Building work price list: Demolition of the old kitchen unit
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Demolition and dismantling works cost | ||||
| Remove kitchen unit | pcs | €70.00 / pcs | pcs | enter quantity- |
| Break out ceramic wall tiles | m² | m² | - | |
| Break out floor tiles | m² | €9.00 / m² | m² | enter quantity- |
| Remove bath | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove WC | pcs | €25.00 / pcs | pcs | enter quantity- |
| Remove basin | pcs | €17.00 / pcs | pcs | enter quantity- |
| Demolish brick partition wall up to 150mm thick | m² | m² | - | |
| Demolish solid / fair-faced brickwork | m² | m² | - | |
| Demolish concrete wall / partition | m³ | €150.00 / m³ | m³ | enter quantity- |
| Demolish reinforced concrete slab up to 12 cm | m² | €54.00 / m² | m² | enter quantity- |
| Strip PVC or carpet floor coverings | m² | €4.00 / m² | m² | enter quantity- |
| Remove floating floor (parquet, linoleum) | m² | €2.50 / m² | m² | enter quantity- |
| Remove door with timber frame | pcs | €25.00 / pcs | pcs | enter quantity- |
| Cutting concrete and removing steel door frame | pcs | pcs | - | |
| Break out metal door frame from concrete | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove panel radiator | pcs | €35.00 / pcs | pcs | enter quantity- |
| Remove cast iron radiator | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove plasterboard ceiling and structure | m² | €9.50 / m² | m² | enter quantity- |
| Complete demolition of prefabricated bathroom core | pcs | pcs | - | |
| Strip old internal plaster | m² | €8.50 / m² | m² | enter quantity- |
| Break out fitted wardrobe | pcs | €50.00 / pcs | pcs | enter quantity- |
| Break out WC soil pipe enclosure | pcs | €35.00 / pcs | pcs | enter quantity- |
| Remove window sills | pcs | €10.00 / pcs | pcs | enter quantity- |
| Rubble removal and disposal | t | t | - | |
| Removal and disposal of asbestos / asbestos cement | m² | €20.00 / m² | m² | enter quantity- |
What kitchen removal involves and when it is needed
An old kitchen has to come out when a new one is planned, when water and electrical points are being moved, or when the wall or floor behind it needs repair. The aim is to leave walls, floor and services intact. A careful strip-out saves a lot of work when the new kitchen is fitted. It is one of the common jobs within demolition and strip-out work.
The job is more than unscrewing cabinets. It normally covers wall units and base units, the worktop, the sink with tap and trap, the cooker hood, oven, hob, dishwasher and integrated fridge. Removing the tiled splashback between the units or the plinths at floor level is often added.
If there is an old built-in wardrobe or larder in or next to the kitchen that is fixed firmly to the masonry, ceiling or floor, it is usually taken out at the same stage. Such units are held with plugs and fixings or boxed in with plasterboard, so they need a more careful approach. More detail is in the article on removing a built-in wardrobe.
What to decide before the removal
The removal itself takes a few hours, but the decisions around it affect the whole kitchen refurbishment. It pays to have them settled before the tradesperson arrives.
- Scrap or keep: if the units are to be sold, given away or reused in a garage or loft, say so in advance so they are not broken up as waste.
- Appliances: decide which appliances will go into the new kitchen. These are removed carefully and stored away from dust, the rest go for recycling as electrical waste.
- Splashback tiles: a new kitchen often has a different worktop height and unit layout. The old tiles then no longer fit, and it is sensible to hack them off at the same time. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
- Floor under the units: in many homes the floor tiles or other covering were never laid under the base units. If the new layout differs, a bare screed or subfloor may be exposed and has to be allowed for.
- Waste: agree whether the contractor takes the waste away or whether you arrange it yourself. As a householder you have a duty of care for your waste, so before you hand over renovation rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Changes to services and walls: removing kitchen furniture on its own does not normally need any approval. If you also plan to move services, knock down a partition or alter shared pipework in a flat, check the requirements with local authority building control and, in a block of flats, with the freeholder or managing agent. Shared stacks and load-bearing walls are not yours alone to alter, and work on them needs consent and a competent professional. For the wall work itself, see demolition of brick partitions.
