Fencing: cost in 2026, fence types, foundations and the right sequence

Fencing covers foundations for fences, block walls built from concrete fencing blocks, panel systems, mesh fencing and posts. The main factors are ground bearing capacity, water, frost, wind and how the gate is anchored. Current labour rates can be worked out directly from the type and quantity of construction.

Updated 09/2026·16 min read·24 price list items
Standard labour price
4,00 €/ pcs
Indicative range
3,20 € - 5,20 €
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page
Short answer

Laying concrete fencing blocks costs 4,00 € per piece of labour, according to the current price list. The foundation, reinforcement, concrete infill, posts, coping, gate and groundworks are priced separately according to the project and site conditions.

Types of work and their prices

4,00 €
per pcs
Block Fence Wall

Fencing blocks form a plinth, a solid wall or piers. The foundation, reinforcement and infilling of cavities must match the manufacturer's system and the structural design.

22,00 €
per lm
Fence Posts

Posts carry the load from infill panels, the wicket gate and the main gate. For moving elements, the anchoring and foundation stiffness are what matter most.

per m²

Once reinforced and filled with concrete, these form a solid load-bearing section of the wall. The dimensions and reinforcement are set by the design, not just the fence height.

20,00 €
per lm

Fast installation of posts and precast panels. It needs accurate spacing, stable footings and safe handling of the panels.

2,50 €
per lm

A light and economical way to mark a boundary. The result depends on correct tensioning, end posts, struts and tensioning wires.

per pcs

Stiffer than mesh and also suitable on top of a low wall. Post spacing and changes in ground level need to be respected.

Fencing price list 2026

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Foundations and fencing24 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal
Fencing
Laying concrete fence blockspcs4,00 € / pcspcsenter quantity-
Building fence pierslm22,00 € / lmlmenter quantity-
Install concrete fencing up to 1.8 mlm20,00 € / lmlmenter quantity-
Install concrete fencing up to 2.1 mlm23,00 € / lmlmenter quantity-
Install concrete fencing up to 2.4 mlm24,00 € / lmlmenter quantity-
Fencing with DT 12/15 blocksm²m²-
Fencing with DT 20/25 blocksm²m²-
Remove old fencinglm8,80 € / lmlmenter quantity-
Install fence post up to 2.4 mpcs25,00 € / pcspcsenter quantity-
Install fence post up to 2.7 mpcs28,00 € / pcspcsenter quantity-
Install fence post up to 3.8 mpcs35,00 € / pcspcsenter quantity-
Install fence strut up to 2.7 mpcs1,70 € / pcspcsenter quantity-
Install barbed wire extension armpcs1,40 € / pcspcsenter quantity-
Tension straining wirelm0,50 € / lmlmenter quantity-
Tension barbed wirelm0,75 € / lmlmenter quantity-
Install fence framepcspcs-
Install bespoke fence framepcspcs-
Install fence panelspcspcs-
Install mesh fencing up to 1.4 mlm2,50 € / lmlmenter quantity-
Install mesh fencing up to 1.8 mlm2,70 € / lmlmenter quantity-
Install mesh fencing over 3.0 mlm3,70 € / lmlmenter quantity-
Blockwork corner bondingpcs1,00 € / pcspcsenter quantity-
Foundations
Concrete foundation for fencem³70,00 € / m³m³enter quantity-
Other works
Other unspecified work in tradehrhr-
Total labour
- enter quantity
Create quote from price list →

How much it costs by scope

Model Scope for a 20 m Block Fence
Laying 300 Fencing Blocks
Block-laying labour only, excluding the foundation and posts.
1200,00 €
Blocks and Four Posts
300 blocks and a total of 8 m of built-up posts.
1376,00 €
Foundation and Block Wall
A model 4.8 m³ of foundation, 300 blocks, 8 m of posts and 4 bonded corners.
1716,00 €
The total covers only the listed labour items. Quantities are illustrative, not a construction design. Groundworks, steel, concrete, infill panels, the gate, transport and waste removal are added according to actual needs.

