Demolition Work: cost of demolition per m² and m³ 2026, process and waste removal

Demolition and strip-out means breaking out floors and tiles, knocking down partitions and concrete, taking out fittings and clearing the rubble. What you pay depends mostly on what is coming down and how thick it is, how easy the site is to get to, and how much rubble has to leave the building.

Updated 09/2026·14 min read·27 price list items
Standard labour price
€150.00/ m³
Indicative range
€120.00 - €195.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page
Short answer

Knocking down a concrete wall or partition costs €150.00 per m³ of labour, based on the current price list. Breaking out tiles is priced per m², and taking out fittings per item. Rubble removal and disposal is always a separate item charged per tonne, because you can't judge the weight of rubble from the area alone.

Types of work and their prices

€150.00
per m³
Demolishing Concrete Structures

The hardest and slowest part of demolition work. It requires a breaker hammer, sometimes core drilling where reinforcement is tied in, and confirmation that the structure is not load-bearing.

€9.00
per m²
Breaking Out Tiling and Flooring

A standard part of a bathroom or kitchen renovation. Adhesive and an old levelling layer are usually found under the tiles and need to be removed down to the original substrate.

€54.00
per m²

Breaking through ceilings and slabs is done after consulting a structural engineer, since the reinforcement and adjoining bays may be load-bearing. It requires temporary support and securing the surrounding area.

€45.00
per pcs

The bath, basin and toilet are disconnected from the services and removed whole before flooring is demolished, minimising waste and damage to surrounding tiling.

€9.50
per m²
Removing Ceilings and Partitions

Plasterboard structures are removed together with the supporting grid. The void above a ceiling often hides services that need to be disconnected first.

€8.50
per m²
Hacking Off Old Render

Salt-damaged, hollow or moisture-damaged render is hacked off down to the masonry. The work is dusty and needs continuous ventilation of the space.

Demolition work price list 2026

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Strip-out and demolition27 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Demolition and dismantling works cost

Demolish concrete wall / partitionm³€150.00 / m³m³enter quantity-
Break out ceramic wall tilesm²m²-
Break out floor tilesm²€9.00 / m²m²enter quantity-
Remove bathpcs€45.00 / pcspcsenter quantity-
Remove WCpcs€25.00 / pcspcsenter quantity-
Remove basinpcs€17.00 / pcspcsenter quantity-
Demolish brick partition wall up to 150mm thickm²m²-
Demolish solid / fair-faced brickworkm²m²-
Demolish reinforced concrete slab up to 12 cmm²€54.00 / m²m²enter quantity-
Strip PVC or carpet floor coveringsm²€4.00 / m²m²enter quantity-
Remove floating floor (parquet, linoleum)m²€2.50 / m²m²enter quantity-
Remove door with timber framepcs€25.00 / pcspcsenter quantity-
Cutting concrete and removing steel door framepcspcs-
Break out metal door frame from concretepcs€45.00 / pcspcsenter quantity-
Remove panel radiatorpcs€35.00 / pcspcsenter quantity-
Remove cast iron radiatorpcs€45.00 / pcspcsenter quantity-
Remove plasterboard ceiling and structurem²€9.50 / m²m²enter quantity-
Complete demolition of prefabricated bathroom corepcspcs-
Strip old internal plasterm²€8.50 / m²m²enter quantity-
Remove kitchen unitpcspcs-
Break out fitted wardrobepcs€50.00 / pcspcsenter quantity-
Break out WC soil pipe enclosurepcs€35.00 / pcspcsenter quantity-
Remove window sillspcs€10.00 / pcspcsenter quantity-
Rubble removal and disposaltt-
Removal and disposal of asbestos / asbestos cementm²€20.00 / m²m²enter quantity-

Other works

Other unspecified workshrhr-
Transport and hazardous waste disposal of asbestos / transitet€245.00 / ttenter quantity-
Total labour
- enter quantity
Create quote from price list →

How much it costs by scope

Model Scope of Demolition Work for a Bathroom Renovation (10 m²)
Floor Demolition Only
Breaking out 10 m² of tiling.
€90.00
Floor Demolition and Removing Fittings
Breaking out 10 m² of tiling, removing the toilet, basin and bath.
€177.00
Full Strip-Out Including Render and a Partition
Breaking out tiling, removing fittings, hacking off 10 m² of render and demolishing 1 m³ of concrete partition.
€412.00
Indicative total labour based on the quantities shown. Removal and disposal of debris is charged separately per tonne according to the actual weight of waste.

