Removal of old floating floors (parquet, linoleum)

Removing an old floating floor, parquet or lino means stripping the covering, underlay, trims and adhesive residue down to the screed. The guide price is €2.50 per m², depending mainly on the covering and adhesive.

Updated 09/2026·11 min read·25 price list items
Standard labour price
€2.50/ m²
Indicative range
€2.00 - €3.25
60 m² flat
€375.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Removal of old floating floors (parquet, linoleum)

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Strip-out and demolition25 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Demolition and dismantling works cost

Remove floating floor (parquet, linoleum)m²€2.50 / m²m²enter quantity-
Break out ceramic wall tilesm²m²-
Break out floor tilesm²€9.00 / m²m²enter quantity-
Remove bathpcs€45.00 / pcspcsenter quantity-
Remove WCpcs€25.00 / pcspcsenter quantity-
Remove basinpcs€17.00 / pcspcsenter quantity-
Demolish brick partition wall up to 150mm thickm²m²-
Demolish solid / fair-faced brickworkm²m²-
Demolish concrete wall / partitionm³€150.00 / m³m³enter quantity-
Demolish reinforced concrete slab up to 12 cmm²€54.00 / m²m²enter quantity-
Strip PVC or carpet floor coveringsm²€4.00 / m²m²enter quantity-
Remove door with timber framepcs€25.00 / pcspcsenter quantity-
Cutting concrete and removing steel door framepcspcs-
Break out metal door frame from concretepcs€45.00 / pcspcsenter quantity-
Remove panel radiatorpcs€35.00 / pcspcsenter quantity-
Remove cast iron radiatorpcs€45.00 / pcspcsenter quantity-
Remove plasterboard ceiling and structurem²€9.50 / m²m²enter quantity-
Complete demolition of prefabricated bathroom corepcspcs-
Strip old internal plasterm²€8.50 / m²m²enter quantity-
Remove kitchen unitpcspcs-
Break out fitted wardrobepcs€50.00 / pcspcsenter quantity-
Break out WC soil pipe enclosurepcs€35.00 / pcspcsenter quantity-
Remove window sillspcs€10.00 / pcspcsenter quantity-
Rubble removal and disposaltt-
Removal and disposal of asbestos / asbestos cementm²€20.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What floor removal includes and when it is needed

Lifting the old floor is the first step in almost every flat or house renovation. It usually takes place alongside other demolition work, such as taking down brick partitions. The job covers taking up a floating floor (laminate or engineered wood), removing parquet and stripping lino or vinyl, including the underlay, skirting, trims and adhesive residue. In the UK "lino" is often used loosely for any sheet vinyl, so quotes may use both names for the same thing.

Floor removal is needed when:

  • a new floor is going down and the old one would get in the way,
  • the old floor is lifting, creaking or opening up at the joints,
  • there are signs of damp underneath, a musty smell or dark marks along the walls,
  • the condition of the screed needs checking, for example before deciding on levelling.

The result is a clean base that can be assessed for the next step. Screed repairs, levelling and drying are not part of the removal itself and are priced separately.

Why not simply lay the new floor over the old one

It is tempting: put the new laminate straight on top of the old and avoid the dust. In practice it often does not work. A new floor follows everything beneath it, and the old covering hides problems that only show up later.

  • Unevenness and dips: an old floor sags or wears over time, and a new floor laid on it flexes, creaks and opens up at the joints.
  • Damp and mould: under lino or parquet that has been wet at some point, dark patches and a musty smell are common. Covering them over lets the problem continue.
  • Floor height: each extra layer raises the floor, so doors stop closing and a step appears at the threshold to the next room.
  • Unknown base: the real state of the screed, cracks and old adhesives only becomes clear once the floor is up.

Overlaying only makes sense in exceptional cases, when the old covering is firm, flat and dry and the manufacturer of the new floor explicitly allows that type of base.

