A complete turnkey renovation of a flat in a block costs roughly €14,300 - €17,900 for a studio (36 m²), €16,900 - €21,200 for a 1-bedroom flat (55 m²), €19,000 - €23,900 for a 2-bedroom flat (70 m²) and €21,200 - €26,700 for a 3-bedroom flat (85 m²), always including standard-grade materials. Labour alone, based on the current price list, comes to €8568.13 - €12718.53. The price covers a new bathroom and WC, rewiring, skimming and painting, laminate floors, internal doors and kitchen fitting. Kitchen units, appliances, furniture, light fittings, windows, the electrical installation certificate and rubble removal are extra.
Types of work and their prices
Strip-out of the old bathroom and separate WC, new partition walls, pipework, waterproofing, tiling and sanitaryware. The most expensive and slowest part of the whole job.
New copper cabling, back boxes, sockets and switches throughout the flat. The price for the package goes up with the number of rooms.
Once channels are chased and the old services replaced, concrete walls and ceilings are skimmed all over so the paintwork comes out smooth.
Concrete floors in blocks of flats are often uneven, even from room to room. A self-levelling compound evens them out before the laminate goes down.
Laminate or vinyl on an underlay in the rooms and hallway, plus skirting and threshold strips.
Old steel door frames are taken out and replaced with timber linings and architraves. Wall thickness and finished floor height matter when ordering.
Building work price list: Flat renovation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Preparatory work | ||||
| Complete demolition of prefabricated bathroom core | pcs | €490.00 / pcs | pcs | enter quantity- |
Masonry cost | ||||
| Partition walling up to 12.5 cm (brick/Ytong) | m² | €19.00 / m² | m² | enter quantity- |
| Fine lime-cement render (Feinputz) | m² | €9.50 / m² | m² | enter quantity- |
Preparation | ||||
| Primer application before tiling | m² | €1.90 / m² | m² | enter quantity- |
| Waterproofing (bathroom) | m² | €7.00 / m² | m² | enter quantity- |
| Installation of waterproofing sealing tape in corners | lm | €8.70 / lm | lm | enter quantity- |
| Priming walls and ceilings | m² | €1.00 / m² | m² | enter quantity- |
| Skimming walls | m² | €6.50 / m² | m² | enter quantity- |
| Skimming ceilings | m² | €7.50 / m² | m² | enter quantity- |
| Subfloor priming | m² | €1.90 / m² | m² | enter quantity- |
| Self-levelling compound | m² | €6.90 / m² | m² | enter quantity- |
| Perimeter expansion tape | lm | €2.50 / lm | lm | enter quantity- |
Wall and floor tiling cost | ||||
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
Sanitaryware cost | ||||
| Installation of bath including boxing in | pcs | €120.00 / pcs | pcs | enter quantity- |
| Fit and connect wall-hung WC pan | pcs | €45.00 / pcs | pcs | enter quantity- |
| Install small basin including tap | pcs | €45.00 / pcs | pcs | enter quantity- |
Sanitaryware installation cost | ||||
| Basin installation | pcs | €35.00 / pcs | pcs | enter quantity- |
| Basin mixer tap installation | pcs | €25.00 / pcs | pcs | enter quantity- |
| Bath / shower mixer tap installation | pcs | €55.00 / pcs | pcs | enter quantity- |
Accessories | ||||
| Installation of extractor fan | pcs | €45.00 / pcs | pcs | enter quantity- |
| Fixing of mirror | pcs | €40.00 / pcs | pcs | enter quantity- |
| Installation of bathroom accessories (holders, hooks) | pcs | €12.00 / pcs | pcs | enter quantity- |
Finishes cost | ||||
| Wall tiling in WC | m² | €45.00 / m² | m² | enter quantity- |
| Lay floor tiles in WC area | m² | €45.00 / m² | m² | enter quantity- |
Plumbing works cost | ||||
| Cold and hot water outlet point | pcs | €35.00 / pcs | pcs | enter quantity- |
| Internal waste and drainage outlet point | pcs | €25.00 / pcs | pcs | enter quantity- |
| Installation of concealed WC frame | pcs | €120.00 / pcs | pcs | enter quantity- |
| Install valve for dryer/washer + waste | pcs | €55.00 / pcs | pcs | enter quantity- |
