Price list 2026 · Europe

Removing a washbasin

Removing a washbasin means disconnecting it from the water supply and waste, releasing it from the wall or vanity unit and taking it away without damaging the tiles or valves. The guide price is €17.00 per piece, depending mainly on the basin type and the condition of old joints.

Updated 09/2026·10 min read·25 price list items
Standard labour price
€17.00/ pcs
Indicative range
€13.60 - €22.10
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Removing a washbasin

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Strip-out and demolition25 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Demolition and dismantling works cost

Remove basinpcs€17.00 / pcspcsenter quantity-
Break out ceramic wall tilesm²m²-
Break out floor tilesm²€9.00 / m²m²enter quantity-
Remove bathpcs€45.00 / pcspcsenter quantity-
Remove WCpcs€25.00 / pcspcsenter quantity-
Demolish brick partition wall up to 150mm thickm²m²-
Demolish solid / fair-faced brickworkm²m²-
Demolish concrete wall / partitionm³€150.00 / m³m³enter quantity-
Demolish reinforced concrete slab up to 12 cmm²€54.00 / m²m²enter quantity-
Strip PVC or carpet floor coveringsm²€4.00 / m²m²enter quantity-
Remove floating floor (parquet, linoleum)m²€2.50 / m²m²enter quantity-
Remove door with timber framepcs€25.00 / pcspcsenter quantity-
Cutting concrete and removing steel door framepcspcs-
Break out metal door frame from concretepcs€45.00 / pcspcsenter quantity-
Remove panel radiatorpcs€35.00 / pcspcsenter quantity-
Remove cast iron radiatorpcs€45.00 / pcspcsenter quantity-
Remove plasterboard ceiling and structurem²€9.50 / m²m²enter quantity-
Complete demolition of prefabricated bathroom corepcspcs-
Strip old internal plasterm²€8.50 / m²m²enter quantity-
Remove kitchen unitpcspcs-
Break out fitted wardrobepcs€50.00 / pcspcsenter quantity-
Break out WC soil pipe enclosurepcs€35.00 / pcspcsenter quantity-
Remove window sillspcs€10.00 / pcspcsenter quantity-
Rubble removal and disposaltt-
Removal and disposal of asbestos / asbestos cementm²€20.00 / m²m²enter quantity-
Total labour
- enter quantity
Create quote from price list →

What the removal includes and when it is needed

The tap, the trap and the flexible tap connectors usually come off with the basin. A pedestal, semi-pedestal or vanity unit is removed as well. The water supply pipes and waste pipe in the wall stay in place. Altering them, replacing the isolating valves or repairing tiles are separate jobs that need to be ordered on their own.

Removal is typically needed in these situations:

  • when refurbishing a bathroom or cloakroom,
  • when replacing a cracked, worn or dated basin,
  • when repairing the water supply or waste pipework behind the basin,
  • when the tiling behind the basin is being replaced,
  • when the basin is moving to a different position or being swapped for a basin with a vanity unit.

It is often one of the first steps of a refurbishment, done together with removing the bath, shower enclosure or WC. On a larger strip-out it sits alongside other demolition work, such as taking out a built-in wardrobe in the same flat or house.

What to agree before the work starts

Disconnecting a basin is a short job. Most misunderstandings come from things that were not agreed in advance. It is worth deciding:

  • What happens to the basin: if it is to be reused or sold, it needs careful handling. If it is going to waste, agree whether the tradesperson takes it away or you dispose of it yourself.
  • Whether the tiles are to be kept: if the tiling stays, the silicone is cut and the basin must not be levered off by force. If the tiles are coming off anyway, less care is needed around the basin and the job is quicker.
  • What happens to the wall fixings: whether the bolts should be unscrewed, cut off or left for a new basin with the same fixing centres.
  • Capping the supplies and waste: if the bathroom will be without a basin for some time, the valves and waste are capped so that water can be used safely elsewhere in the home and no smell comes back.
  • Replacing the isolating valves: with old valves it makes sense to decide in advance that they will be replaced. It is extra plumbing work, but it is easiest while the area is open.
  • Shutting off a shared supply: in a block of flats it may be necessary to turn off the water to more than one flat. Agree the time with the managing agent or residents' association well ahead, so neighbours know when the water will be off.
  • Water heater under the basin: if it is hard-wired rather than plugged in, the electrical disconnection should be done by a qualified electrician, and this needs to be arranged before the removal. The water side matters too: the cold feed to the heater is turned off, pressure is released by opening the hot tap, and the heater is drained, otherwise all its water will pour out when it is disconnected. A pressurised (unvented) heater has a safety valve on the inlet. It must not be removed without replacement, and if the heater is refitted, the valve must be fitted back with it.

