Price list 2026 · Europe

Demolition of the old riser toilet partition wall

Removing an old riser toilet partition wall, the boxing in front of the water and soil stacks, usually takes a few hours and is a job for a professional. The guide price is €35.00 per piece, depending mainly on the material and the condition of the pipes.

Updated 09/2026·11 min read·25 price list items
Standard labour price
€35.00/ pcs
Indicative range
€28.00 - €45.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Demolition of the old riser toilet partition wall

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Strip-out and demolition25 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Demolition and dismantling works cost

Break out WC soil pipe enclosurepcs€35.00 / pcspcsenter quantity-
Break out ceramic wall tilesm²m²-
Break out floor tilesm²€9.00 / m²m²enter quantity-
Remove bathpcs€45.00 / pcspcsenter quantity-
Remove WCpcs€25.00 / pcspcsenter quantity-
Remove basinpcs€17.00 / pcspcsenter quantity-
Demolish brick partition wall up to 150mm thickm²m²-
Demolish solid / fair-faced brickworkm²m²-
Demolish concrete wall / partitionm³€150.00 / m³m³enter quantity-
Demolish reinforced concrete slab up to 12 cmm²€54.00 / m²m²enter quantity-
Strip PVC or carpet floor coveringsm²€4.00 / m²m²enter quantity-
Remove floating floor (parquet, linoleum)m²€2.50 / m²m²enter quantity-
Remove door with timber framepcs€25.00 / pcspcsenter quantity-
Cutting concrete and removing steel door framepcspcs-
Break out metal door frame from concretepcs€45.00 / pcspcsenter quantity-
Remove panel radiatorpcs€35.00 / pcspcsenter quantity-
Remove cast iron radiatorpcs€45.00 / pcspcsenter quantity-
Remove plasterboard ceiling and structurem²€9.50 / m²m²enter quantity-
Complete demolition of prefabricated bathroom corepcspcs-
Strip old internal plasterm²€8.50 / m²m²enter quantity-
Remove kitchen unitpcspcs-
Break out fitted wardrobepcs€50.00 / pcspcsenter quantity-
Remove window sillspcs€10.00 / pcspcsenter quantity-
Rubble removal and disposaltt-
Removal and disposal of asbestos / asbestos cementm²€20.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What a riser partition is and when it needs to come out

The partition hides the vertical services of a block of flats in a toilet or bathroom, namely the water risers and the soil stack. There is not much demolition involved. However, the work is done right next to pipes that serve the whole building, so it needs more care than its size suggests.

In older flats, particularly in concrete panel blocks, the partition is often part of the original bathroom core or was built in later. Its purpose is mainly cosmetic: it hides the pipes and provides a surface for tiling. The problem comes when someone needs to reach the services. Behind the partition there are often stopcocks, water meters and sometimes electrical cables as well as the risers.

The most common reasons for removing it are:

  • the building is planning to replace the risers and the contractor needs clear access to the pipes,
  • you are fitting a new bathroom or toilet and changing the layout of the sanitaryware,
  • the partition is waterlogged, mouldy or infested with insects,
  • the old structure has come loose and part of it could collapse.

This job is often done together with stripping out a laminate bathroom core, removing wall and floor tiles or taking out the bath. It fits within wider demolition work during a refurbishment, for example demolition of brick partitions elsewhere in the flat. When everything is planned at once, the rubble only has to be carried out once and new services can be prepared without further breaking out.

What to decide before demolition starts

The demolition itself is quick. Problems usually come from things that were not agreed in advance:

  • Scope of the work. Is only the partition coming out, or also the tiles, flooring and the whole core? This decides whether it makes sense to use one contractor for everything.
  • Timing with the building. If the managing agent is planning to replace the risers, it is sensible to align the removal with that date. The partition is then not demolished twice and the new bathroom is not fitted before the new services are in.
  • New boxing. Before demolition, decide how the services will be covered again and where the access panels to the stopcocks and water meters will go. This determines how far to demolish and which edges to keep.
  • Who removes what. The WC pan, basin, shelves and tiles can be removed by the contractor or by you. Agree this in advance so it is clear what is included in the price.
  • Rubble removal. Ask whether the contractor will also take the rubble away, or whether it stays bagged in the flat for you to arrange collection.
  • Toilet during the works. Without the pan the WC is out of use. If the flat has only one toilet, expect it to be unavailable for several hours or even days until the pan is reconnected.

