Building work price list: Removal of prefab bathroom pods
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Demolition and dismantling works cost | ||||
| Complete demolition of prefabricated bathroom core | pcs | €550.00 / pcs | pcs | enter quantity- |
| Break out ceramic wall tiles | m² | m² | - | |
| Break out floor tiles | m² | €9.00 / m² | m² | enter quantity- |
| Remove bath | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove WC | pcs | €25.00 / pcs | pcs | enter quantity- |
| Remove basin | pcs | €17.00 / pcs | pcs | enter quantity- |
| Demolish brick partition wall up to 150mm thick | m² | m² | - | |
| Demolish solid / fair-faced brickwork | m² | m² | - | |
| Demolish concrete wall / partition | m³ | €150.00 / m³ | m³ | enter quantity- |
| Demolish reinforced concrete slab up to 12 cm | m² | €54.00 / m² | m² | enter quantity- |
| Strip PVC or carpet floor coverings | m² | €4.00 / m² | m² | enter quantity- |
| Remove floating floor (parquet, linoleum) | m² | €2.50 / m² | m² | enter quantity- |
| Remove door with timber frame | pcs | €25.00 / pcs | pcs | enter quantity- |
| Cutting concrete and removing steel door frame | pcs | pcs | - | |
| Break out metal door frame from concrete | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove panel radiator | pcs | €35.00 / pcs | pcs | enter quantity- |
| Remove cast iron radiator | pcs | €45.00 / pcs | pcs | enter quantity- |
| Remove plasterboard ceiling and structure | m² | €9.50 / m² | m² | enter quantity- |
| Strip old internal plaster | m² | €8.50 / m² | m² | enter quantity- |
| Remove kitchen unit | pcs | pcs | - | |
| Break out fitted wardrobe | pcs | €50.00 / pcs | pcs | enter quantity- |
| Break out WC soil pipe enclosure | pcs | €35.00 / pcs | pcs | enter quantity- |
| Remove window sills | pcs | €10.00 / pcs | pcs | enter quantity- |
| Rubble removal and disposal | t | t | - | |
| Removal and disposal of asbestos / asbestos cement | m² | €20.00 / m² | m² | enter quantity- |
What a prefab bathroom pod is and when it is removed
A prefab bathroom pod is the factory-made bathroom and WC unit found in many blocks of flats built from concrete panels. The walls and ceiling are chipboard or similar boards with a hard laminate finish. The boards are fixed to a light timber or metal frame. Complete removal leaves an empty space. The bath, basin, WC, tiling, panels and supporting frame all go.
Most people remove a pod when they plan a new bathroom built in blockwork or plasterboard. It is also common when mould appears behind the panels, when the boards swell from damp, or when the layout of the flat is being changed. Removal is the first step of the refit and sits within the wider range of demolition work in a flat. Afterwards you are left with bare concrete walls, exposed risers and temporarily capped services.
What complete pod removal includes
Agree the scope in writing before work starts. It usually includes:
- removing the sanitaryware: bath or shower tray, basin, WC, taps and mirrors,
- removing the laminate wall and ceiling panels, including the timber or metal frame,
- breaking out the original pod floor, if a new floor will be laid,
- removing the boxing around the riser in the WC, if this is planned,
- loading, carrying out and taking away the waste.
Isolating and capping the water, electrics and gas is not always included, and neither is removing brick partitions. If the layout is changing at the same time, for example joining the bathroom and WC into one room, that is further demolition work. The same applies to items such as removing metal door frames set in concrete. These are priced separately.
What to decide before the pod is removed
Some things are hard to change once the pod has gone, so it pays to be clear on these points:
- What replaces the pod. A blockwork or plasterboard bathroom, a shower or a bath, and where the WC will go. This determines whether the floor and riser boxing also need to come out.
- Who follows on after the strip-out. The plumber, electrician and builder should have dates booked before the pod is removed.
- What happens to the risers. Whether they will be replaced and whether the managing agent or freeholder plans to do this for the whole stack.
- How services reach the kitchen. In many blocks the kitchen water and electrics run through the pod. Once it is disconnected, the kitchen may also lose water or power. The plumber and electrician can say in advance whether a temporary connection is possible.
- Where you will wash during the works. With family, at a gym or leisure centre, or another temporary arrangement.
- Where the waste goes. Whether the contractor takes it away or you hire a skip yourself, and where it can stand. A skip on the road usually needs a council permit, which the skip hire firm normally arranges. For a panel-only pod a small skip of around 3 to 4 m³ is usually enough. If the screeded floor or masonry boxing also comes out, allow for a skip for heavy rubble, which has a weight limit. Before you hand over the rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
How prefab bathroom pod removal is carried out
- Protecting the flat and communal areas. Floors along the carrying route, doors and the lift used for waste are covered. A plastic dust screen at the pod entrance greatly reduces dust.