If a new basin is planned in a different position or at a different height, have the dimensions of the new basin and the position of its waste ready. The tradesperson can then see straight away whether removal is enough or whether the pipework will need moving.

Types of washbasin and what they mean for removal

  • Wall-hung basin on bolts: the simplest case. A standard wall-hung basin is held on two bolts or threaded studs in the wall, sometimes on metal brackets. Once the water and trap are disconnected, it usually lifts off easily.
  • Basin with a pedestal or semi-pedestal: the ceramic pedestal under the basin is either fixed separately or simply rests in place. It must come off first so that it does not fall and break.
  • Basin on a vanity unit: the unit is usually screwed to the wall and the basin sits on top of it or is bonded with silicone. Both the basin and the unit are removed.
  • Inset or countertop basin: it is bonded to the worktop with silicone or adhesive. The joint has to be cut carefully, which takes longer.
  • Basin built into tiling or a masonry counter: this is already demolition work. It often cannot be done without damaging the surroundings, and retiling should be expected.

How a washbasin is removed, step by step

  1. Turning off the water: the isolating valves under the basin are usually enough. If old valves leak or will not turn, the main stopcock for the flat or house is closed, and in a block of flats sometimes the shared supply. Opening the tap confirms that the water really is off.
  2. Disconnecting the supplies: the flexible tap connectors are unscrewed from the valves. The valve is held with a second spanner so that it does not twist in the wall.
  3. Disconnecting the trap: the trap holds water, so a bucket or cloth goes underneath. The nuts are loosened and the trap is pulled out of the waste outlet.
  4. Sealing the waste: the waste pipe in the wall is closed straight away with a bung or at least a cloth, otherwise drain smells will come into the bathroom.
  5. Cutting the silicone: the silicone joint between the basin and the tiles is cut with a knife. With a countertop basin, the joint with the worktop is cut as well.
  6. Removing the pedestal or unit: a pedestal comes off first, and a vanity unit is unscrewed from the wall, depending on how the basin is fitted.
  7. Releasing the fixings: the nuts on the fixing bolts are undone, the basin is supported, carefully lifted and set down. A second person helps with a heavy basin.
  8. Bolts in the wall: as agreed, they are unscrewed, cut off or left for the new installation.
  9. Checking the valves: if the main stopcock or shared supply was closed, it is opened slowly while watching whether the isolating valves and their joints in the wall drip. If closing the isolating valves was enough, they are checked for drips after the connectors come off.
  10. Cleaning up and removal: silicone residue is cleaned off the wall, and the basin, trap and other waste are taken away or stored as agreed.

What affects the price of removal

The guide price for the labour is €17.00 per piece. It is charged per basin, so the final amount depends mainly on how difficult the particular basin is to take off.

  • Basin type: a fairly recent wall-hung basin with working isolating valves, a plastic trap and good access is the basic case. A basin with a vanity unit or pedestal adds several steps, and the price is usually slightly higher.
  • Bonded and inset basins: a basin bonded to a worktop or set into tiling takes considerably longer, up to twice a standard removal. A basin built into masonry or a masonry counter is demolition work and is often priced separately.
  • Size and weight: a large double basin or a heavy cast stone basin needs two people and more careful handling, which raises the price.
  • Condition of the old installation: in practice valves are often seized with limescale, wall bolts rusted and the trap clogged with deposits. Bolts then have to be cut, valves replaced and the job takes longer, sometimes by tens of percent.
  • Keeping the tiles: if the tiling must stay undamaged, the work is slower and more careful.
  • Heater under the basin: draining it and disconnecting the water is extra work, and the electrical disconnection is paid to the electrician separately.
  • Removal and disposal: if the basin is to be taken away and disposed of, transport and a waste charge are added, often as a separate item.
  • Capping for later fitting: capping the waste and supplies with bungs and blanking caps is a small extra job, as is replacing the isolating valves.