Preparation before demolition

01
Protecting the site and surroundings

Doors and corridors are sealed off with sheeting to keep the dust in. Any furniture or fittings that would get in the way or could get damaged are moved out first.

02
Switching off the services

Before work starts, the water, electricity and heating in the area are safely switched off and isolated. Skip this and you risk hitting a live service or causing a water leak.

03
Taking out the fittings

The bath, basin, toilet and radiators come out in one piece before the floors and partitions go. That way they can be carried out without damaging the door openings.

€45.00/pcs
04
Breaking out floors and tiles

The tiles and the old levelling layer come up right down to the solid base, so the new floor bonds properly.

€9.00/m²
05
Knocking down checked, non-load-bearing walls

Partitions and concrete only come down once it's confirmed they don't carry any load. If there's any doubt, a structural assessment makes the call, not a guess on site.

€150.00/m³

Method of work

  1. 01Visiting the site, agreeing what comes out and checking which walls carry load.
  2. 02Protecting the site and nearby surfaces, then switching off the services.
  3. 03Taking out the fittings, doors and frames that are in the way of the demolition.
  4. 04Breaking out floors, tiles and render as agreed.
  5. 05Knocking down partitions, walls and concrete with a breaker or by cutting.
  6. 06Sorting the rubble as the work goes, keeping scrap metal apart from building rubble.
  7. 07Loading the rubble and taking it to a licensed disposal site, with a waste disposal certificate.
  8. 08Handing over a clean space, ready for the next trades.

5 common mistakes

01
Knocking down a load-bearing wall unchecked

Even a thin partition can be holding the walls around it steady. In a block of flats, or for a larger opening, get a structural engineer's opinion before anything comes down.

02
Leaving the services connected

Hit a cable or pipe hidden under the render and you get damage and a delayed job. Always check and disconnect the services before demolition starts.

03
Underestimating the rubble removal

Rubble weighs a lot more than it looks. If nobody estimates the weight, the removal budget often doesn't add up.

04
Not protecting the surrounding rooms

Dust and rubble damage nearby surfaces and fittings. Sheet off the space and close it off from other rooms before demolition starts.

05
Not knowing what's under the surface

There can be a thicker layer under the tiles or render than you'd expect. Confirm the scope once the first layer is off, not just from the area.

Load-bearing or not: why wall thickness is not enough

Before you take the first swing at a wall, you need to know whether it is load-bearing or bracing. A bracing wall may not hold up the ceiling, but it keeps the building stiff and stops the structure from twisting. A popular rule of thumb says a thin wall is a partition and a thick one is load-bearing. You cannot rely on it. In concrete panel blocks, walls that look like ordinary partitions often brace the structure. In older houses, a thin brick wall sometimes carries the floor above, or someone later rested joists on it without anyone noticing.

The building's drawings and an assessment by a structural engineer give you a reliable answer. The engineer also looks at what the neighbours above and below you have already changed. Every alteration to the structure adds up, and something harmless on its own can cause trouble once it is combined with other changes. If you live in a block of flats, you must agree any work on load-bearing structures with the building management or the owners' association. You will usually also need approval under local building regulations. Ask your local building authority in advance which procedure applies to your case, and do not assume that a simple notification is enough. If the wall is shared with a neighbouring property, some countries also require you to give your neighbour formal notice before you start, so check the local rules on shared walls too.

If a load-bearing wall comes out completely or you want a larger opening in it, the structural engineer designs what will take over the load. This is often a steel beam or a precast lintel. The engineer also specifies how the ceiling must be propped during the works, usually with adjustable steel props, so that nothing moves before the new support is in place.

Hidden services and safety

Walls and floors hide electrical cables, water pipes, drainage and sometimes gas. Before you start, switch off the circuit breakers for the circuits involved and shut off the water. Never disconnect gas yourself: this must be done by a qualified, registered gas engineer. If you smell gas during the work, stop immediately, do not switch any electrical appliances or lights on or off, open the windows, leave the property and call the local gas emergency number or 112.

