Removal of tiles and paving

Removing tiles means stripping old wall tiles and floor tiles so the surface can be tiled again. Wall tile removal costs roughly €8.50 per m², depending mainly on the substrate, the mortar bed and rubble disposal.

Updated 09/2026·11 min read·25 price list items
Standard labour price
€8.50/ m²
Indicative range
€8.50 - €9.00
60 m² flat
€1275.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Removal of tiles and paving

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Strip-out and demolition25 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Demolition and dismantling works cost

Break out ceramic wall tilesm²€8.50 / m²m²enter quantity-
Break out floor tilesm²€9.00 / m²m²enter quantity-
Remove bathpcs€45.00 / pcspcsenter quantity-
Remove WCpcs€25.00 / pcspcsenter quantity-
Remove basinpcs€17.00 / pcspcsenter quantity-
Demolish brick partition wall up to 150mm thickm²m²-
Demolish solid / fair-faced brickworkm²m²-
Demolish concrete wall / partitionm³€150.00 / m³m³enter quantity-
Demolish reinforced concrete slab up to 12 cmm²€54.00 / m²m²enter quantity-
Strip PVC or carpet floor coveringsm²€4.00 / m²m²enter quantity-
Remove floating floor (parquet, linoleum)m²€2.50 / m²m²enter quantity-
Remove door with timber framepcs€25.00 / pcspcsenter quantity-
Cutting concrete and removing steel door framepcspcs-
Break out metal door frame from concretepcs€45.00 / pcspcsenter quantity-
Remove panel radiatorpcs€35.00 / pcspcsenter quantity-
Remove cast iron radiatorpcs€45.00 / pcspcsenter quantity-
Remove plasterboard ceiling and structurem²€9.50 / m²m²enter quantity-
Complete demolition of prefabricated bathroom corepcspcs-
Strip old internal plasterm²€8.50 / m²m²enter quantity-
Remove kitchen unitpcspcs-
Break out fitted wardrobepcs€50.00 / pcspcsenter quantity-
Break out WC soil pipe enclosurepcs€35.00 / pcspcsenter quantity-
Remove window sillspcs€10.00 / pcspcsenter quantity-
Rubble removal and disposaltt-
Removal and disposal of asbestos / asbestos cementm²€20.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

Where tiles are removed and when it is needed

This is most often a bathroom, a WC or the tiled splashback behind kitchen units. The floor tiles in the same rooms are often taken up at the same time. Removal is needed when new wall or floor tiles are planned, when old tiles are cracking and falling off, or when pipes or cables in the wall or floor have to be reached. The job is part of wider demolition work and is usually the first step of a bathroom or kitchen refit.

The aim is not simply to knock the tiles off. The wall and floor left behind should be ready to take new adhesive. The difference between a quick job and a good job shows when the next tradesperson arrives. Either the tiler can prime and tile straight away, or the plaster or screed has to be repaired first.

What to decide before work starts

A few points are worth agreeing before booking the work. They affect the scope and whether the job overruns.

  • Exact scope: full walls, only up to a certain height, only the splashback, with or without the floor. If some tiling is to stay, mark the boundary directly on the wall.
  • What comes next: new tiles, plaster and paint, plasterboard or a new floor. This decides whether removing the tiles is enough or whether old adhesive and mortar must also come off back to the masonry or screed.
  • Fittings: who removes the bath, basin, WC, taps, mirrors and cabinets, and what is to be kept. Where floor tiles run under a bath or shower tray, the fitting usually has to come out completely. If a built-in wardrobe is being removed in the same room, agree the order of work.
  • Floor level: where floor tiles were laid on a thick mortar bed, the floor drops once they are removed. Decide whether it will be levelled and how it will meet thresholds and door frames.
  • Underfloor heating: if there is wet or electric underfloor heating, the tradesperson must know in advance. Floor tile removal then has to be much more careful.
  • Rubble disposal: whether the tradesperson takes it away, whether a skip is ordered and where it can stand.

How tile removal is done step by step

A well-done job follows a clear order. Skipping a step shows later in the quality of the wall or in unnecessary cleaning.

