Demolition of metal door frames (concrete)

Removing a steel door frame from a concrete wall means cutting out the old frame without needless damage to the opening. It costs roughly €45.00 per frame and takes a few hours. Fixing method and surrounding finishes affect the price most.

Updated 09/2026·11 min read·25 price list items
Standard labour price
€45.00/ pcs
Indicative range
€36.00 - €58.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Demolition of metal door frames (concrete)

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Strip-out and demolition25 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Demolition and dismantling works cost

Break out metal door frame from concretepcs€45.00 / pcspcsenter quantity-
Break out ceramic wall tilesm²m²-
Break out floor tilesm²€9.00 / m²m²enter quantity-
Remove bathpcs€45.00 / pcspcsenter quantity-
Remove WCpcs€25.00 / pcspcsenter quantity-
Remove basinpcs€17.00 / pcspcsenter quantity-
Demolish brick partition wall up to 150mm thickm²m²-
Demolish solid / fair-faced brickworkm²m²-
Demolish concrete wall / partitionm³€150.00 / m³m³enter quantity-
Demolish reinforced concrete slab up to 12 cmm²€54.00 / m²m²enter quantity-
Strip PVC or carpet floor coveringsm²€4.00 / m²m²enter quantity-
Remove floating floor (parquet, linoleum)m²€2.50 / m²m²enter quantity-
Remove door with timber framepcs€25.00 / pcspcsenter quantity-
Cutting concrete and removing steel door framepcspcs-
Remove panel radiatorpcs€35.00 / pcspcsenter quantity-
Remove cast iron radiatorpcs€45.00 / pcspcsenter quantity-
Remove plasterboard ceiling and structurem²€9.50 / m²m²enter quantity-
Complete demolition of prefabricated bathroom corepcspcs-
Strip old internal plasterm²€8.50 / m²m²enter quantity-
Remove kitchen unitpcspcs-
Break out fitted wardrobepcs€50.00 / pcspcsenter quantity-
Break out WC soil pipe enclosurepcs€35.00 / pcspcsenter quantity-
Remove window sillspcs€10.00 / pcspcsenter quantity-
Rubble removal and disposaltt-
Removal and disposal of asbestos / asbestos cementm²€20.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

Why a steel door frame cannot simply be pulled out

A pressed steel door frame set into a concrete wall can stay sound for decades. When it is time to replace it with a modern timber door lining, the frame usually turns out to be filled with mortar or concrete, often welded to fixing lugs and firmly bonded to the wall. It therefore has to be cut into smaller sections first and then freed piece by piece. The aim is a solid, true opening that a new door can be fitted into. This job is one of the smaller tasks within demolition work during a refurbishment.

It is most often done when refurbishing a flat in a concrete-framed block, replacing internal doors, or upgrading a bathroom or WC. Steel frames are typical of older blocks of flats. Many owners dislike their look, the sheet metal edges that are hard to paint, and the limited choice of doors that match them.

What to decide before the steel frame comes out

Removing the frame is only the first step. Most problems arise when the next steps are only worked out afterwards.

  • Does the old frame really need to come out? If only the appearance bothers you and the opening is fine, there are cover systems that fit over an existing steel frame without any demolition. Removal is worthwhile if you want a timber lining, a different door size or a clean opening with no old metal left.
  • Which door and lining will replace the old ones. A door lining is made for a certain wall thickness and opening size. With a concrete wall, measure the wall thickness including plaster and compare it with the manufacturer's range.
  • Will the opening stay the same or change. Widening or moving an opening in a concrete wall is an alteration to the wall itself, and in a block of flats often to the load-bearing structure. This must be decided in advance, not during the demolition.
  • Who will make good the reveals. Once the frame is out, small breakouts remain around the opening. Agree whether the person removing the frame will repair them, or the joiner fitting the door, or the plasterer or decorator.
  • Order of works. Removal is dusty and noisy, so it belongs among the first jobs of a refurbishment, before decorating and before the new floor goes down. It makes sense to plan it together with other strip-out jobs such as removing a built-in wardrobe or taking out the old kitchen units. The new timber lining, on the other hand, is usually fitted onto the finished floor and decorated walls.
  • Waste. Agree whether removal of scrap metal and rubble is included in the price, or whether you will arrange it yourself.