- Isolating the services. The water is turned off at the flat's stopcocks and the bathroom circuit is switched off at the consumer unit. An electrician then disconnects the outlets and terminates them safely. If there is a gas water heater in the pod, only a Gas Safe registered engineer may disconnect it.
- Removing the sanitaryware. Taps, basin, WC and bath are removed in turn. Waste pipes are temporarily plugged so that drain smells stay out and rubble does not fall in.
- Dismantling the panels. The panels are unscrewed or carefully prised off the frame. Work goes from the top down, ceiling first, then walls. Boards are not broken up into small pieces without reason, as large pieces are easier to carry and create less dust.
- Removing the frame and floor. The supporting frame is taken down and, if agreed, the original pod floor. Work around the risers is done by hand, without levering against the pipes.
- Clean-up and inspection. The space is swept or vacuumed, the waste is removed, and the condition of the risers, concrete walls, ceiling slab and floor is checked.
How long pod removal takes
The strip-out itself usually takes one day. It takes longer when tiles are glued to the pod or there is concrete inside, when the floor and boxing are removed, and when there is no lift and carrying out is slow. If the building rules only allow noisy work for a few hours a day, the job stretches to two or three days.
Guide for DIYers
A competent DIYer can remove the sanitaryware, panels and frame using the same steps as above. Only start once the electrics and gas have been professionally disconnected and you have agreed with the managing agent what will happen to the risers. In addition:
- tell the managing agent about the work, check the permitted hours and arrange removal of the building waste,
- after closing the stopcocks, open the taps to drain the remaining water from the pipes,
- wear work gloves, safety glasses and a dust mask of a suitable rating,
- before removing the panels, check with a voltage tester that no live cables run through them.
The riser boxing, a screeded floor and anything that may contain asbestos cement are better left to professionals.
What affects the price of prefab bathroom pod removal
The guide price for the labour is €550.00 per piece. It is charged for the whole pod, not by area. A specific quote may differ depending on these factors:
- Original condition of the pod. The simplest case is a pod that has never been altered, with panels that are only screwed on. Tiles glued directly onto the laminate have to come off with the adhesive, which adds noticeably to the time.
- Earlier alterations. Concrete, masonry or screed inside the pod means conventional breaking out with a breaker, more heavy rubble and more carrying. The price is then much higher than for a panel-only pod.
- Floor and boxing. Removing the riser boxing calls for careful work around old pipework. The pod floor adds more rubble. Both increase the price if included.
- Floor level and lift. A higher floor without a lift and a long route to the van or skip mean more carrying and a higher price.
- Building rules. If demolition is only allowed for a few hours a day, the job runs over more days and costs more.
- Waste removal. Whether loading, transport and the disposal fee are included, or only carrying the waste outside. This is the most common difference when comparing quotes.
- Related work. Disconnecting the electrics, capping water and gas, removing brick partitions and any asbestos removal are usually separate items.
When asking for a quote, send photos of the pod and the hallway and state the floor level and whether there is a lift. Also say whether the floor and boxing should come out.
How to prepare the flat for pod removal
Before the demolition team arrives, the customer can prepare mainly the following:
- clear the bathroom and WC completely, including cabinets, shelves and anything in the washing machine,
- disconnect and move the washing machine if it stands in the pod, and clear the hallway for carrying out; any fitted storage in the way, such as a built-in wardrobe that needs removing, should be agreed in advance,
- test whether the flat's stopcocks really shut off the water. If they let by, the riser will need to be isolated through the managing agent, and this must be arranged in advance,
- have access to the consumer unit and know which circuit serves the bathroom,
- arrange a place for the skip close to the entrance,
- secure parking for the van near the entrance,
- if water meters are located in the pod, agree a reading and the next steps with the managing agent or water supplier before the strip-out.
The job takes longer when the team has to wait for the electrician, when it turns out mid-day that the water cannot be shut off, or when there is nowhere for the skip and the waste has to be handled twice.
Risers, asbestos and gas: where a specialist is needed
Water and soil risers that run through the whole building are not your private pipework. They are part of the communal structure. Replacing them or any other work on them must be agreed with the managing agent, freeholder or housing association. It is often done for the whole stack at once.
In many older blocks the soil stack is made of asbestos cement. As long as it is intact and nobody drills into it, the risk is low. Cutting or breaking it, however, releases hazardous dust. Asbestos cement is not only found in pipes. In some pods the riser boxing or cladding is also made of asbestos cement sheets. If the boxing is hard grey cement board rather than laminate, have the material tested before any demolition. In homes built before 2000, have suspect materials tested before you drill or demolish. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor, and other asbestos materials are also best left to a specialist asbestos removal contractor. If you are unsure what the riser or boxing is made of, leave them alone for now and ask the managing agent.