| Install and fit access panels | pcs | €45.00 / pcs | pcs | enter quantity- |
Completion works cost | ||||
| Install and connect WC extractor fan | pcs | €45.00 / pcs | pcs | enter quantity- |
Demolition and dismantling works cost | ||||
| Strip PVC or carpet floor coverings | m² | €4.00 / m² | m² | enter quantity- |
| Break out metal door frame from concrete | pcs | €45.00 / pcs | pcs | enter quantity- |
Painting cost | ||||
| Painting - basic white emulsion (2 coats) | m² | €2.10 / m² | m² | enter quantity- |
| Ceiling painting | m² | €2.90 / m² | m² | enter quantity- |
Flooring cost | ||||
| Install laminate flooring | m² | €12.50 / m² | m² | enter quantity- |
| Install skirting boards | lm | €4.00 / lm | lm | enter quantity- |
| Install transition strips | pcs | €8.00 / pcs | pcs | enter quantity- |
Doors and frames cost | ||||
| Install door lining & hang door | pcs | €75.00 / pcs | pcs | enter quantity- |
Package deals | ||||
| Electrical installation for studio flat - first fix + second fix | pcs | €1,200.00 / pcs | pcs | enter quantity- |
| Electrical installation for 1-bed flat - first fix + second fix | pcs | €1,400.00 / pcs | pcs | enter quantity- |
| Electrical installation for 2-bed flat - first fix + second fix | pcs | €1,550.00 / pcs | pcs | enter quantity- |
Electrical works cost | ||||
| Install and connect consumer unit | pcs | €150.00 / pcs | pcs | enter quantity- |
| 230V socket outlet point - first fix | pcs | €6.80 / pcs | pcs | enter quantity- |
| Switch point - first fix | pcs | €8.50 / pcs | pcs | enter quantity- |
| Lighting point - first fix | pcs | €8.40 / pcs | pcs | enter quantity- |
| 230V socket / switch - second fix | pcs | €11.00 / pcs | pcs | enter quantity- |
Units and worktops cost | ||||
| Install kitchen units (per lm) | lm | €44.00 / lm | lm | enter quantity- |
| Cut-out for sink/hob in worktop | pcs | €35.00 / pcs | pcs | enter quantity- |
Connections cost | ||||
| Fit sink mixer tap & trap | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install water & waste connections for sink | pcs | €45.00 / pcs | pcs | enter quantity- |
Tiling and cladding cost | ||||
| Tile kitchen splashback | m² | €45.00 / m² | m² | enter quantity- |
Appliances cost | ||||
| Install integrated appliances into kitchen units | pcs | €45.00 / pcs | pcs | enter quantity- |
| Professional connection of hob & oven | pcs | €50.00 / pcs | pcs | enter quantity- |
| Connect integrated dishwasher | pcs | €45.00 / pcs | pcs | enter quantity- |
How much it costs by scope
| Studio flat (36 m²) Turnkey bathroom and WC, rewiring, skimming and painting 116 m², laminate 31 m², 4 doors, kitchen fitting 2.4 m run | €14,300 - €17,900 of which labour €8568.13 |
| 1-bedroom flat (55 m²) Turnkey bathroom and WC, rewiring, skimming and painting 175 m², laminate 50 m², 5 doors, kitchen fitting 3 m run | €16,900 - €21,200 of which labour €10134.33 |
| 2-bedroom flat (70 m²) Turnkey bathroom and WC, rewiring, skimming and painting 224 m², laminate 64 m², 6 doors, kitchen fitting 3.6 m run | €19,000 - €23,900 of which labour €11404.03 |
| 3-bedroom flat (85 m²) Turnkey bathroom and WC, rewiring with an extra room, skimming and painting 274 m², laminate 79 m², 7 doors, kitchen fitting 4.2 m run | €21,200 - €26,700 of which labour €12718.53 |
How a flat renovation runs
The flat is emptied, then the old bathroom and WC, door frames and floor coverings come out. Rubble is taken down as the work goes, so it does not get in the way of the next trades.
The electrician chases channels and runs new cables, and the plumber sets out water and waste points in the bathroom, WC and kitchen. The pipework is pressure tested before it is covered up.
The bathroom and WC partitions are built, then plastering, waterproofing and wall and floor tiling follow. Meanwhile the chases in the rooms are filled and the walls and ceilings skimmed.
Once the skim has dried, painting starts, floors are levelled, laminate goes down, then the doors, sanitaryware, sockets and finally the kitchen go in.
