up more space than in the wall. For example, a 3 × 2.6 m partition 15 cm thick contains about 1.2 m³ of brickwork, roughly two tonnes of rubble. Carrying out, the skip and the disposal fee are often charged separately.
  • Hidden surprises: buried services, steel beams in the brickwork or metal door frames set in concrete add work - see demolition of metal door frames set in concrete.
  • Occupied premises: in a lived-in building, quiet hours must be respected and the surroundings protected more thoroughly, which slows the work.

What makes the work easier and what delays it

When a site is waiting for paperwork or another tradesperson, demolition stops. It helps to have the following ready:

  • Documents on the start date: the structural engineer's details, consent from the freeholder or managing agent and the building control approval. Without them, a responsible contractor should not take down a load-bearing wall.
  • Trades for disconnection: book the electrician, plumber or gas engineer early enough for them to finish before the demolition crew arrives. Show where the consumer unit and the main stopcock are.
  • Cleared spaces: remove furniture and belongings from the room and from the route used to carry out rubble. Dust will reach neighbouring rooms too, so wardrobes, electronics and textiles are best moved or well wrapped.
  • Space for a skip: if it is to stand on the road or pavement, a skip permit from the council is usually needed. Arrange it in advance.
  • Agreement with the building: tell neighbours the dates and the noisy days. If rubble is to go down in a lift, agree with the managing agent whether this is allowed and how the car will be protected.
  • Power and water: tools need a socket protected by a circuit breaker and an RCD, because water is used for damping down. If power in the room has to be off, a supply from another room helps.
  • Clear brief: mark the extent directly on the wall and agree in writing what the price includes, for example carrying out, removal and making good the reveals. Changes in scope during demolition cause delays.

Typical mistakes and how they show later

Demolishing without a structural engineer because the wall looks thin. The result can be cracks, a sagging ceiling or damage to neighbouring flats. Cracks sometimes appear only weeks later, as the structure settles into its new state.

Missing approval or consent from building control, the freeholder or the managing agent. Sorting it out retrospectively tends to be slow and unpleasant, and the problem often surfaces only when the property is sold.

Lintel installed only after the opening is cut. Without support, the brickwork above the opening can loosen or drop. Even if nothing collapses, cracks form above the opening.

Props removed too early. If props come out before the lintel and its padstones or packing have cured, the lintel can deflect and the plaster above the opening cracks.

Heavy blows near the edge. Using a large hammer right up to the edge of the opening loosens bricks in the retained wall. The reveal is then hollow and crumbly, and neither the door lining nor plaster holds well.

Overlooked services in the wall. A punctured pipe can flood the home or the neighbour below, and a severed cable may still be live.

Work area not sealed off. Fine brick and mortar dust gets into the whole home, the ventilation and electronics. The clean-up then takes longer than the demolition itself.

Skip too small. Solid brick is heavy and a skip fills faster than expected. Allow a margin and check the permitted load weight, not just the volume.

Rubble in household waste. Construction waste belongs at a household recycling centre, a recycling facility or in a skip from a registered waste carrier. As a householder you have a duty of care, so check that the carrier is registered with the Environment Agency and ask for a waste transfer note.

Choosing a contractor on price alone. Check experience, references and public liability insurance. When demolishing in a block of flats, neighbours can suffer damage too.

Checking the finished work

At handover it is worth going through these points:

  • the brickwork has been removed to the agreed extent and the edges of the opening are straight and firm,
  • when the reveal is tapped, bricks do not sound hollow or fall out,
  • the opening dimensions match the agreement and the future door linings or doors,
  • surrounding walls, ceiling and floor show no new cracks or deflection,
  • the lintel is installed as specified by the engineer and the temporary props were removed only at the agreed time,
  • nearby services are made safe, terminated or reconnected by a professional,
  • adjoining facing brickwork is undamaged,
  • retained bricks are stacked and cleaned, if this was agreed,
  • there is no damage in neighbouring properties or common parts, such as cracks or a damaged staircase,
  • the rubble has been removed and there is proof of its disposal,
  • the area is clean and ready for the next works.

For an overview of related jobs and their sequence, see demolition work.

Frequently asked questions

The guide price is €16.00 per m² of wall area. The final amount depends mainly on wall thickness, mortar strength, props and a lintel for a load-bearing wall, careful dismantling of facing bricks and whether carrying out and removing rubble are included.