Trace the routes of cables and pipes with a detector and mark them on the wall in pencil or marker. In older flats and houses you cannot count on cables running straight up and down or level across. In practice it often happens that a cable turns up running diagonally across the middle of a wall, exactly where nobody expected it.

Demolition works from the top down, in small pieces. Why not push the whole wall over at once? A large chunk of masonry falling in one go damages the floor and the services in it, and in a panel block it can even crack the tiles in the flat below. In a block of flats, find out before you start where the risers run and where their shut-off valves are, so you can turn the water off quickly if something goes wrong.

Dust, noise and neighbours

Breaking and chiselling concrete, brick and plaster produces fine dust that contains quartz (crystalline silica). Breathed in over a long period, it damages the lungs. So wear a respirator with a high protection class, seal off the work area with plastic sheeting and tape up the doors to other rooms. When cutting, use water or tools connected to a dust extractor that removes the dust right where it is created.

When you are allowed to make noise is set by the house rules of your building and by local regulations. They tell you on which days and at what times noisy work is permitted. Let your neighbours know in advance when you will start and how long it will take. Most people put up with noise far more easily when they know what to expect. Protect the hallway, staircase and lift from dust and knocks. If anything in the common areas is damaged, the person who ordered the work is responsible for it.

Bathroom pods, floors and tiles

Some panel blocks have prefabricated bathroom pods with laminate panels. These come apart step by step: first the sanitary fittings, meaning the bath, basin and toilet, then the tiles and the pod panels, and the floor goes last. The risers and shut-off valves must keep working until the plumber replaces or reconnects them. Many people are surprised how much material comes out of a single pod. It usually fills a whole skip.

Under floor tiles you will often find another layer of old tiles, a thick cement screed or floor layers containing clinker or ash. How much really has to come out only becomes clear after a test opening, a small trial hole in the floor. With wall tiles, decide whether you will remove just the ceramics or the plaster behind them as well. If the plaster comes away with the tiles, the wall will need replastering.

Ash and clinker fill in old buildings

In older brick buildings, clinker and coal ash were used to fill ceilings and floors, often between the joists as sound insulation (known in the UK as pugging). It is heavy, dusty, often damp and may contain harmful substances left over from burning coal. Wear a respirator when you remove it and keep dampening it so it does not raise dust. How it should be disposed of depends on what an assessment of the material shows. If you are taking it out of a timber ceiling, be careful not to damage the boards laid over the joists, or the joists themselves.

Asbestos: when demolition is not a job for an ordinary contractor

Buildings constructed or refurbished before roughly the year 2000 may contain asbestos, and the older the building, the more likely it is. Typical places are asbestos cement slates and corrugated sheets on roofs, facade cladding, drainage risers in some panel blocks, old floor tiles and coverings, pipe and boiler insulation, insulating boards and some textured wall and ceiling coatings. As long as asbestos material is intact, it is relatively safe. The danger comes from fibres released when it is broken, cut or sanded, which then end up in the lungs.

Asbestos may only be removed by a company licensed or approved for this work. It seals off the work area, dampens the material, takes it down in whole pieces where possible, packs it in labelled bags and takes it to a hazardous waste site. Anyone who simply smashes an asbestos roof or riser during a renovation and throws it in a skip breaks the law and puts the health of the workers and everyone living in the building at risk. If you are not sure whether a material contains asbestos, have it tested or surveyed by a professional before demolition starts.

Rubble: volume, weight and sorting

Broken material bulks up, so it takes up more space than the original wall. It is also heavy: a cubic metre of concrete weighs roughly more than two tonnes. That is why skips have a weight limit as well as a volume limit. With concrete it often happens that the skip is full by weight while it still looks half empty. When you plan the removal, think in terms of weight, not the number of bags.

If the skip has to stand on a public road or pavement, you will usually need permission from the local council, which the skip hire company can often arrange. Sorting the waste pays off. Clean concrete and brick are easier to recycle than mixed waste containing timber, plastic, plasterboard and insulation. Metals can go to a scrap collection point. Keep the waste transfer notes or receipts, as the building authority asks for them on some projects.

Breaking or cutting

Breaking out with a demolition hammer is fast, but it comes at a cost. The vibration travels through the whole structure, cracks the surrounding plaster and tiles, and in load-bearing elements it can weaken the masonry or concrete. Openings in concrete, load-bearing walls and panels are therefore made by diamond wall sawing or core drilling. The cut is accurate, there is no vibration and less dust. The edges of the opening stay straight, so they do not need repairing afterwards.