  1. Isolating services: the water is turned off and the circuit for the room is switched off at the consumer unit. The routes of cables and pipes are checked.
  2. Removing fittings and protecting surfaces: mirrors, cabinets, taps and socket faceplates are removed. The bath, basin, floor and door frames are covered, and doors to other rooms are sealed with plastic sheeting. Wastes and floor gullies are covered so no rubble falls in.
  3. Removing wall tiles: tiles are chiselled off starting from an edge or a corner, working in small areas, by hand or with a breaker fitted with a flat chisel. Rubble goes into strong bags as the work proceeds, so it does not get in the way or overload the floor.
  4. Removing floor tiles: the floor follows the walls, so rubble from the walls does not land on a cleared floor. Tiles are lifted with a chisel held at a low angle, working from an edge or the threshold into the room.
  5. Cleaning down and checking the substrate: remaining adhesive or mortar is removed as required by the next stage. Walls and floor are vacuumed, and tapping confirms whether plaster and screed are sound.
  6. Rubble removal and clean-up: bags are taken away as construction waste and the room is swept and vacuumed.

Why start from an edge? The first tile is the hardest to remove. The next ones have a free edge, so the chisel slides underneath. The wall takes fewer blows.

By hand or by machine: what to choose

For a small area, such as a kitchen splashback, a lump hammer and a wide bolster chisel are often enough. Hand work is slower but easier to control and does not damage the wall unnecessarily.

For a whole bathroom, a light breaker with a flat or spade chisel is normally used. A heavy breaker has no place in a home. It easily damages plaster, brickwork and services, and in a block of flats it causes needless noise for the neighbours. The same applies to floors: a wide chisel at a low angle undercuts the tile without breaking up the screed below.

If part of the tiling is to stay, the boundary is first cut with an angle grinder and a diamond blade. The tiles then break exactly where intended, not two rows further along.

What affects the price

The indicative labour price is €8.50 per m². It applies to removing wall tiles. Floor tiles are often priced as a separate item, because the effort differs, especially on a thick mortar bed. A wall of the same size may take an hour one time and a whole morning another. What matters most is what the tiles are fixed with and what lies underneath.

  • Tiles on a thin bed of adhesive come off fairly easily, but adhesive remains on the wall and has to be ground or chipped off. If the wall must be cleaned back to smooth, the work increases noticeably.
  • Tiles set in mortar, common in older houses and flats, sit in a thicker layer. They are often removed together with the mortar back to the masonry, and the wall then needs levelling. There is far more work and rubble than with adhesive-fixed tiles.
  • Floor tiles on a mortar bed are usually harder to remove than tiles on adhesive. If the bed also has to go, the job becomes removal of a whole floor layer, which raises the price considerably.
  • Tiles on plasterboard need care. Chiselling easily tears the board's paper face, and sometimes replacing the board is simpler than repairing it.
  • Several layers, where new tiles were once fixed over old ones, mean more work and more rubble.
  • Shower enclosures have a tanking membrane under the tiles. It is damaged during removal and new tanking is applied before retiling.
  • Underfloor heating and services under the floor or many pipes and cables in the wall mean slow hand work around them.
  • Size and shape of the area: a small WC with many corners, reveals and recesses costs more per m² than a large flat wall.
  • Access and disposal: an upper floor without a lift, a narrow hallway or a room full of fittings slow the job. Rubble removal and disposal are often charged separately.

What makes the job easier and what slows it down

A lot of time can be saved before the tradesperson arrives. It helps when the customer:

  • clears toiletries, towels, the washing machine and mats from the bathroom, and anything in the hallway that would get in the way of carrying rubble out,
  • knows where the main stopcock is and which circuit serves the bathroom and kitchen,
  • arranges space for a skip or rubble bags and, if a skip will stand on the road, the permit from the council,
  • agrees protection of the lift and communal areas with the managing agent,
  • warns the neighbours about noisy days,
  • has a plumber or electrician on standby who can be contacted quickly if something unexpected is found.

The job is slowed down when the scope is still being decided on the day, when there is no water to damp down dust, or when the power cannot be switched off for one room only and temporary lighting has to be arranged.

How long tile removal takes

A kitchen splashback is usually done in a few hours. A typical small bathroom with adhesive-fixed tiles normally takes one to two working days, including carrying out rubble and cleaning up. Tiles set in mortar, removal of a mortar bed or work around underfloor heating take longer.