Method of work
- 01Measuring the flat, budget, choosing materials and booking the trades.
- 02Telling the building management or freeholder, checking with Building Control if the layout changes, notice to neighbours.
- 03Clearing the flat, stripping out the bathroom, WC, door frames and floors, rubble removal.
- 04First fix electrics, water and waste pipework, pressure test.
- 05Bathroom and WC partitions and plastering, filling chases, skimming walls and ceilings.
- 06Waterproofing, wall and floor tiling in the bathroom, WC and kitchen.
- 07Painting, floor levelling and laying floors.
- 08Doors, sanitaryware, second fix electrics, kitchen fitting, electrical testing and clean-up.
5 common mistakes
Once the old bathroom, floors or wiring are opened up, extra work almost always turns up. Without a contingency, people end up cutting back on materials that cannot be swapped later.
Laminate laid before painting, or doors hung before skimming, means damaged finished work and repairs at your own cost.
Sockets, the hob supply and the water feed are set out to the kitchen design. When the design comes late, finished walls get chased again.
In a block of flats, even a thin wall can be load-bearing or provide bracing. Removing it without a structural engineer and the right approvals puts the whole building at risk.
Concrete floors in blocks have steps and dips. Without levelling, the joints crack and the floor creaks.
What a flat renovation includes and what the cost covers
"Renovation" means something different to everyone. For one person it is fresh paint and a new floor. For another it is a flat stripped back to bare concrete. Agree the scope before you compare quotes. Otherwise the quotes have nothing in common except the word "renovation" at the top.
- Cosmetic refresh: painting, filling small cracks, new flooring laid over the existing base, perhaps new door handles and sockets. The wiring, bathroom and doors stay. It takes days to a few weeks, and you can usually keep living in the flat with some disruption.
- Partial renovation: one or two areas are tackled, typically the bathroom or the kitchen, plus floors and walls. The wiring is often replaced only in the rooms being renovated. This is where compromises creep in that are hard to put right later.
- Full turnkey renovation: the flat is cleared, the bathroom, WC, door frames and floors are stripped out, all the wiring and the water pipework inside the flat are replaced, walls and ceilings are skimmed and painted, new floors go down, doors are hung and the kitchen is fitted. At the end you get the keys back and can move in.
- Shell new-build flat: a new flat without floor coverings, tiles, sanitaryware and often without internal doors. Nothing is demolished and the services are new, but all the fitting out and materials are the same as in a renovation. You save mainly on demolition, a new bathroom and rewiring.
The costs on this page assume a full turnkey renovation of a flat in an apartment block. They include a new bathroom and separate WC, a complete rewire with a new consumer unit, skimming and painting of walls and ceilings, levelling and laminate flooring, internal doors with new linings, and kitchen fitting including connecting the appliances. Materials are priced at a standard mid-range level.
Some items vary so much between households that they are left out: kitchen units and appliances, furniture, light fittings, windows, radiators, the electrical installation certificate and waste removal. A kitchen can cost as much as half the whole renovation or only a small part of it. Certification and the skip are paid separately and depend on the scope of work and where you live. Build them into your budget from day one so they do not catch you out at the end.
Flat renovation cost by number of bedrooms
The table shows the floor and wall areas and the number of doors each scenario assumes. Use it to compare with your own flat. If your 1-bedroom flat has a lot more wall area, for example because of a long hallway, adjust your estimate upwards.
| Flat | Floors / walls and ceilings (m²) | Doors | Cost incl. materials | Per m² of flat |
|---|---|---|---|---|
| Studio (36 m²) | 31 / 116 | 4 | €14,300 - €17,900 | €400 - €500 |
| 1-bedroom (55 m²) | 50 / 175 | 5 | €16,900 - €21,200 | €310 - €380 |
| 2-bedroom (70 m²) | 64 / 224 | 6 | €19,000 - €23,900 | €270 - €340 |
| 3-bedroom (85 m²) | 79 / 274 | 7 | €21,200 - €26,700 | €250 - €310 |
Cost does not rise evenly with floor area. The bathroom, WC, consumer unit and kitchen are much the same in a small flat and a large one. The owner of a 36 m² studio pays roughly the same for the bathroom as the owner of an 85 m² flat, just spread over fewer square metres. That is why a small flat costs more per m² and a larger one costs less. Stripping out the old bathroom and WC alone comes to €490.00 for the whole job, whatever the size of the flat, and fitting a consumer unit comes to €150.00 each. What grows with floor area is mainly skimming, painting, flooring, the number of doors and the length of cable runs.