How the removal is carried out step by step

  1. Agreement with the managing agent. As the risers are a shared part of the building, the date is agreed with the managing agent, freeholder or residents' management company. If the water to the whole riser has to be shut off, this is arranged by the building and the neighbours must be told in advance.
  2. Preparing the room. The WC pan is removed, along with the basin and the tiles on the partition if required. The pan outlet is capped so that no smells come up from the drain and no rubble falls into it. The floor and doors are protected and openings to other rooms are sealed with plastic sheeting against dust.
  3. Checking the material and what is behind it. The partition is carefully opened at one point to see what it is made of and exactly what lies behind it. Only then are the tools chosen.
  4. Demolition. The partition is taken down gradually from top to bottom in small pieces. For brick, a bolster chisel and a light breaker with low impact energy are used; for plasterboard and timber a knife, saw and pry bar are enough. Near the pipes the work is done by hand, not with a breaker at full power.
  5. Carrying out and removing rubble. The waste is packed into strong bags and taken to a site that legally accepts construction waste, or collected by a registered waste carrier. Before you hand over the rubble, check that the carrier is registered with the Environment Agency and ask for a waste transfer note. It does not belong in the household bins at the building.
  6. Cleaning and checking. The room is vacuumed and the condition of the pipes, stopcocks and surrounding walls is checked so that the following trades can start.

Brick, plasterboard or timber partition: what is the difference

The material decides how much dust and rubble there will be and how carefully the work has to be done.

  • Brick or thin partition blocks are common in masonry buildings. Demolition is dusty, there is more rubble and near the pipes it has to be done piece by piece.
  • Aerated concrete blocks are soft and easy to cut and chip. However, the blocks are usually fixed with mortar or adhesive to the adjoining wall and floor, so these residues have to be scraped off afterwards so that the wall can be worked on.
  • Chipboard, laminate panels or timber can usually be dismantled piece by piece without much dust.
  • Plasterboard on a metal stud frame is the simplest: the boards are cut and the studs unscrewed.

In panel blocks, an old cast iron soil stack is often found behind the partition. It is heavy but also brittle and often corroded after many years. A hard blow or sideways pressure can crack a joint or the pipe wall. That is why it must never be used for levering, leaning tools against or holding on to, and the masonry around it is removed so that pieces do not fall onto it.

A special case is older blocks of flats where the soil stack may be made of asbestos cement. Such pipework must not be cut, broken or sanded. If you suspect asbestos, stop work and have the material tested. In homes built before 2000, have suspect materials tested before you drill or demolish. Removal should only be carried out by a specialist asbestos contractor with the training and, where required, the licence for that work. Asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor.

What the price depends on

The guide price for labour is €35.00 per piece. It is charged per partition, not by area, so it helps to know what the standard price assumes and what increases it.

  • Partition material. A brick or block partition takes considerably more work than light boxing made of plasterboard or chipboard. There is more rubble and progress near the pipes is slower.
  • Bonding with surrounding masonry. A free-standing partition comes out faster than one bonded into the wall or core. There the edges have to be separated and cleaned up carefully.
  • Number and condition of services. Old corroded pipework requires hand work and great care, which takes longer and costs more.
  • Tiles on the partition. If the tiles are removed together with the partition, there is more work and rubble. Sometimes this is priced as a separate item.
  • Room size. In a narrow toilet it is hard to handle tools and rubble, so demolition is slower.
  • Floor level and lift. The rubble has to be carried out. A higher floor without a lift means more effort and time.
  • Removal and disposal of rubble. If removal is included, the total is higher than if you arrange it yourself.
  • Surprises behind the partition. If the services turn out to run deeper in the wall, part of the surrounding masonry may need to be cut out too. It is wise to allow for this when agreeing the job.
  • Asbestos. If asbestos cement pipework is found, its removal is not part of the standard price and is carried out only by a specialist contractor.