The schedule should include a margin for surprises, such as hollow plaster or a damaged pipe. The next trade should start only after the substrate has been checked, not on the same day just in case.

Safety, services and rules in blocks of flats

Bathroom and kitchen walls carry water supply, waste pipes and electrics. Cables usually run vertically or horizontally from sockets and switches, but in older buildings this is not always so. A cable and pipe detector and care when chiselling around services help. If a cable is damaged, the repair must be done by a qualified electrician, not as DIY. A damaged gas pipe in a kitchen is strictly a job for a Gas Safe registered engineer. If you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland).

Chiselling produces fine dust containing respirable crystalline silica, which harms the lungs. An FFP2 or higher respirator, safety glasses, tough gloves and long sleeves are needed, because tile shards are as sharp as glass. For floors, sturdy boots protect the feet. In homes built before 2000, have suspect materials behind the tiles tested before you drill or demolish, and stop work if you find something unexpected. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.

In a block of flats, check the lease and any house rules, which often set hours for noisy work, and inform the managing agent or freeholder. Replacing tiles on its own is normally treated as routine maintenance, but if you combine it with changes to partitions, such as removing brick partitions, to soil stacks or to the layout, check with building control and the freeholder what consent is needed. Soil stacks and load-bearing walls are shared or structural parts of the building, and work on them requires consent and a professional.

Typical mistakes and how they show later

  • Tools that are too heavy break plaster and brickwork, turning a simple strip-out into a full wall repair. On the floor they crack the screed, which then needs levelling.
  • Chiselling blind near services ends with a punctured pipe or a cut cable. A small leak in a wall sometimes shows only after retiling, as a damp patch next door or a mouldy grout line.
  • Adhesive left on the wall means new tiles do not sit flat and bond less well. The tiler has to remove it later or build up a thicker adhesive bed. New wall tiling should follow the BS 5385 code of practice, with the background prepared and the adhesive chosen to suit the tile size and weight.
  • Rubble in the waste: an uncovered waste or gully gets blocked with mortar, and the problem appears only after the new fittings are connected.
  • Underestimated rubble: tiles are heavy, and tiles set in mortar can weigh several tens of kilograms per m². There are more bags than expected, and they must not go in the household bin.
  • No contingency: hollow or damp plaster often appears under old tiles and has to be allowed for in time and budget.

Small amounts of DIY rubble are accepted at a household waste recycling centre under the rules of your local council. Larger quantities need a skip. Before you hand over renovation rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.

How to check the finished work

  • tiles are removed over the whole agreed area, and edges against retained tiling are straight,
  • no adhesive remains on the wall that would hinder new tiling,
  • the plaster does not sound hollow when tapped, and any hollow spots are marked or removed,
  • the floor screed is firm, does not crumble and has no deep holes from chiselling,
  • water and electrical services are undamaged, and no water drips anywhere once turned back on,
  • wastes and gullies run freely and are not clogged with rubble,
  • fittings, the bath and floors in adjoining rooms are free of scratches and cracks, and the door frames are undamaged unless they were due for removal,
  • rubble has been taken away and the room swept and vacuumed,
  • it is agreed who will prepare the substrate for the new tiles.

Removing tiles yourself

With a small area, a masonry wall and patience, the job is manageable as DIY. With plasterboard, extensive services, underfloor heating or a whole bathroom tiled in mortar, calling a professional is usually more sensible. The chiselling itself follows the method described above. For DIY, these points matter most:

  1. Have a lump hammer, a wide bolster chisel, possibly a light breaker, an angle grinder with a diamond blade, a cable and pipe detector, strong bags and a vacuum rated for construction dust.
  2. Turn off the water and switch off the room's circuit before removing anything.
  3. Wear a respirator, glasses, gloves, long sleeves and sturdy footwear, and open a window.
  4. Use the detector to mark cable and pipe routes on both walls and floor, and work only gently by hand in those areas.
  5. Work in small areas and take breaks, because fatigue leads to harder and less accurate blows.
  6. Fill bags only to a weight that can be carried safely.

If a cable, an unfamiliar pipe or suspicious boards appear while chiselling, stop and call a professional.

Frequently asked questions

The indicative price is €8.50 per m². The final price rises with tiles set in mortar, several layers, cleaning back to smooth, work around services and rubble disposal if charged separately. Floor tiles are often priced as a separate item.

Related work