Studio flat renovation
In a studio, the big question is whether the kitchen is part of the main room or separate. A kitchen in the main room saves on walls and doors, but it puts more demand on extraction and socket layout, because you sleep, cook and work in one space. Labour alone comes to roughly €8568.13. The bathroom takes a large share of the budget here, so think carefully about keeping the bath or switching to a shower to make room for a washing machine.
1-bedroom flat renovation
The 1-bedroom flat is the most common scenario. Typically there is a living room with a kitchen area or a separate kitchen, a bedroom, a hallway and the bathroom. Labour comes to roughly €10134.33. In practice the most common question here is opening the kitchen into the living room. It can transform the flat, but it also raises questions about permissions and structure.
2-bedroom flat renovation
A 2-bedroom flat usually adds a corridor linking the rooms, which eats up a lot of skimming, flooring and wiring for lights and switches. Labour comes to roughly €11404.03. More doors also means more threshold strips and more places where different floor heights meet, so levelling matters more.
3-bedroom and larger flat renovation
3-bedroom flats often have two WCs or a larger bathroom, sometimes a utility room or walk-in wardrobe too. Every extra wet area adds more to the cost than a whole extra bedroom. Labour comes to roughly €12718.53. For a 4-bedroom flat, take the 3-bedroom scenario and add one room: skimming and painting its walls and ceiling, the floor, a door and a few sockets and lights.
What changes the cost of a flat renovation most
Condition of the flat and type of building
A flat in a concrete-framed block is the most predictable for budgeting. The walls are concrete, layouts repeat and tradespeople know the typical problems. A flat in an older brick building, such as a period conversion, is a different story. Old plaster can come away in large patches when walls are chased, ceilings may be lath and plaster on timber joists and far from level, wiring can be a mix of several generations and waste pipes may be cast iron. In a flat like that, the budget can easily grow to include replastering and new plasterboard ceilings. A new-build or shell flat is cheaper to prepare, because nothing is demolished and no new chases are cut.
Quality of materials
The costs on this page assume standard materials. Large-format tiles, solid wood floors, concealed door frames or designer taps can multiply the cost of materials and often add labour too. Large tiles, for example, need a flatter base and more time to lay.
Layout changes, walk-in showers and underfloor heating
Every layout change means demolition, new partition walls, rerouted services and often a structural engineer. A level-access wet room shower with a linear drain looks simple, but it needs a proper fall, flawless waterproofing and sometimes a raised floor so the waste can drain at all. Electric underfloor heating in the bathroom adds comfort and is not expensive. Underfloor heating throughout the flat is a separate project.
Location, tradespeople's workload and timing
In big cities, and especially in London, tradespeople cost more and are busier. Waiting times are usually longer in spring and summer. If you need to start within a week and finish by a fixed date, you will pay more. If your dates are flexible and the flat is ready, you may get a better quote.
Order of works and a week-by-week renovation timeline
For a 1-bedroom or 2-bedroom flat, a typical timeline looks like this. It assumes that anything with a long lead time is ordered in advance and that the trades follow each other without long gaps.
- Week 1: clearing the flat, protecting communal areas, stripping out the bathroom, WC, door frames and floors, removing rubble as you go.
- Weeks 2 and 3: chasing and first fix electrics, water and waste points in the bathroom and kitchen, pressure testing the pipework.
- Weeks 3 to 5: building the bathroom partition walls and plastering, filling chases and skimming walls and ceilings in the other rooms.
- Weeks 5 to 7: waterproofing, wall and floor tiling in the bathroom and WC, the kitchen splashback, while the skim coat dries.
- Weeks 7 and 8: painting, levelling the floors and letting the screed dry.
- Weeks 8 to 10: laying floors, hanging doors, fitting sanitaryware, second fix of sockets and switches.
- Weeks 10 to 12: fitting the kitchen, testing and certifying the electrics, snagging and cleaning.
The logic is simple. First everything that makes a mess and goes into the wall, then whatever covers the wall, and finally whatever is easily damaged. Services must be finished before skimming, otherwise finished walls get chased. Painting comes before the floor goes down, so no paint drips on the laminate. Doors are hung on the finished floor, because their height depends on it. The kitchen goes in last, when nobody is sanding or drilling any more.