What to clarify before booking the work

  • What exactly is on the floor: a floating floor, nailed or glued parquet, loose-laid or fully bonded vinyl. Older properties often have several layers, for example vinyl over parquet. If unsure, lift a section of skirting or a corner of the covering and send a photo to the tradesperson.
  • What is under the covering: whether there is underfloor heating, whether cables run behind old skirting and roughly where services run. Any old drawings or photos from when the floor was laid are useful. Heavy tools can easily damage pipes and cables.
  • Suspected asbestos: hard square vinyl tiles or black adhesive in an older property must be dealt with before the work starts, not during it. Details are in the asbestos section below.
  • What should be kept: skirting boards, threshold strips or some of the parquet for reuse. Careful removal is slower, so say so in advance to stop these items going out with the waste.
  • Who handles the waste: whether removal is included in the quote, or whether the skip and trips to the tip are arranged separately.
  • How far the cleaning goes: whether removing the covering and vacuuming is enough, or whether the base must also be machine-scraped and ground ready for a glued floor or levelling compound.
  • Fitted furniture: in a full renovation, a built-in wardrobe standing directly on the floor is sometimes removed too. Agree in advance who will dismantle it.

How floor removal is carried out step by step

  1. Preparing the room: furniture, rugs and anything that could get in the way or get dirty are taken out. Doors to other rooms are sealed with dust sheeting, because scraping adhesive creates a lot of fine dust.
  2. Removing trims: skirting boards come off first, then threshold strips at the doorways.
  3. Removing the covering: the method depends on the material, see the subheadings below.
  4. Removing underlay and membrane: under a floating floor there is underlay and sometimes a vapour control membrane, which are rolled up.
  5. Cleaning the base: adhesives, sealants, nails and bits of underlay are left behind. They must be removed, otherwise they show as bumps under the new floor or weaken the bond of new adhesive or levelling compound. Hard adhesives are taken off with a hand or powered scraper, or a grinder with dust extraction.
  6. Vacuuming and inspection: the base is vacuumed and its condition checked.
  7. Waste removal: old floor coverings are construction waste and do not belong in the household bin. Small amounts can go to the household waste recycling centre according to the council's rules, and larger areas usually need a skip. Acceptance rules vary between councils, so it is worth checking with the local council. Before you hand over a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.

How to remove a floating floor

A floating floor is not glued down - the boards simply click together. It is taken up from the last row laid, that is from the wall where installation finished. The boards are angled up and dismantled row by row. Starting from the first row would mean working against the locking joints, and the boards would break.

Removing parquet

Parquet is usually glued or nailed, so it is loosened with a pry bar, a wide bolster chisel or an electric breaker with a scraper blade. It is slower than a floating floor and produces more waste.

How to remove glued vinyl and lino

Loose-laid vinyl or lino can be rolled up in a few minutes. Fully bonded flooring is cut into strips and pulled up, and the residue is removed with a scraper.

The cost of floor removal: what it depends on

The guide labour price is €2.50 per m². How difficult the job is, and therefore the final price, depends mainly on how firmly the covering is fixed and what is found underneath.

  • Type of covering: a floating floor comes up fastest and is usually at the lower end of the price. Glued parquet and fully bonded vinyl take much longer, and the labour can easily double.
  • Type of adhesive: soft water-based adhesives scrape off easily. Old hard or bitumen adhesives need machinery and make the work considerably more expensive.
  • Several layers: older properties often have vinyl on parquet or laminate on lino. Each layer is extra work and some tradespeople price it as a separate item.
  • Room layout: lots of corners, alcoves and door frames slow the work more than a large open area. A small hallway with several doors therefore costs more per m² than a living room.
  • Size of the area: very small areas are often charged at a minimum rate, because travel, preparation and clearing up take the same time.
  • Required cleanliness of the base: a vacuumed base for a floating floor is less work than a machine-scraped and ground base for a glued floor or levelling compound.
  • Careful removal: if skirting or parquet is to be kept, the work is slower.
  • Access and waste removal: carrying waste down from an upper floor without a lift takes longer. Skip hire and disposal charges are usually a separate item.
  • Condition of the base: a crumbling screed or damp means further work that is not part of the removal itself.
  • Asbestos: if it is confirmed, it becomes a different job and the price for standard removal no longer applies.

When comparing quotes, ask whether the price includes skirting and trims, underlay, scraping adhesive, carrying out and disposing of the waste.