If the pipework in the wall turns out to need replacing, this is plumbing work beyond the removal itself. Larger changes to shared pipework in a block of flats should be discussed with the managing agent.

How to prepare the bathroom so the work goes quickly

  • clear the vanity unit, shelves and items around the basin so there is free access to the valves and trap,
  • if the mirror or shelves above the basin should come off too, say so in advance, not on the day,
  • find the main stopcock and check that it is accessible and turns,
  • clear a space on the floor with a blanket or cardboard to put the basin down,
  • cover the bath or shower tray so tools or falling fragments do not damage it,
  • make sure there is electricity in the bathroom for lighting and tools.

The job takes longer if it turns out on the day that the main stopcock leaks or is blocked by furniture. Then there is waiting and a last-minute search for a solution.

Typical mistakes and how they show up later

Water not turned off, or not fully off

One old valve that only looks closed is enough to flood the bathroom. In a block of flats the water can also come through to the neighbours below.

Levering the basin off by force

Without cutting the silicone, a piece of tile can easily break off. Matching tiles are often impossible to find years later, and the repair then spreads over a larger area.

Too much force on the valves

The valve twists in the wall or a thread cracks, and water starts leaking into the masonry. It only shows later as a damp patch or mould on the wall.

Waste left open

Drain smells come into the bathroom, and debris can fall into the pipe during further work. Mortar or adhesive residue in the waste later causes a blockage.

Underestimating the weight

Ceramic is heavy and brittle. If dropped, it shatters and can injure feet. Shards can also scratch the bath or floor tiles.

Heater not drained

If the heater is disconnected without closing the feed and draining it, its water ends up on the floor. If the safety valve is left out when it is refitted, the heater is not protected against excess pressure.

Basin in the household bin

A basin counts as small-scale construction waste and usually goes to the household waste recycling centre, according to your local council's rules.

How to check the finished work

  • the isolating valves are closed and do not leak once the main stopcock is opened,
  • the waste outlet is sealed with a bung and there is no smell from the drain,
  • the tiles around the basin are not chipped or cracked, and any damage was agreed in advance,
  • no bolts are left sticking dangerously out of the wall, or they have been removed as agreed,
  • there is no water under the basin position or on the floor,
  • a hard-wired electric heater has been disconnected by an electrician and its water feed is closed,
  • the basin, trap and other waste have been taken away or stored as agreed,
  • the area is ready for the next work or for fitting the new basin.

If the next step is a wider strip-out, such as demolishing brick partitions or removing metal door frames set in concrete, the capped valves and waste should be protected from rubble.

How to remove a wall-hung washbasin yourself

A standard wall-hung basin is a manageable DIY job. The procedure is the same as in the steps above, so here are just a few extra practical tips.

Tools: two adjustable spanners, or one spanner and a pair of water pump pliers, a screwdriver, a silicone knife, a bucket and cloths. For a heavier basin, ask a second person to help.

  • When unscrewing the connectors, hold the isolating valve with a second spanner, not by hand. A hand cannot reliably stop the valve twisting in the wall.
  • Put a bucket under the trap before loosening it - the water in it is dirty and smells.
  • Cut the silicone all the way round before trying to lift the basin. If it will not move, look for another joint rather than levering.
  • Put a basin that is to be reused on a soft surface.
  • If the main stopcock was closed, open it slowly and watch the valves for a few minutes.

Stop and call a plumber if a valve will not close, leaks, or moves in the wall while the connector is being loosened. Do not disconnect a hard-wired electric heater yourself.

Frequently asked questions

The guide price is €17.00 per piece. Expect to pay more for a basin bonded to a worktop or set into tiling, a heavy or double basin, seized valves and rusted bolts, and if removal and disposal are added.

Related work

Blog

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.