How the removal is carried out step by step
- Clearing and protection: the kitchen is emptied and the floor is covered with cardboard or heavy-duty protective sheeting.
- Gas disconnection: a gas cooker or gas hob may only be disconnected by a Gas Safe registered engineer. The engineer caps the pipe safely and tests it for tightness.
- Electrical disconnection: a hard-wired hob and oven, usually fed through a cooker switch or connection unit, are disconnected by a qualified electrician. After switching off at the consumer unit, the electrician confirms with a voltage tester that the cables are dead, because a kitchen can be supplied by more than one circuit. Plug-in appliances simply need unplugging.
- Disconnecting the sink: the isolating valves are closed and the tap tails and trap are unscrewed. The waste pipe in the wall is capped straight away so that no smells come back.
- Integrated appliances: the dishwasher, oven and fridge are pulled out and unscrewed from the carcasses.
- Worktop: it is usually fixed from below with screws through brackets and sometimes sealed to the wall with silicone. The silicone is cut, the screws are released and two people lift the worktop off.
- Wall units: work goes from the top down. Newer units hang on brackets or a hanging rail, so loosening the adjustment screws and lifting the unit is enough. Older kitchens are often screwed straight through the back panel. Once the last screw is out the unit can drop, so a second person holds it at all times.
- Base units: they are often screwed together and fixed to the wall. They are separated first and then unscrewed from the wall.
- Additional work: if agreed, the splashback tiles, plinths or a built-in wardrobe are removed next.
- Waste removal: chipboard, metal parts, glass and old appliances go into separate streams, and old appliances are handed in as electrical waste.
What affects the price
The guide labour price in the price list is €70.00 per piece. The simplest case is a straight run of standard units standing on legs and hanging on brackets. Time, difficulty and therefore price go up in these situations:
- Size and shape: an L-shaped or U-shaped kitchen, an island and tall housings for appliances mean more joints and more pieces to carry out. A large U-shaped kitchen can take roughly twice as long as a short straight run.
- Materials: solid timber, stone or compact laminate worktops and metal frames are heavy and sometimes have to be cut on site. A stone worktop needs several people to carry it, which raises the cost considerably.
- Fixing method: units stuck with expanding foam, siliconed to the tiles or built into the masonry come apart slowly.
- Access: a narrow kitchen, no lift and carrying from an upper floor all add time.
- Extra scope: hacking off tiles, ripping up an old floor or removing a built-in wardrobe add further work and are normally priced separately. The same applies to related jobs such as removing metal door frames set in concrete.
- Keeping the units: careful dismantling without breaking takes longer than stripping out for scrap.
- Waste removal: an old kitchen takes up a large volume, so disposal is usually a separate item on the quote.
Disconnection of gas and hard-wired appliances is also usually charged separately. When comparing quotes, it is worth asking exactly what is included.
What makes the job easier and what slows it down
A lot of time is lost on things that have nothing to do with the dismantling. The customer can help by:
- emptying all units before the tradesperson arrives, including food, crockery and anything on top of the wall units,
- knowing where the main stopcock is and which circuit in the consumer unit serves the kitchen,
- booking the gas engineer and electrician earlier or for the same day, so nobody waits for the disconnection,
- in a block of flats, informing the managing agent and neighbours and, where possible, protecting the lift and communal hallway during carrying,
- arranging parking for the van or booking a skip in advance, with a permit if it stands on the road,
- clearing the route from the kitchen to the front door so long panels can be carried out without manoeuvring,
- setting up a temporary cooking area and storage for the duration of the refurbishment.
Typical mistakes and how they show up later
Ripping units off with a crowbar. It pulls away chunks of plaster and tiles that then need repairing, and adds extra work before the new kitchen can be fitted.
Water not isolated or waste not capped. One broken tap tail is enough for water to soak into the floor or leak to the neighbours below. An uncapped waste also lets smells spread through the home.
DIY gas disconnection. It is dangerous, and work on gas appliances is restricted by law to Gas Safe registered engineers.
Forgotten circuit or voltage not checked. Bare cables left by the hob stay live and endanger everyone working in the kitchen. This happens mainly when only one of several circuits is switched off.
Underestimating the wall behind the units. Behind units that stood against the wall for years there may be mould, damp or greasy plaster. If nobody allowed for the repair, the fitting date for the new kitchen slips.