Electrical outlets should be disconnected and made safe by a qualified electrician. A gas water heater in the pod may only be disconnected and capped by a Gas Safe registered engineer. If you smell gas during the work, do not use switches or naked flames, ventilate the flat and leave. Call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland).
The walls around the pod are often load-bearing in panel-built blocks. Do not cut into them or make new openings without the agreement of a structural engineer and the managing agent.
Permission, managing agent and neighbours
Whether your bathroom refit needs any approval depends on its scope. Replacing a pod with a new bathroom in the same footprint, without touching load-bearing walls or communal services, is the simpler case. Changing the layout, joining rooms or altering load-bearing structures is treated more strictly. Check with your local authority's building control before starting work. If you are a leaseholder, also check your lease, as structural alterations often need the freeholder's written consent. A new circuit, a consumer unit replacement or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.
Always tell the managing agent, freeholder or residents' association about the work in advance. Find out when the building rules allow noisy work and where a skip may stand. A short notice for neighbours on the noticeboard with the demolition dates also helps. Noise and dust cannot be avoided completely, but neighbours who know what to expect complain less.
Typical mistakes in pod removal and their consequences
- Demolition without the circuit switched off. Live cables are hidden in the panels. There is a risk of injury, and damaged wiring then has to be traced and repaired during the new bathroom build.
- Damage to the riser when ripping out the boxing or frame. A crack in the soil pipe may not show at once. It appears as a leak or smell, often only after the new bathroom is tiled, and the repair then means breaking out again.
- Breaking asbestos cement boxing as ordinary rubble. Hazardous dust spreads into the flat and the communal hallway and is difficult to remove.
- Unplugged waste pipes. Rubble falls into the pipework. A blocked drain is hard to clear later and can also cause problems for the neighbours below.
- Rubble put in the communal household bins instead of proper disposal of building waste. This can lead to a dispute with the managing agent and the council.
- No protection for the lift and hallway. The flat owner then pays for any damage.
- Scope not agreed. The contractor leaves and the floor or boxing stays in place. The next tradesperson has to remove it or there is a wait for another strip-out.
- Source of mould not found. If mould behind the panels is only wiped off and the source of the damp is not found, it will return in the new bathroom.
How to sign off the space after pod removal
Before you accept the work and start building the new bathroom, go through the space using this checklist:
- all panels, the frame and the agreed floor have been removed,
- electrical outlets are disconnected, safely terminated and labelled,
- water outlets are closed or capped and nothing is dripping,
- waste pipes are plugged and there is no smell,
- the risers are undamaged, and any cracks have been reported to the managing agent,
- the concrete walls and ceiling slab have no new breakouts or cracks,
- the waste has been removed and you have a waste transfer note or other proof of disposal,
- the hallway, lift and flat are clean with no traces of rubble.
Take photos of the exposed walls and risers. They are useful when planning the new bathroom and in any dispute over who damaged what.
Frequently asked questions
Roughly €550.00 per piece, meaning the whole pod. The price rises with tiles glued onto the laminate, concrete or masonry inside the pod, removal of the floor and boxing, a high floor without a lift, and waste removal if it is included in the quote.
A capable DIYer can dismantle the panels and frame, following the DIY guide above. Electrics and gas are for qualified professionals, any work on the risers must be agreed with the managing agent, and if asbestos is suspected, do not touch the riser or boxing.
The strip-out is only a short part of the project. You will be without a bathroom and WC for the whole refit, which with plumbing, building work and tiling usually takes several weeks. The sooner the trades for the new bathroom are booked, the shorter this will be.
It is building waste and does not belong in household bins. Larger amounts go in a hired skip. Some household waste recycling centres accept small amounts of DIY waste, so check the conditions with your council.
It is not compulsory, but an open pod is a good opportunity. If the risers are old or made of asbestos cement, ask the managing agent whether replacement is planned for the whole stack.
Mould is common behind laminate panels, especially near the bath and the riser. After the strip-out the surface is cleaned and treated with a mould remover. The source of the damp, such as a leaking pipe, must also be found and fixed before the new bathroom is built.
Related work
How a built-in wardrobe is removed, what makes the job harder, what to watch for with fixings and services, and how to check the result.
How a steel door frame is removed from a concrete wall, what makes the job harder, mistakes to avoid and how to check the opening before new doors.
How a brick partition up to 150 mm thick is demolished, what to check first, what makes the job harder and how to check the finished work.
How an old fitted kitchen is taken out, what a qualified professional must disconnect, what you can do yourself and how to check the room afterwards.
How a toilet riser partition is removed, what to watch for in a block of flats and how to check that the shared pipes stayed undamaged.
How old wall tiles are removed, what makes the job harder, how to protect pipes and cables, and how to check the wall before retiling.