Types of materials and their cost

Concrete Fencing Blocks
depends on the system

Face blocks for a solid wall, plinth or piers. They must be rated for outdoor use and protected against water ingress from above.

Formwork Blocks
depends on size

Permanent formwork that is reinforced and filled with concrete. A hollow block alone is not yet a finished load-bearing structure.

Concrete and Reinforcing Steel
depends on design

The concrete class, bar diameter, cover and connection between the foundation and posts all follow from the loads and ground conditions.

Waterproofing
depends on the build-up

A horizontal damp-proof layer separates the masonry from rising damp. Where it meets the ground, vertical protection is also needed.

Coping Stones and Caps
depends on profile

The top edge must shed water away from the face of the wall. An overhang, fall and drip groove reduce staining and water damage.

Infill Panels
depends on choice

Metal, timber or composite panels change the wind load on the structure. A solid infill transfers greater forces onto the piers than an open panel.

Preparation and build sequence for a fence

01
Setting Out the Boundary

Before digging, the ownership boundary, gate position, utilities and the connection to the road are all checked. A fence should never be positioned purely on old posts or a kerb.

02
Assessing Ground and Water

The site slope, rainwater run-off, made-up ground and the level difference between plots are all assessed. A fence should not end up unintentionally acting as a retaining wall.

03
Designing the Foundation

The width, depth, reinforcement and layout of the foundation are chosen according to the ground, the fence height and weight. Dynamic and wind loads are factored in at the gate and solid sections.

70,00 €/m³
04
Ducts and Gate Equipment

Conduits for power, photocells, a bell, lighting and gate control are fitted before concreting. Later core drilling can compromise the reinforcement cover.

05
Reference Level

The highest point, the step heights and the position of coping elements are set out. On sloping ground, individual panels are stepped so they stay stable and visually level.

Method of work

  1. 01The fence line, corners, piers, wicket gate and vehicle gate position are marked out. Utilities and the plot boundary are checked before digging.
  2. 02The trench is dug down to firm, load-bearing ground. Soft spots, made-up ground or standing water are not simply covered with a thicker layer of concrete.
  3. 03The base, formwork and reinforcement are prepared. Vertical bars for piers are tied into the foundation, not loosely placed into the hole afterwards.
  4. 04The foundation is poured and its top surface levelled. Fresh concrete is protected from rapid drying out, rain and frost.
  5. 05Once sufficient strength is reached, horizontal waterproofing is applied. It must be continuous and carried through at corners and posts.
  6. 06The first course of blocks is set out dead level. Subsequent courses are laid in bond, with direction, height and plumb checked continuously.
  7. 07Cavities are reinforced and filled according to the system. Concrete is placed so that no voids remain and the blocks are not damaged by pressure.
  8. 08Long runs, changes in height and junctions between different structures are separated by a designed movement joint. The joint must run through the whole build-up.
  9. 09Anchors for infill panels, hinges and the gate drive are fixed into the load-bearing part of the posts. Expansion anchors are not placed close to the edge of a hollow block.
  10. 10The top edge is finished with a coping stone or cap with a fall and drip. The finished masonry is cleaned and inspected before handover.
Tools
  • Rotary laser and levelling instrument
  • Bricklayer's line, spirit level and plumb bob
  • Vibrating equipment to suit the concreting method
  • Bar bender and tying tools for reinforcement
  • Block cutter with dust extraction
  • Tape measure, square and spacing templates

Most common mistakes

01
Fence Built without Assessing the Ground

Made-up ground or clay soil moves as moisture changes. The result is sagging sections, leaning posts and cracks that surface repairs cannot fix.

02
Missing Waterproofing

Water rises into the blocks, freezes in winter and leaves staining on the surface. Waterproofing cannot be properly added once the wall is built.

03
No Break in a Long Run

Concrete and masonry change volume with temperature and moisture. Without designed joints, the stress is released as a random crack.

04
Weak Piers at the Gate

The drive, hinges and wind create forces that an ordinary fence panel does not have to resist. A gate pier needs its own properly designed reinforcement, anchoring and foundation.

05
Flat Coping without a Drip

Water runs down the face, carries dirt into the joints and increases the risk of staining and frost damage. The top should have a fall and an overhang.