Removing a steel door frame step by step

Every opening is slightly different, but the method in practice is usually similar:

  1. Preparing the area. Furniture is moved away and the floor and surroundings are covered. Cutting metal throws sparks that burn through polythene, cardboard, ordinary dust sheets and floating floors. A non-combustible mat, such as a welding blanket or a steel sheet, is therefore placed under the cutting point. If there is a floating floor around the frame, it is often lifted near the opening.
  2. Removing the door. The leaf is taken off its hinges, and architraves, the threshold and any tiling or trims overlapping the frame are removed.
  3. Checking for services. There is usually a light switch next to the door and often a cable running above it. A detector is used to find cables and pipes so that cutting and chiselling do not damage them. In homes built before 2000, have suspect materials tested before you drill or demolish; asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.
  4. Cutting the frame. The frame is cut with an angle grinder, usually in the head and in the jambs, and if needed near the floor where there may be a spreader bar. Smaller pieces come out more easily and put less strain on the wall.
  5. Freeing it from the concrete. The pieces are levered out gradually with a pry bar, and the mortar or concrete around the profile is carefully chiselled away with a bolster and hammer or a small breaker. Fixing lugs are cut off flush with the wall. Cutting and chiselling concrete releases fine silica dust, so the work is done with on-tool extraction or the dust is collected continuously with a vacuum designed for construction dust.
  6. Cleaning up the opening. Mortar residue, sharp edges and protruding lugs are removed and the opening is cleaned of dust.
  7. Waste removal. The metal can go to a scrap metal merchant. Rubble belongs at a household waste recycling centre or in a skip for construction waste, not in household bins. Before you hand over renovation rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.

What the cost of removing a frame from concrete depends on

The guide price for labour is €45.00 per frame. It applies to a standard single-leaf frame in an existing opening. The actual price may differ depending on what the tradesperson finds on site. Most factors can be assessed at the survey visit:

  • How the frame is fixed. A frame fixed at only a few points comes out fastest - roughly 1 to 3 hours for an experienced tradesperson. If the profile is completely filled with mortar or was cast into the concrete during construction, the job can take several times longer, easily half a day, and this shows in the price.
  • Wall thickness and type. A thick concrete wall is harder than a brick or block partition, and chiselling takes longer.
  • Frame size and shape. Non-standard, wider or double-leaf frames mean more cuts and more chiselling. A double frame is often priced as more than one piece or with a surcharge.
  • Surrounding finishes. Wall tiles in a bathroom, floor tiles or a new floor next to the frame call for a slower, more careful approach. If the tiling is to be kept, the work takes considerably longer.
  • Space and access. Tools are harder to use in a narrow hallway or a small flat, and protecting the surroundings also takes more time.
  • Additional work. Making good the reveals, waste removal, lifting and relaying a floating floor at the opening, or carrying rubble down without a lift are usually separate items.
  • What comes next. If the opening is to be widened at the same time, this is no longer just frame removal but an alteration to the wall, priced separately and possibly requiring a structural engineer (see below).

With several frames in one flat, the work per frame is usually more efficient, because setting up tools and protecting the area is done once. When comparing quotes, ask exactly what the price per frame includes.

What you can prepare to keep the job moving

  • clear the space around the door on both sides, at least enough to stand comfortably with a grinder,
  • move textiles, paper and anything flammable away, as well as sensitive electronics that dust could damage,
  • close the doors to other rooms, or seal them with polythene, so the dust does not spread through the home,
  • find out which circuit breaker in the consumer unit serves the switch by the door, and keep access to the consumer unit clear,
  • make sure there is a working socket for the tools and vacuum, unless electrical work is going on at the same time,
  • agree a time with the tradesperson within the permitted hours for noisy work and let the neighbours know,
  • set aside a place or a skip for rubble and metal if you are arranging disposal yourself,
  • have the new door chosen and its dimensions ready, so the opening can be checked straight after removal.

Steel door frames in blocks of flats: the building and load-bearing walls

Simply removing a frame from an existing opening does not significantly alter the wall. It is different if you want to enlarge or move the opening. Concrete walls in blocks of flats are often load-bearing, and any widening of an opening is an alteration to the structure. In that case you need an assessment by a structural engineer and should check in advance with building control what approval is required under local building regulations. In Scotland, building or removing load-bearing walls needs a building warrant from the council before work starts. If you own a leasehold flat, also check your lease, as structural alterations usually need the freeholder's consent. Do not assume that a simple notification will be enough.