A chimney is taken down by hand from the top downwards, so that debris does not fall into the flues or onto the roof. Before removing a chimney, check that no other flat or appliance still uses it. Once it is down, the opening in the roof must be closed and properly sealed, otherwise rain will get into the house.

DIY guide: removing old tiles

You can remove old ceramic tiles in a bathroom or kitchen yourself, as long as you are not knocking down walls or touching the services. It takes patience and good protection.

  1. Switch off the circuit breakers for the room, shut off the water and remove sockets, taps and accessories.
  2. Cover the floor with thick cardboard or boards and tape plastic sheeting over the door to keep the dust in.
  3. Put on safety glasses, gloves, a respirator and work boots with firm soles.
  4. Start at the top edge of the tiling or at a corner where a tile comes loose most easily, and drive the chisel flat under the tile, not straight into the wall.
  5. Use an electric chipping hammer with a flat chisel, or a hand chisel and hammer. On a hard wall, work slowly so the plaster does not break away in large pieces.
  6. Collect the debris as you go in strong bags and do not overfill them, so you can still carry them.
  7. Once the tiles are off, knock away loose plaster and leftover adhesive so the surface for the new tiles is sound.
  8. If a cable or pipe appears somewhere you did not expect it, stop work and call a professional.

Handover after demolition

  • The demolition matches the agreed scope and load-bearing structures are untouched or secured as specified by the structural engineer
  • Services that were meant to stay are undamaged and their open ends are capped and secured
  • The rubble has been removed and you have the waste transfer notes or receipts
  • The common areas of the building are clean and undamaged
  • The surfaces are ready for the next trades, with no loose plaster or adhesive left

Frequently asked questions

Knocking down a concrete wall or partition costs €150.00 per m³ of labour, based on the current price list. If the concrete is reinforced or thicker, the work goes slower and is harder on the equipment.

Related work

Demolition and dismantling works
Demolition of a built-in wardrobe

How a built-in wardrobe is removed, what makes the job harder, what to watch for with fixings and services, and how to check the result.

Demolition and dismantling works
Demolition of metal door frames (concrete)

How a steel door frame is removed from a concrete wall, what makes the job harder, mistakes to avoid and how to check the opening before new doors.

Demolition and dismantling works
Demolition of partitions - brick

How a brick partition up to 150 mm thick is demolished, what to check first, what makes the job harder and how to check the finished work.

Demolition and dismantling works
Demolition of the old kitchen unit

How an old fitted kitchen is taken out, what a qualified professional must disconnect, what you can do yourself and how to check the room afterwards.

Demolition and dismantling works
Demolition of the old riser toilet partition wall

How a toilet riser partition is removed, what to watch for in a block of flats and how to check that the shared pipes stayed undamaged.

Demolition and dismantling works
Removal of tiles and paving

How old wall tiles are removed, what makes the job harder, how to protect pipes and cables, and how to check the wall before retiling.

Demolition and dismantling works
Removal of old floating floors (parquet, linoleum)

How floating floors, parquet and lino are removed, what makes the job harder, what to watch for in the subfloor and how to check the result.

Demolition and dismantling works
Removal of prefab bathroom pods

How a prefab bathroom pod in a block of flats is fully stripped out, what to agree with building management, and how to protect risers and drains.

Demolition and dismantling works
Bath removal

How a bath is removed, how cast iron, steel and acrylic baths differ, what to consider in a flat and how to check the space afterwards.

Demolition and dismantling works
Removing a washbasin

How a washbasin is removed, what makes the job easier or harder, and how to avoid damaging tiles, isolation valves or the waste pipe.

Demolition and dismantling works
Demolition of Solid or Facing Brickwork

How solid and facing brickwork is taken down, when you need a structural engineer and approval, what to do with the rubble and how to check the work.

Demolition and dismantling works
Breaking Out (Demolition) of Reinforced Concrete Slab up to 12 cm

How a reinforced concrete slab up to 12 cm thick is broken out, what to check first, which tools to use and how to inspect the finished work.

Demolition and dismantling works
Asbestos and asbestos cement removal

How asbestos and asbestos cement roofs are removed, who may do the work, what is notified, where the waste goes and how to check the contractor's method.

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.