The most common reason a timeline slips is drying time. Skim coats, plaster and levelling compound usually need from a few days to two weeks, depending on thickness, temperature and ventilation. The second common reason is doors and kitchens ordered too late. Delivery typically takes four to eight weeks.
Electrics, water and waste
Electrics in the flat
Older flats can still have dated wiring, an old fuse box and no RCD protection. Old cables and connections deteriorate, joints can loosen and overheat, and the system was never designed for today's appliances. In a full renovation the whole flat is rewired, not just the kitchen. That includes a new consumer unit with circuit breakers and RCD protection, which cuts the power if current leaks, for example in the bathroom.
When planning electrical work, err on the side of more sockets. In practice it often happens that people regret a missing socket by the bed, in the hallway for the vacuum cleaner or by the TV. Walk through each room and imagine where the furniture will go. The hob, oven, washing machine and dishwasher should have their own circuits.
A rewire must be tested and certified. The electrician issues an Electrical Installation Certificate confirming the installation is safe. Rules on notifying building control differ across England, Wales, Scotland and Northern Ireland, so check what applies where you live. Without the paperwork you may have problems with an insurance claim or when you sell. More on what it contains and when you need it is on the page about the electrical installation certificate for a flat. Electrical work should be done by a qualified, registered electrician, not a handy neighbour.
Water, waste and communal risers
In a renovation the water pipes in the flat are replaced from the stopcock to each outlet. Old galvanised steel pipes rust inside, and limescale narrows them. New plastic pipework is pressure tested before it is covered. The water, waste and gas risers are a different matter. They are usually part of the shared building. Even though they run through your flat, they are not yours, and any work on them must be agreed with the managing agent or freeholder. If the building is planning to replace the risers, it is worth timing your bathroom so it does not have to be ripped out twice. Details on pipework and connections are in the section on plumbing work.
Walls, ceilings and floors in an apartment block
Concrete walls and ceilings are solid but not perfectly flat. Once chases are cut and services replaced, the chases are filled and whole surfaces are skimmed. Skimming walls comes to €6.50 per m², and it is the job that decides how the final paintwork looks. Side light from a window shows every ripple. Once dry, the walls are primed and the painting and decorating follows, usually in two coats.
Floors in apartment blocks vary in height between rooms and even within one room. Once old vinyl or carpet comes up, the concrete is often full of adhesive residue and dips. Floor levelling comes to €6.90 per m² and brings the whole flat to one height, so you can do without thresholds.
Think of the neighbours below when choosing underlay. Acoustic underlay reduces footfall noise, which travels surprisingly well through a concrete slab. Many leases require it, and some ban hard floors without it, so check yours. Laminate needs a good-quality underlay, and with vinyl it depends on the system.
If you are choosing between floor coverings, roughly speaking:
- laminate is affordable and scratch resistant, but dislikes water and is noisier,
- vinyl is quieter and copes with moisture, so it suits hallways and kitchens, but it needs a very flat base,
- wood feels the nicest and can be sanded back, but costs more and is more sensitive to moisture and upkeep.
Laying laminate comes to €12.50 per m². More options and methods are under flooring work.
Doors and door frames
In many concrete blocks the original door frames are steel and set into the wall. To replace them with modern timber linings, they have to be cut out. Removing a steel door frame from concrete costs €45.00 each and is done in the first week with the rest of the demolition. The opening is then trued up and made good along with the walls.
A lining-style frame wraps the wall on both sides, so it is ordered to the exact wall thickness. Walls in one flat can differ. A bathroom partition is not the same as a concrete wall between rooms. Measure every opening separately. The other key figure is the finished floor height. That is why frames are measured and ordered only after levelling, when it is clear where the laminate will sit. Measure before levelling, and doors may drag on the floor or leave a large gap underneath.
Fitting a door lining and hanging the door comes to €75.00 each. The method and typical mistakes are covered under fitting door linings and hanging doors. Think about width too. Bathrooms and WCs usually get narrower doors, rooms wider ones, and an open-plan kitchen and living room sometimes suits a sliding door.
The kitchen as part of the renovation
The kitchen is fitted last but designed first. Before the electrician starts chasing, you need to know where the hob, oven, fridge, dishwasher and sink will go. That decides the sockets above the worktop, the dedicated appliance circuits and the water and waste points. If the design arrives after skimming, finished walls get chased and you pay twice.