Watch out for asbestos in old floor coverings

Old vinyl floor tiles and some black bitumen adhesives from before around 2000 may contain asbestos. If an older property has hard square tiles or black adhesive, do not sand, grind or break them up. Asbestos cannot be reliably identified by eye - only a sample analysis gives certainty, so if in doubt have a sample taken. Removal of asbestos-containing materials should be left to a specialist asbestos contractor - asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor - and the waste is hazardous and has its own disposal rules.

How to prepare for floor removal

A lot of time can be saved before the tradesperson arrives. The work goes faster with:

  • a completely cleared room, including items in cupboards and on walls that could be covered in dust,
  • a skip delivered on the day of removal, not two days later,
  • an agreed place to park and unload tools outside the property,
  • access to electricity for grinders and scrapers and to water for cleaning up.

The work takes longer when furniture has to be moved from place to place, when the home is occupied and a route has to be cleaned every day, or when noisy work is restricted to certain hours.

In a block of flats, let the managing agent or freeholder know about the work and follow the building rules, especially the hours when noisy work is allowed. Check the lease too, as some leases set conditions for changing floor coverings. If waste has to be carried through shared areas, agree protection for the lift and stairs in advance. Replacing a floor covering is normally treated as maintenance, but if there is any doubt whether the wider renovation needs approval, check with the local authority's building control.

Typical mistakes and how they show up later

Adhesive residue left on the base. New levelling compound or adhesive does not bond to it and the floor later comes loose. Under a floating floor, the bumps telegraph through to the boards, which flex and click.

Damp overlooked. A damp screed covered by a new floor leads to mould and distortion. The new covering starts to lift at the edges or smells within a few months.

Tools that are too heavy. Aggressive breaking damages the screed, the damp-proof membrane or underfloor heating pipes. A damaged heating pipe sometimes only shows up when the heating is first switched on.

Grinding without dust extraction. Dust spreads through the whole home and can be hazardous with old materials.

Waste in the wrong bin. Construction waste belongs at the recycling centre or in a hired skip. Incorrectly disposed waste can cause problems with the managing agent or the council.

Residue left under door frames and in corners. The new floor cannot be fitted properly there and visible gaps remain. Where old metal door frames are being taken out anyway, it is easier to do this before the floor is finished.

How to check the finished work

Before the floor fitter starts, walk over the area yourself. A long straightedge or spirit level and a torch help. If the base is to be levelled next, specify the screed flatness class in the contract: SR1 allows a gap of no more than 3 mm under a 2 m straightedge, SR2 5 mm and SR3 10 mm (BS 8204).

  • covering, underlay, membranes and trims are removed from the whole area, including corners and under door frames,
  • there are no nails, staples or thicker adhesive residue on the base,
  • with a torch held low over the floor, no bumps or shiny patches of adhesive are visible,
  • the screed has no new cracks or chipped areas from tools,
  • services in the floor and the plaster at the base of the walls are undamaged,
  • door frames and doors are not dented from the pry bar,
  • the base is vacuumed and free of damp stains or mould,
  • items that were to be kept are intact and set aside,
  • the waste has been taken away and it is clear where it went.

DIY guide: taking up a floating floor

A floating floor can be removed as a DIY job, as long as it is not glued down and the material is not a suspect older product. Glued parquet and old adhesives are better left to a contractor with the right machinery.

  1. Clear the room and seal the doors with dust sheeting.
  2. Get gloves, safety glasses, a dust mask, a pry bar, a multi-tool or knife and waste sacks ready.
  3. Carefully remove the skirting and threshold strips if they are to be reused.
  4. Find the wall where installation finished and start with the last row. If this is not obvious, try lifting a board at both opposite walls - at the last row the joint releases without breaking.
  5. Angle the boards up, dismantle row by row and stack them rather than throwing them. Keep sharp tools pointed away from the base.
  6. Roll up the underlay and membrane.
  7. Check the base for damp, cracks or mould.
  8. Vacuum the base and take the waste to the recycling centre.

Frequently asked questions

As a guide, €2.50 per m². A loose-laid floating floor is the cheapest, glued vinyl and parquet cost more, especially if hard adhesive has to be removed by machine. Waste removal and skip hire are often a separate item.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.