Price list 2026 · Europe

Demolition of a built-in wardrobe

Demolishing a built-in wardrobe means removing a wardrobe fixed to the wall, ceiling or floor. As a guide it costs €50.00 per piece. Size, materials, any masonry and waste removal affect the price.

Updated 09/2026·10 min read·25 price list items
Standard labour price
€50.00/ pcs
Indicative range
€40.00 - €65.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Demolition of a built-in wardrobe

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Strip-out and demolition25 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Demolition and dismantling works cost

Break out fitted wardrobepcs€50.00 / pcspcsenter quantity-
Break out ceramic wall tilesm²m²-
Break out floor tilesm²€9.00 / m²m²enter quantity-
Remove bathpcs€45.00 / pcspcsenter quantity-
Remove WCpcs€25.00 / pcspcsenter quantity-
Remove basinpcs€17.00 / pcspcsenter quantity-
Demolish brick partition wall up to 150mm thickm²m²-
Demolish solid / fair-faced brickworkm²m²-
Demolish concrete wall / partitionm³€150.00 / m³m³enter quantity-
Demolish reinforced concrete slab up to 12 cmm²€54.00 / m²m²enter quantity-
Strip PVC or carpet floor coveringsm²€4.00 / m²m²enter quantity-
Remove floating floor (parquet, linoleum)m²€2.50 / m²m²enter quantity-
Remove door with timber framepcs€25.00 / pcspcsenter quantity-
Cutting concrete and removing steel door framepcspcs-
Break out metal door frame from concretepcs€45.00 / pcspcsenter quantity-
Remove panel radiatorpcs€35.00 / pcspcsenter quantity-
Remove cast iron radiatorpcs€45.00 / pcspcsenter quantity-
Remove plasterboard ceiling and structurem²€9.50 / m²m²enter quantity-
Complete demolition of prefabricated bathroom corepcspcs-
Strip old internal plasterm²€8.50 / m²m²enter quantity-
Remove kitchen unitpcspcs-
Break out WC soil pipe enclosurepcs€35.00 / pcspcsenter quantity-
Remove window sillspcs€10.00 / pcspcsenter quantity-
Rubble removal and disposaltt-
Removal and disposal of asbestos / asbestos cementm²€20.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

When a built-in wardrobe is removed and what types exist

A built-in wardrobe is most often removed during a flat or house refurbishment, often alongside other strip-out jobs such as the removal of an old kitchen unit. The old wardrobe takes up space or no longer suits the new layout. Its space may be used for new flooring or a new storage system. Sometimes only the timber parts need to come out. Other times masonry has to be broken out. For an overview of related jobs, see demolition work. How hard the job is depends on the type of wardrobe:

  • Timber or chipboard wardrobe in an alcove: the carcass, shelves and doors are screwed to the wall and ceiling. This is more dismantling than demolition.
  • Wardrobe with a plasterboard or chipboard front: part of the wardrobe is a stud partition separating it from the room. The partition has to be cut out and removed together with its studs and tracks.
  • Masonry wardrobe: in older houses and flats the sides or back are often built from brick or block. This is masonry demolition, similar to the demolition of brick partitions.
  • Wardrobe with services: it has internal lighting, a socket or hidden access to services, such as a water meter or a communal riser.

A capable DIYer can take apart a timber wardrobe in a few hours. With a masonry wardrobe, it must be checked whether the wall carries any load. Allow for dust, rubble and larger repairs afterwards.