06
Pouring a Cavity in One Go

Too high a column of fresh concrete can shift or crack the blocks. The pour height and mix consistency are governed by the system's instructions.

Types of fence: masonry, precast concrete, panel and mesh

A fence is not one single type of structure. A low plinth wall under a steel infill carries different loads from a two-metre solid wall built of blocks. A precast concrete fence stands on set posts, while panel fencing and mesh sit on anchored posts with smaller footings. A gate pier takes the weight of the leaf, the impact when it closes and the effect of wind.

So the first step is not choosing the colour of the block. The purpose of the fence, its height, the bay length, the gate position, changes in ground level and the route of underground services are settled first. With solid infills, the area exposed to wind is assessed as well. Loads pass through piers and posts into the foundation, so the visible part cannot be designed separately from what lies below ground.

For a fence, the key factors are water, frost, the stability of a free-standing structure and the durability of the top edge. Whatever the type, materials are used in line with the manufacturer's technical data sheet, and taller or solid fences also follow a structural design.

Fence foundations and protecting masonry from water

The foundation is placed on load-bearing ground. If the excavation ends in made ground, waterlogged soil or a spot with an uncontrolled inflow of water, simply adding more concrete does not deal with the cause of movement. Foundation size depends on the soil, local frost conditions, the height and weight of the fence, the spacing of piers and the load from the gate. There is no universal size that suits every plot.

The concrete foundation and the masonry have to work together, yet the masonry is also separated from rising damp. A horizontal damp-proof course runs continuously under the first course. Junctions at posts and corners must not leave an open path for water. Where one side is against the soil, vertical protection and drainage are added to suit the conditions.

Water must not stay trapped in the block cores either. The top edge is closed with a coping or pier cap that has a fall, an overhang and a drip groove. Joints in the copings are detailed so that rainwater does not run into the masonry. Long-term water ingress shows up as efflorescence, staining, damaged joints and a surface gradually broken down by frost.

Blocks, precast units, panels or mesh

Facing fence blocks suit plinths, piers and solid walls. The manufacturer specifies the reinforcement, the recommended concrete fill, the height of one pour and how joints are formed. Hollow formwork blocks act as permanent formwork and, once filled with reinforced concrete, form a load-bearing core. Their surface is usually finished afterwards.

Precast concrete fencing shortens installation time but needs accurate post spacing and height. Heavy panels are lifted into place safely without damaging their edges. Panel fences are lighter and more open, so they put less wind load on the foundations than solid bays. Mesh is economical over long runs, but its stability comes from correctly set end and corner posts, struts and line wires.

Combined fencing often joins a masonry plinth and piers with steel, timber or composite infills. The design allows for the real weight and openness of the infill. Swapping a light bay for a solid, opaque infill later on can increase the wind load considerably.

Reinforcement, posts, gates and service ducts

The vertical reinforcement of piers is anchored into the foundation and tied to the horizontal reinforcement as designed. Bars are placed with the specified cover, not right against the surface. Cores must be clean before concrete is poured. Concrete goes in at sensible lifts so that it fills the space without voids and without pressure that could shift or damage the blocks.

Gate and pedestrian gate piers are the most heavily loaded part of a fence. A sliding gate needs space to run back, a straight line of travel and a foundation for its running gear. A swing gate transfers a moment into the piers through its hinges. Fixings for the motor, stops and hinges are prepared in the load-bearing core, not only in the thin wall of a hollow block.

Electrical ducts for the gate motor, photocells, doorbell, lighting and access control are laid before the concrete is poured. Their position is recorded. Drilling blind later on can hit reinforcement or weaken the protection of the pier.

Movement joints, corners and changes in height

Concrete, masonry and metal infills respond differently to temperature and moisture. A long, unbroken fence therefore needs planned joints. They are placed mainly at changes in height or thickness, where different materials meet and where the foundation type changes. The exact spacing is set by the system, the geometry and the design.

A movement joint has to pass through the structure so that it allows the expected movement. Cutting only the render is not enough. The joint filler stays flexible and resistant to water and weather. A construction joint left after a break in pouring is not automatically a movement joint.