What makes the job easier and what slows it down

On such a short job, waiting and organisation often take more time than the demolition itself. It helps to:

  • have a clearly agreed date with the managing agent and know who will shut off the water and when,
  • clear the toilet and the route to the front door, removing rugs and fragile items,
  • remove the WC pan and accessories in advance if that has been agreed,
  • arrange space outside the building for parking a van or placing a skip if the rubble is taken away straight away,
  • warn neighbours about noise and dust in the communal areas.

The job takes longer when the tradesperson arrives and the water cannot be shut off because the managing agent was not told, or when there is nowhere in the flat to store the rubble bags. If other strip-out work is planned, such as demolition of a built-in wardrobe or demolition of metal door frames set in concrete, it is worth scheduling it on the same days.

Blocks of flats, permissions and safety

The partition is usually not load-bearing, but this must be checked before demolition, especially if it is not clear how the core was built. If there is any doubt whether the partition supports anything, have it assessed by a structural engineer first.

Whether your particular alteration needs approval, notification or nothing at all should be checked with your local authority's building control. Do not rely on an informal phone call. Separately, you need the consent of the freeholder, managing agent or residents' management company, as the work affects shared services. Your lease may also require written permission for alterations.

There may also be electrical cables behind the partition. Disconnection and any changes to the electrics must be done only by a qualified electrician. A new circuit or work in a bathroom is notifiable under Part P in England and Wales, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. If gas pipework runs through the duct, it must not be damaged or tampered with, and any gas work is for a Gas Safe registered engineer only. If you smell gas, stop work immediately, ventilate, do not use switches and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For LPG, call the number shown on the tank or meter.

The new boxing must allow access to the stopcocks and water meters, usually through access panels. In some buildings the service duct also has a fire separation function, so the new solution should be discussed with the managing agent.

This job is not suitable for DIY. It is done right next to services serving the whole building, electrics, gas or asbestos may be encountered, and a damaged pipe will affect the neighbours too.

Typical mistakes and how they show up later

Demolishing blind without checking what is behind the partition. There is a risk of a drilled or cracked pipe. Sometimes this does not show immediately, only after the water is turned back on, as a damp patch in the flat below.

A heavy breaker right next to old risers. Old pipework cannot take the vibration. Joints can loosen and start leaking only later, often once the new bathroom has been tiled.

Levering against or leaning on the cast iron stack. Brittle cast iron can crack at once, or develop a hairline crack that slowly leaks into the wall and to the neighbours.

Starting work without agreement from the managing agent. When something goes wrong, nobody can shut off the water and the damage spreads to other flats.

Underestimating the rubble. Even a brick partition in a narrow toilet fills a lot of bags. If removal is not arranged, the bags stay in the flat or the corridor and block further work.

Leaving the WC outlet uncapped. Rubble falls into the drain and later causes a blockage, often in the shared stack.

Demolishing without a plan for new boxing. If it is not clear where the access panels will be, the services end up permanently enclosed and the boxing has to be broken out again for a repair or a meter reading.

How to check the finished work

  • the partition has been removed to the agreed extent and the wall edges are cleaned of mortar residue,
  • the risers, branches and fittings show no cracks, scrapes or loose joints,
  • after the water is turned back on, nothing drips and the soil pipe does not leak,
  • the stopcocks and water meters are undamaged and can be operated,
  • the WC outlet is capped and free of rubble,
  • electrical cables in the duct are undamaged or have been made safe by an electrician,
  • surrounding walls, floor and doors are not damaged beyond what was agreed,
  • the rubble has been carried out and taken away and the communal areas are left clean,
  • the room is vacuumed and ready for the next trades.

Frequently asked questions

The guide price is €35.00 per piece. The final price depends on the partition material, any tiles on it, the condition of the services, the floor level and whether rubble removal is included.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.