What to agree and prepare before work starts

  • Scope of work: agree whether only the carcass and doors come out, or also the front, masonry sides, trims and tracks. Ideally put this in writing, for example in the quote.
  • Parts to reuse: if you want to keep doors, shelves or ironmongery, say so in advance. The tradesperson will then dismantle more carefully.
  • Services in and behind the wardrobe: check whether the wardrobe hides a water meter, stopcocks, a riser or an access panel. Access to shared services must remain after the work. If the area is later boxed in or built over, an access panel must be left. Otherwise it will need breaking open again for meter readings or repairs.
  • Electrics: if the wardrobe has a light or a socket, book an electrician for the first day so nobody has to wait. Know which circuit breaker in the consumer unit serves the room and where the main stopcock is.
  • Waste: agree who takes the waste away. If you hire a skip yourself, arrange a place for it. If it has to stand on the road or pavement, a skip permit from the local council is usually needed - the skip hire company can often arrange this. Before you hand over renovation rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
  • Flooring: the floor under the wardrobe is often missing or different from the rest of the room. If the flooring is being replaced too, plan the wardrobe removal and the lifting of the old floor, for example laminate, as one job. The new floor can then be laid level without thresholds.
  • Block of flats: inform the neighbours and the managing agent. Agree whether the lift can be used and how it will be protected. Keep to the hours the building rules allow for noisy work.
  • Clearing out: empty the wardrobe and clear a route to the exit before the tradesperson arrives. Large parts can then be carried out without awkward manoeuvring.

When a structural engineer, approval or a specialist firm is needed

A masonry wardrobe may be part of a partition or even a loadbearing wall. In older houses it is not always clear what supports the ceiling. If masonry that may affect the structure is to be removed, always have it assessed by a structural engineer.

Work on loadbearing structures or changes to the layout may require building regulations approval. Check with your local authority building control before starting. In Scotland, structural alterations, including building or removing load-bearing walls, need a building warrant from the council before work starts. Do not assume that no approval is needed. In a leasehold flat, check the lease and speak to the freeholder or managing agent before any demolition, especially if the wardrobe is next to risers, a service shaft or a shared wall.

Stop the work and call a specialist if you notice any of these signs:

  • the masonry is as thick as an external or loadbearing wall,
  • there is a lintel or beam above the wardrobe,
  • the ceiling above the wardrobe is cracked,
  • an unexpected steel structure appears during demolition.

Older properties may also contain boards with asbestos, for example old cladding or insulation boards. If the wardrobe or the wall behind it contains boards of unknown origin that look like asbestos cement, stop work and have the material tested. Such boards must not be broken, cut or sanded. In homes built before 2000, have suspect materials tested before you drill or demolish. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.

How the demolition of a built-in wardrobe works step by step

  1. Protecting the area: nearby furniture is covered with dust sheets or polythene and the floor is protected with cardboard or boards.
  2. Isolating the electrics: a qualified electrician isolates the circuit and safely terminates the cables.
  3. Removing moving parts: sliding or hinged doors, shelves, rails, drawers and ironmongery are removed. Heavy doors come off first so they cannot fall.
  4. Dismantling the carcass: sides, top and back panels are unscrewed or carefully prised off. The wall is checked with a detector before any cutting. Glued or recessed parts are cut free with a saw or an oscillating multi-tool.
  5. Removing the front: a plasterboard or chipboard front is cut out and removed together with its supporting studs and tracks.
  6. Breaking out masonry: masonry sides are taken down gradually from the top, not pulled over in one piece. For thin partitions and sides in a block of flats, hand tools or small power tools are used. A large breaker could damage adjoining walls, plaster and tiling, including in neighbouring flats. The room is sealed off with polythene so dust does not spread, and the work is done with a dust mask and safety glasses.
  7. Removing fixings: wall plugs, screws, trims and adhesive residue are removed so the wall can be repaired.
  8. Waste removal: timber, chipboard, metal and rubble are sorted and taken to the household waste recycling centre or put in a skip.
  9. Clean-up and inspection: the area is vacuumed and the condition of the wall, ceiling and floor is checked together with the customer, so it is clear what repairs will follow.

What the price of demolishing a built-in wardrobe depends on

The guide labour price is €50.00 per piece. The price per piece usually covers dismantling a standard wardrobe, removing fixings and carrying out the parts. Waste removal and disposal is often a separate item, so ask about it in the quote. Also ask what the tradesperson counts as one piece, and whether a wall-to-wall wardrobe is priced as one or as several wardrobes side by side.