Corners are bonded in the way specified for the particular block. Irregular cutting must not create a continuous vertical joint with no bond. Steps in height on a slope are planned from a reference level so that they come out in whole modules and the copings keep a safe fall.

Weather and curing time

Blockwork and concrete pours are planned around the conditions given by the manufacturer of the mortar, adhesive and concrete used. A frozen base, water in the cores or overnight frost can spoil fresh work. In heat and wind, fresh concrete is protected from losing water too quickly, and in rain from having its surface washed out.

Further courses are not loaded until the previous stage has reached the strength it needs. Time is not the only test, because setting depends on temperature, mix and the size of the element. Copings, infills and the gate are fitted only once the structure is stable and ready.

Unfinished masonry is covered from above, not sealed airtight on every side. The aim is to keep water out of the cores while still letting the wall dry. Moisture and the condition of the substrate are checked before any surface finish goes on.

Quality checks during the work

Before concrete is poured, the reinforcement, ducts and junctions are photographed, because once they are covered they can no longer be inspected. For the foundation, position, level, width and the readiness of the formation are checked. Before the first course, the damp-proof course is checked for level and continuity.

During blockwork, a string line, spirit level, plumb line or laser is used. Line, plumb, equal course height, corner bonding and clean faces are checked. A deviation in the first courses grows higher up and makes it harder to fit infills and copings.

At handover, drainage, surface, joints, cracks, infill fixings and gate operation are checked. The client should receive details of the system used, where the ducts run and the recommended maintenance. Records of the hidden layers are worth more than a later assurance that the reinforcement was done properly.

Boundary, neighbours and local rules

Before materials are ordered, the boundary shown on the plans is compared with what is actually on the ground. An old fence, kerb or row of trees does not necessarily follow the legal boundary. If boundary points are unclear or the new structure will stand right on the line, its position should be set out by a qualified land surveyor. This check costs less than moving a finished foundation or settling a dispute afterwards.

Whether permission is needed depends on size, position, the area and the local building regulations. Before work starts, the requirements of the local planning authority are therefore checked. Particular care is needed where the fence meets a public road, for visibility at the exit, near service easements and in areas with design controls such as conservation areas. A fence that retains soil, spans a large level difference or uses an unusual structure needs a professional assessment.

An agreement with the neighbour does not replace technical design or the required procedure with the authority, but it prevents practical disputes. Access during the work, protection of the neighbour's planting, the direction of water run-off and the final finish on both sides are agreed in advance. Rainwater from the plot or from the fence copings should not be deliberately directed onto the neighbouring plot.

Gates are designed so that they do not obstruct safe movement on the pavement or road. For an automatic gate, safety devices, manual release and the space needed for the full leaf movement are planned alongside the power supply. Opening sizes are matched to the vehicles that will actually use them and the approach direction, not only to the width of a car driving straight in.

Maintenance, repairs and service life of a fence

A finished fence is not only checked at handover. After winter and after heavy rain, new cracks, open joints, leaning posts, loose fixings and places where water collects are looked for. White efflorescence on its own does not necessarily mean a structural fault, but it does point to moisture movement. The source of the water is dealt with first, and only then is the surface cleaned.

A hairline surface crack means something different from a crack that runs through the whole section or keeps opening. Before repair, its position and width are recorded and watched for a while. An active crack is not simply closed with hard mortar, because the movement will reappear next to the repair. Where a foundation settles, a pier leans or a gate develops a fault, the cause is found and stability is assessed.

Metal infills and fixings are checked for damaged protective coatings and corrosion. Timber parts need recoating according to exposure and the system used. Moving gate parts are cleaned, adjusted and serviced to the manufacturer's instructions. Lubricant is not applied without thought where it would collect dust or be unsuitable for the motor.

When the infill is changed, it is checked whether the piers and fixings can carry the new load. Replacing mesh with solid panels changes the wind effect fundamentally. In the same way, raising a fence later changes the lever arm through which forces act on the foundation. A change in appearance can therefore be structurally significant even when the original masonry stays as it is.