A cooker hood in a flat usually either ducts outside, connects to a shared ventilation duct if the building has one, or recirculates. A shared duct must be connected according to the building's rules, because a poor connection can push cooking smells into neighbouring flats. Ask the managing agent before you decide.
The cost on this page includes kitchen fitting with worktop cut-outs, splashback tiling, the sink tap and connecting the appliances. Fitting the units comes to €44.00 per linear metre. The units and appliances themselves are not included. Allow for lead times and order them to arrive once the floors and painting are finished.
Layout changes and permission to renovate a flat
Opening up the kitchen and other layout changes
The most common layout change is knocking the kitchen through to the living room. In an apartment block that is not just a question of taste. Some walls are load-bearing, others brace the whole building. Even a thin wall can do an important job. Before any demolition, have the wall assessed by a structural engineer. They will tell you whether it can come out, whether an opening with a lintel or steel beam will do, or whether it should be left alone. The demolition work itself is the easy part after that.
What building regulations say
Internal works to a flat do not usually need planning permission, but they may need to comply with building regulations. Ordinary maintenance and interior work, such as painting, new floors, tiling, replacing doors, sanitaryware and the kitchen, and like-for-like replacement of services, does not usually need building control approval.
It is different when you remove or move walls, alter load-bearing structures, reroute drainage or add new electrical circuits in certain locations, or touch shared parts of the building such as the risers. These usually need building control involvement, often with a structural engineer's calculations, and in a leasehold flat almost always written consent from the freeholder. The exact route depends on the work and on whether you are in England, Wales, Scotland or Northern Ireland, so always check with your local authority building control before you start. No contractor can promise in advance that no approval is needed without knowing the details.
Managing agent, freeholder and your lease
If you own a leasehold flat, the lease sets the rules. It usually says that alterations need the freeholder's written consent, often called a licence for alterations, and that works must not damage the building or cause unreasonable disturbance to other residents. It may also allow the freeholder or managing agent to inspect the work. If works affect a wall shared with a neighbour, check whether party wall rules apply. In practice, this means reading your lease, contacting the managing agent before you start and allowing an inspection if they ask for one.
Renovation notice for your neighbours
There is usually no general legal duty to notify neighbours, but managing agents and building rules almost always expect it, and it is simply good manners. The neighbours will hear drilling for weeks and share the lift with tradespeople. People cope better when they know what is coming.
Put the notice up on the board by the entrance, or post it through letterboxes, at least 7 days before work starts. Noisy work is usually done on weekdays during the hours set by the building rules or the lease. Many councils also publish guidance on acceptable hours for building noise, so check with your local council. Stick to these hours strictly when demolishing and chasing walls, because that is when most complaints happen.
Notice of renovation works
Dear neighbours, I would like to let you know that renovation works will take place at Flat [flat number] on the [floor] floor from [start date] to [end date].
Noisy work will take place on weekdays between [time] and [time], and the noisiest week is expected to be [demolition dates]. Rubble will be removed regularly, and the communal areas and lift will be protected and kept clean. Any short interruptions to the water or electricity supply will be announced separately in advance.
I apologise for any inconvenience. If you have any questions or problems, please contact me: [name], tel. [phone number]. Thank you for your patience.
Download the notice as a PDF. You can fill it in on your computer, or print it out and complete it with a pen.
Living arrangements, moving out and rubble during the renovation
During a full renovation, living in the flat is practically impossible. The flat is without a bathroom and WC for weeks, fine dust gets everywhere and the power is switched off repeatedly. Plan for somewhere else to stay for the whole period, with a little extra time to spare. If you are moving in with family, talk to them about what happens if the dates slip.
Move out everything you are keeping. Furniture under dust sheets in a corner gets in the tradespeople's way, the dust gets in anyway and the risk of damage is high. Short-term storage, a storage cupboard or relatives are better options. Keep the flat's documents, the keys to storage and the keys to any service cupboards and stopcocks somewhere safe and separate.
Stripping out the bathroom, floors and door frames creates more rubble than you might expect. It is bagged and carried out as the work goes on so it does not pile up, then taken away in a skip or a van. Placing a skip on the road usually needs a permit from the council, so check in advance. Protect communal areas with sheeting or hardboard, especially the corridor floor and the lift walls. Do not overload the lift or carry loose material in it without bags. Damage to the lift car or corridor flooring is usually charged to whoever is renovating.