In a block of flats it is worth informing the managing agent or freeholder in advance and keeping to the hours when the building rules allow noisy work. Neighbours will also appreciate a short notice in the communal area, because chiselling concrete carries through the whole block.

If cables or pipes are found during removal running differently than expected, work must stop. Electrical repairs are a job for a qualified electrician.

Typical mistakes when removing a frame and how they show up later

Chiselling without cutting

Trying to knock the whole frame out with a hammer leads to large breakouts and cracks in the wall. Later the new timber lining has nothing solid to fix to, and the reveals have to be built up heavily with mortar.

Tools that are too powerful

A heavy breaker in a thin or brittle wall does more harm than good. Vibration can loosen plaster and tiles on the other side of the wall, and cracks often only appear after decorating.

Levering against the edge of the opening

A pry bar without packing breaks off the corner of the wall and widens the opening unnecessarily. The architrave then will not cover the gap between the lining and the wall.

Forgotten services

A cut cable at the light switch is a common and unpleasant complication. It means calling an electrician, chasing out a channel and repairing a wall that could have stayed intact.

Protruding fixing lugs

Leftover lugs and mortar in the opening prevent the new lining from being set plumb. The door then rubs on the frame or does not close properly.

Underestimating sparks and dust

A burnt floor or a whole flat covered in dust is easy to avoid with good preparation. Small burns on laminate can be disguised with repair wax or one board can be replaced, but on vinyl and with larger damage the repair is usually more complicated and visible.

No protective equipment

Flying metal and sparks endanger the eyes, and the noise endangers hearing. The greatest risk, however, is fine silica dust from concrete, which damages the lungs with long-term exposure. An ordinary face covering offers no protection; a respirator of at least FFP2, preferably FFP3, is needed.

How to check the opening after the frame is removed

Before the new door is fitted, inspect and measure the opening. A timber lining needs a true, solid opening with the dimensions given by the manufacturer.

  • no pieces of metal, fixing lugs or protruding mortar are left in the opening,
  • the edges of the opening are solid, with no loose pieces of concrete, and nothing falls off when tapped,
  • larger breakouts have been repaired, or it is agreed who will repair them,
  • the width and height of the opening suit the new lining - measure at the top, middle and bottom,
  • the sides are plumb and the head is level, checked with a spirit level,
  • there are no new cracks or loose tiles on the other side of the wall,
  • cables and pipes nearby are undamaged and the light switch works,
  • the floor and surrounding surfaces are free of damage and burn marks,
  • waste has been removed and the area cleaned.

DIY guide: removing a frame without widening the opening

If you have experience with an angle grinder and will not be enlarging the opening, this is a job you can do yourself. The method is the same as above; here are mainly the extra points a DIYer needs to watch. Expect noise, dust and sparks, and expect the first frame to take longer than it would a tradesperson. If you are not sure where cables run, or it is a load-bearing wall you want to alter, leave the work to professionals.

  1. Get safety glasses or a face shield, an FFP2 or FFP3 respirator, ear defenders and sturdy gloves.
  2. Use a vacuum designed for construction dust; an ordinary household vacuum will not capture fine concrete dust and will soon be damaged.
  3. Before starting, switch off the circuit breaker for the circuit feeding the switch by the door.
  4. Put a non-combustible mat under the cutting point, not cardboard or polythene, and keep a bucket of water or a fire extinguisher to hand.
  5. Use a metal cutting disc, cut slowly without forcing the disc, and hold the grinder with both hands.
  6. Chisel the mortar out bit by bit with a bolster and hammer, not with a breaker at full power.
  7. Rest the pry bar on a timber packer, not on the edge of the wall.

If a damaged cable or pipe appears, or a crack that runs further into the wall, stop work and call a professional.

Frequently asked questions

Roughly €45.00 per frame for a standard single-leaf frame. You will pay more for a frame fully filled with concrete, a double-leaf or non-standard frame, tiling that has to be preserved, and if the price also includes making good the reveals and waste removal.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.