Service life is extended by regularly clearing soil and vegetation, keeping drainage free and repairing open joints in good time. Climbing plants are trained on a separate support if their roots or weight would load joints and copings. In winter, long contact between aggressive de-icing products and the plinth or metal parts is limited.

Frequently asked questions

Laying concrete fencing blocks costs 4,00 € per piece of labour, according to the current price list. The foundation, reinforcement, concrete infill, posts, coping stones, infill panels and gate are priced separately.

Related work

Fencing
Old Fencing Removal

How old fence removal works, including posts and footings, what makes the job harder, what to check before you start and how to inspect the result.

Fencing
Installation of Concrete Fencing up to 1.8 m

How a concrete panel fence up to 1.8 m is installed, what foundations it needs, what to check about permission and how to inspect the finished fence.

Fencing
Installing a concrete panel fence up to 2.1 m high

How a concrete panel fence up to 2.1 m is installed, what footings and posts it needs, how it differs from lower and taller fences and what to check.

Fencing
Concrete panel fence installation up to 2.4 m

How a 2.4 m concrete panel fence is built: footings, posts, wind load, slopes, preparation and handover. How it differs from 1.8 m and 2.1 m fences.

Fencing
Concrete shuttering block fence, 12 and 15 cm (DT 12/15)

How a fence of 12 and 15 cm concrete shuttering blocks is built, when thin blocks are enough, materials, typical mistakes and how to check the work.

Fencing
Construction of DT 20, 25 Formwork Block Fencing

How a fence of DT 20 and DT 25 formwork blocks is built, which block width to choose, what foundations it needs and what to check at handover.

Fencing
Installation of Fence Posts up to 2.4 m Height

How a fence post up to 2.4 m is set in concrete, how deep the hole should be, which post to choose and how to check the finished work.

Fencing
Setting a fence post up to 2.7 m long

How a fence post up to 2.7 m is set: footing depth, concrete, spacing, how it differs from 2.4 m and 3.8 m posts, and what to check at handover.

Fencing
Setting a fence post up to 3.8 m

How a tall fence post up to 3.8 m is set: footing depth, concrete, struts, wind load and checks. How it differs from 2.4 m and 2.7 m posts.

Fencing
Installation of a Fence Post Brace up to 2.7m

How to fit a fence post brace up to 2.7m: where it goes, which angle and footing to choose, what concrete to use and how to check the finished job.

Fencing
Installation of Fence Topping Security Bracket

How security brackets are fitted to fence posts, which type to choose, what to watch with barbed and razor wire, and how to check the finished work.

Fencing
Tensioning Straining Wire

How straining wire is tensioned on a mesh fence, which materials to choose, which mistakes to avoid and how to check the wire holds the mesh straight.

Fencing
Barbed Wire Tensioning

How to tension barbed wire between posts, which wire and fittings to choose, what makes the job harder and how to check the finished fence.

Fencing
Fence Frame Installation

How fence frames are fixed to posts, which material to choose, what makes the job harder and how to check the finished fence.

Fencing
Bespoke Fence Frame Installation

How a made-to-measure fence frame is fitted, when you need one, what makes the job harder and what to check before you accept the work.

Fencing
Panel Fencing Installation

How welded mesh fence panels are installed, which posts and footings to choose, what makes the job harder and how to check the finished fence.

Fencing
Installing Mesh Fencing up to 1.4 m

How low mesh fencing up to 1.4 m is installed, what to prepare, how to tension it so it does not sag, and what to check when you accept the fence.

Fencing
Chain Link Fencing Installation up to 1.8 m

How chain link fencing up to 1.8 m is installed: posts, line wires, tensioning, common mistakes and how to check the finished fence.

Fencing
Fitting Chain-Link Mesh over 3.0 m High

How tall fence mesh over 3 m is fitted for sports pitches, courts and sites: posts, line wires, joining panels, work at height and final checks.

Fencing
Bonding Wall Corners

How to bond the corner of a brick or block garden wall correctly, which mistakes cause cracks, and how to check the finished corner.

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.