Pulling fixings out blindly. Extracting wall plugs can damage a cable or pipe in the wall. The fault only appears later as a dead socket or a damp patch.
Leaving waste by the household bins. Furniture and building waste belong at the household waste recycling centre or in a booked skip, according to your council's rules.
How to check the room after removal
Before the new kitchen fitters arrive, go through the room using this list:
- the gas pipe has been capped by a Gas Safe registered engineer and you have a record of the work,
- cables left by appliances are safely terminated and the circuit is labelled,
- isolating valves are closed and not dripping,
- the waste pipe is capped and there is no smell from the drain,
- walls have no torn-out plaster or tiles, and any damage has been noted,
- the floor is free of gouges and wet patches,
- there is no mould or damp behind the old units, or you know how it will be dealt with,
- units and appliances you wanted to keep are undamaged and stored,
- old appliances have been handed in as electrical waste and the remaining waste has been taken away,
- the room is swept and ready for the new kitchen to be measured.
DIY guide: removing a kitchen without damaging walls and services
The units and worktop themselves can be handled with ordinary tools and a helper. If you smell gas while working, do not operate electrical switches or use any naked flame, open the windows, leave the property and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.
- Empty all units and cover the floor with cardboard.
- Have a Gas Safe registered engineer disconnect the gas cooker, and a qualified electrician disconnect any hard-wired hob or oven.
- Switch off the relevant circuit and unplug plug-in appliances.
- Close the isolating valves under the sink, put a bucket underneath and disconnect the tap and trap.
- Cap the waste pipe in the wall with a suitable blanking cap.
- Pull out the integrated appliances and unscrew them from the carcasses.
- Cut the silicone between worktop and wall with a knife, release the screws from below and lift the worktop with a second person.
- Take off the doors and remove the shelves so the units are lighter.
- Loosen the brackets or screws of the wall units and lift them down, with one person holding the unit.
- Separate the base units, unscrew them from the wall and carry them out.
- Pull out or cut off any remaining wall plugs and sort the waste.
When drilling or pulling out fixings, remember that cables and pipes run in the wall behind the kitchen. If you are unsure of their route, use a detector or cut the fixings off flush instead. Wear work gloves when handling the worktop and glass, and safety glasses when hacking off tiles.
Frequently asked questions
As a guide €70.00 per piece, i.e. per kitchen. The price goes up for a corner or large kitchen, a heavy stone worktop, glued or built-in units, poor access without a lift, and extra work such as hacking off tiles or waste removal.
Yes, if it is dismantled carefully. Units in good condition suit a garage, utility room or workshop, or they can be sold or given away.
An experienced tradesperson can usually take out a standard kitchen in a few hours. If tile removal, a built-in wardrobe or an old floor is added, the job can stretch to a full day.
Removing the furniture alone usually does not need notice. However, noise, carrying waste through communal areas and any work on shared pipework or services should be discussed with the freeholder or managing agent, and for building alterations also with local authority building control.
A gas appliance may only be disconnected by a Gas Safe registered engineer, who caps the pipe and tests it for tightness. In the same way, a hard-wired electric hob should be disconnected by a qualified electrician.
Chipboard and furniture belong at the household waste recycling centre or in a skip for bulky and building waste, and old appliances go to electrical waste recycling. Check the specific rules and conditions with your local council.
Often, yes. Holes from fixings remain behind the kitchen, and sometimes the plaster is greasy or damp. If the tiling or unit layout is changing, the wall is repaired and made good by a plasterer before the new kitchen is fitted. It is sensible to include this work in the budget from the start.
Related work
How a built-in wardrobe is removed, what makes the job harder, what to watch for with fixings and services, and how to check the result.
How a steel door frame is removed from a concrete wall, what makes the job harder, mistakes to avoid and how to check the opening before new doors.
How a brick partition up to 150 mm thick is demolished, what to check first, what makes the job harder and how to check the finished work.
How a toilet riser partition is removed, what to watch for in a block of flats and how to check that the shared pipes stayed undamaged.
How old wall tiles are removed, what makes the job harder, how to protect pipes and cables, and how to check the wall before retiling.
How floating floors, parquet and lino are removed, what makes the job harder, what to watch for in the subfloor and how to check the result.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.