The main factors affecting the price are:

  • Size of the wardrobe: a floor-to-ceiling, wall-to-wall wardrobe means more parts, more fixings and more waste. Compared with a small alcove wardrobe, the work can take twice as long.
  • Material: solid timber, metal frames and masonry are harder to remove than light chipboard. Masonry also brings dust, heavy rubble and the effort of carrying it out.
  • Fixing method: glued and recessed parts take longer than screwed ones and often have to be cut out piece by piece.
  • Plasterboard front: cutting out a stud partition is extra work and usually means more waste.
  • Services: electrics, pipework and access panels need care and sometimes another tradesperson, paid separately.
  • Access and removal: an upper floor without a lift, a narrow corridor or no space for a skip outside will lengthen the job and make waste removal more expensive.
  • Amount and type of waste: timber and small amounts of building waste are accepted at recycling centres. However, they usually accept building waste only in limited quantities, so masonry rubble is normally dealt with by hiring a skip.
  • Careful dismantling: if you want to keep parts, the work is slower than standard demolition.
  • Related work: if door frames are removed at the same time, such as in the demolition of metal door frames in concrete, or openings are altered, you save on call-out and waste removal, although the overall scope grows.

The demolition price usually does not include making good afterwards - plastering, skimming, painting and patching the floor. These are ordered as separate jobs.

Typical mistakes when removing a wardrobe and how they show up later

  • Ripping out by force: the wardrobe comes away with chunks of plaster and the floor gets damaged. The wall then needs more than filling holes - it needs a larger plaster patch.
  • Missed fixings: wardrobes are often fixed to the ceiling or floor too, often in places that cannot be seen. When prised off, part of the ceiling tears away or a floorboard cracks.
  • Cutting blind: cables or pipes may run in the wall behind the wardrobe. A punctured pipe shows immediately, damaged cable insulation sometimes only later.
  • Underestimating weight: large doors and side panels are heavier than they look. If they fall, they can injure someone or damage the floor.
  • Removing masonry without assessment: if the masonry part was carrying load, cracks will appear in the walls and ceiling over time. The repair then costs far more than a structural engineer's assessment beforehand.
  • Tools that are too powerful: a large breaker in a block of flats or near thin partitions causes cracks in plaster and tiling, including next door.
  • No dust protection: fine dust from masonry and chipboard is inhaled without a dust mask. Without sealing off the room it spreads through the whole home and the clean-up takes longer than the demolition.
  • Building waste in household bins: household bins are not meant for this. The local council decides how building waste is handled and may fine incorrect disposal. Rubble also overloads the bins and leaves neighbours with no space for ordinary rubbish.
  • Forgotten repairs: after the wardrobe, both floor and wall are left with an unfinished area. If this is not in the budget, it will come as a surprise at the next stage.

How to check the finished work

  • the wardrobe is fully removed, including trims, tracks, studs and fixings,
  • no screws or wall plugs are left sticking out of the wall, ceiling or floor,
  • surrounding walls, door frames and the floor are not damaged beyond the agreed scope,
  • any cables are safely terminated and labelled,
  • access to the water meter, stopcocks or riser has been kept,
  • where masonry was removed, there are no new cracks in surrounding walls or the ceiling,
  • parts you wanted to keep are intact and stored where agreed,
  • waste has been taken away and the area has been vacuumed and swept,
  • it is clear what plaster and floor repairs will follow.

Removing a timber wardrobe yourself

You can do this yourself with a timber or chipboard wardrobe that has no masonry parts. Have an electrician isolate any electrics in the wardrobe first. Leave masonry parts, anything that may relate to a loadbearing wall, and suspicious boards to professionals.

  1. Empty the wardrobe and cover the floor and nearby furniture.
  2. Get a cordless drill-driver, crowbar, hammer, handsaw, cable detector, gloves, safety glasses, dust mask and stable steps.
  3. Take off the doors - with sliding doors, lift the panels out of the track first. Carry heavy pieces with two people.
  4. Remove shelves, rails, drawers and ironmongery.
  5. Unscrew the carcass working down from the ceiling, holding each part before releasing it.
  6. Release the back panel and trims. Before cutting near the wall, check it with a detector, and carefully cut glued parts free rather than tearing them off.
  7. Remove screws and wall plugs from the wall, ceiling and floor.
  8. Sort the waste into timber, metal and other, and take it to the recycling centre.
  9. Vacuum the dust and check the condition of the wall and floor.

Frequently asked questions

As a guide, €50.00 per piece. The final price depends on the size of the wardrobe, materials, fixing method, any masonry or plasterboard parts, services and whether waste removal is included.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.