How to choose a contractor and prepare a budget
A good quote is itemised: demolition, electrics, plumbing, bathroom, skimming, painting, floors, doors, kitchen. Each item shows the quantity, the unit and the labour cost, with materials listed separately. A quote with a single figure "for the whole flat" cannot be compared with another one, and you cannot check what is missing from it. How to prepare the information is explained below in the DIY guide.
Add a contingency of 10 to 15% for unexpected work. Once the bathroom is stripped out, you may find a rotten subfloor, a crooked wall or a stopcock that does not work. Without a contingency, people end up cutting back on materials they will not replace later.
Sign a written contract with the contractor. It should cover the scope of work, the itemised quote as an appendix, start and finish dates, the schedule, staged payments, guarantees and how extra work will be handled. Link payments to completed stages, for example after demolition and first fix, after the bathroom, after the floors and at handover. Do not agree to a large upfront deposit without a clear reason.
An important question is who coordinates the trades. If you hire the electrician, plumber, tiler and flooring fitter separately, coordination is down to you, and every day one trade is delayed carries over to the next. A turnkey contractor handles that for you, and charges for it. For the bathroom, it is worth reading in more detail how a bathroom and WC renovation works, because it is the part with the highest risk of mistakes.
Photograph everything before the services are covered up. Every wall with chases, the water points, the waste runs, the back boxes. When you drill for a shelf later, you will know exactly where the cables run, and if something goes wrong you have evidence.
Where it pays to save and where it does not
The rule is simple: do not cut corners on what goes in the walls and under the floor. Save on things that are easy to replace later.
Do not cut corners on:
Sensible places to save:
Doing part of the work yourself only pays off for simple tasks. Anyone can clear the flat, pull up carpets or photograph the existing condition. Leave electrics, gas and waterproofing to professionals.
DIY guide: how to measure your flat and prepare the information for a quote
The more precise the information you give contractors, the more accurate and comparable the quotes you get back. Anyone can do this in an afternoon with a tape measure, paper and a phone.
Download squared paper for your floor plan. Print it on A4 without scaling - one square corresponds to 20 cm.
- Draw a floor plan of the flat. A hand sketch showing all the rooms, windows, doors, the bathroom and the kitchen is enough. If you have the original plan from the managing agent or the sale documents, use it as a base.
- Measure every room. Length, width and ceiling height. From these, work out the floor area, the wall area excluding windows and doors, and the ceiling area.
- Count the doors and measure the walls around them. For each door, note the width of the opening and the thickness of the wall, because door linings are ordered to that thickness.
- Mark sockets, switches and lights. Both where they are now and where you want new ones. Mark appliance positions separately.
- Measure the bathroom and kitchen. The size of the bathroom and WC, the tiling height, the length of the kitchen run and where the riser is.
- Photograph the flat as it is. Each room from two corners, plus close-ups of the floors, the consumer unit, risers, stopcocks and any damage.
- Write a wish list. Bath or shower, type of flooring, layout changes, dates and what you will sort out yourself. Send everything to every contractor in the same format.
How to sign off the flat after the renovation
Plan the handover in daylight, with plenty of time. Bring the contract, the quote and your photos. Write everything you find on a snagging list with a date for each item to be put right.
Frequently asked questions
Related work
How to renovate the bathroom and toilet core of a panel block flat: stripping laminate walls, new partitions, pipework, wiring, tiling and sanitaryware.
What a bathroom renovation costs: labour prices by scope, from new surfaces to a turnkey bathroom.
What a toilet renovation costs: labour prices from new surfaces to a complete turnkey WC.
What does kitchen fitting cost in 2026? Labour price list for units, worktops, sink and appliance connections, plus a quick estimate in the NUMIQ calculator.
Price list for electrical installation work in 2026: cabling, sockets, switches, lighting and fuse boards. What affects the cost and a quick estimate in NUMIQ.
How much do painting and decorating works cost per m² in 2026? Live labour rates for walls, ceilings, preparation and a 60 m² flat example.
What does fitting laminate, vinyl, wood or carpet cost per m² in 2026? Labour price list, subfloor preparation and a quick estimate in the NUMIQ calculator.
Price list for carpentry and joinery in 2026: fitting doors, windows, built-in wardrobes and boarding. What affects the price and a quick estimate in NUMIQ.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.