On the current price list, laying underfloor heating pipework costs €4.50 per m² of labour. The system panel, manifold, radiators, boiler connection and pressure test are priced separately, depending on what you need. If you're renovating and the old system has to be drained and flushed, expect the price to go up for that extra work.
Types of work and their prices
The base for laying the pipework, with fixed studs. It is fitted on a level, clean substrate before the pipes themselves are laid.
Pipes are laid into the system panel following the layout drawing, with tighter spacing at the perimeter zones because of heat loss.
Covers removing the old unit and fitting the new one, including valves, and connecting it to the existing pipework.
Fitting a ladder-style unit including anchoring to the wall; it is often combined with an electric element for summer use.
Pipe run from the riser or manifold to individual radiators, routed in the floor, in a chase or on the surface.
Checking the whole system is leak-tight before the pipework is covered up or put into service.
Heating installation price list 2026
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Heating works cost | ||||
| Underfloor heating pipe installation | m | €4.50 / m | m | enter quantity- |
| Remove & re-install radiator (complete) | pcs | €180.00 / pcs | pcs | enter quantity- |
| Remove gas / electric boiler | pcs | €110.00 / pcs | pcs | enter quantity- |
| Remove hot water cylinder | pcs | €109.00 / pcs | pcs | enter quantity- |
| Install & connect panel radiator | pcs | pcs | - | |
| Install bathroom towel radiator | pcs | €120.00 / pcs | pcs | enter quantity- |
| Lay underfloor heating insulation board | m² | €3.50 / m² | m² | enter quantity- |
| Install underfloor heating manifold | pcs | pcs | - | |
| Install gas condensing boiler | pcs | pcs | - | |
| Installation of air-to-water heat pump | pc | €950.00 / pc | pc | enter quantity- |
| Earth / bond heating system | pcs | pcs | - | |
| Replace thermostatic radiator valve (TRV) | pcs | €19.00 / pcs | pcs | enter quantity- |
| Replace return valve | pcs | €19.00 / pcs | pcs | enter quantity- |
| Install circulation pump | pcs | pcs | - | |
| Pre-wire for smart thermostat connection | pcs | pcs | - | |
| Install & connect low-loss header | pcs | pcs | - | |
| Install expansion vessel | pcs | €54.00 / pcs | pcs | enter quantity- |
| Install recirculation pipework | pcs | pcs | - | |
| Install domestic hot water (DHW) / recirculation pump | pcs | pcs | - | |
| Thread pipework | pcs | €55.00 / pcs | pcs | enter quantity- |
| Flame weld metal pipework | pcs | €20.00 / pcs | pcs | enter quantity- |
| Pressure test heating system | hr | €130.00 / hr | hr | enter quantity- |
| Drain heating system | pcs | pcs | - | |
| Fill, bleed & balance heating system | hr | €70.00 / hr | hr | enter quantity- |
| Pipework for radiators | lm | €9.00 / lm | lm | enter quantity- |
| Flush & clean existing heating system | hr | €50.00 / hr | hr | enter quantity- |
| Pipe freezing | pcs | €50.00 / pcs | pcs | enter quantity- |
| Cap off radiator | pcs | €65.00 / pcs | pcs | enter quantity- |
| Fill heating system | pcs | pcs | - | |
| Chase heating pipes in floor | lm | €24.00 / lm | lm | enter quantity- |
| Concrete-in heating pipes in floor | lm | €6.50 / lm | lm | enter quantity- |
| Install radiator bracket | pcs | €17.00 / pcs | pcs | enter quantity- |
| Install thermostatic radiator valve (TRV) & head | pcs | €19.00 / pcs | pcs | enter quantity- |
| Pressurise & bleed radiator | pcs | €12.00 / pcs | pcs | enter quantity- |
Air conditioning cost | ||||
| Split air conditioning installation (indoor/outdoor unit) up to 3m pipe run | pc | €299.30 / pc | pc | enter quantity- |
| Multi-split air conditioning installation (2 indoor + 1 outdoor unit, up to 3 m pipe run) | set | set | - | |
| Multi-split AC installation (3 indoor + 1 outdoor unit) incl. pipework up to 3 m | set | set | - | |
| Chasing walls for air conditioning pipework | m | €24.95 / m | m | enter quantity- |
| Making good chases after air conditioning pipework installation | m | €10.50 / m | m | enter quantity- |
| Electrical cable supply line | m | €13.50 / m | m | enter quantity- |
| Hole through non-load-bearing wall up to 100 mm thick | ea | €25.00 / ea | ea | enter quantity- |
| Core drill penetration load-bearing wall up to 25 cm | pc | €40.00 / pc | pc | enter quantity- |
| Refrigerant pipe run extension over 3 m, 2.5 to 3.5 kW unit | m | €32.50 / m | m | enter quantity- |
| Refrigerant pipe run extension over 3 m, 5 kW unit | m | €36.60 / m | m | enter quantity- |
| Refrigerant pipe run extension over 3 m, 7 kW unit | m | €40.70 / m | m | enter quantity- |
| Lightweight mobile aluminium scaffold tower for exterior work up to 2 storeys | storey | €100.00 / storey | storey | enter quantity- |
Other works | ||||
| Other unlisted works | hr | hr | - | |
How much it costs by scope
| Laying Pipework Only 25 m² of underfloor heating pipework without a system panel. | €112.50 |
| Panel and Pipe Laying System panel and pipework over an area of 25 m². | €200.00 |
| Panel, Pipework and Pressure Test System panel and pipework over 25 m² plus a pressure test of the system (2 hours). | €460.00 |
Preparing and Installing the Heating System
The base under the underfloor heating needs to be level, clean and free of dust. Any bumps or dips stop the system panel sitting flat.
The installer covers the whole floor with panel, leaving no gaps, and only breaks it where the design shows expansion joints.
The installer lays the pipes in loops of equal length, following the layout drawing, so water flows evenly through every circuit.
Before the screed goes down, the installer puts the system under pressure and watches it for a while. That way any leak shows up while the pipes are still easy to get at.
With the pipework finished, the installer fills the system, bleeds out the air and balances the flow between the circuits or radiators.
Method of work
- 01A site visit, then a design proposal based on how much heat each room loses and what heat source you have.
- 02Preparing the floor base and laying the system panel or fixing strips.
- 03Laying the underfloor heating pipes or the radiator supply pipes to the design.
- 04Fitting the radiators, valves and fittings on each circuit.
- 05Pressure testing the system before it's covered over or switched on.
- 06Filling, bleeding and balancing each circuit.
- 07Setting up the heat source and handing over a system that works.
5 common mistakes
If pipes already buried in screed start leaking, the only fix is breaking up the floor. That's why the test always comes before the concrete.
When loop lengths differ a lot, the flow and room temperatures get out of balance, so some areas heat up and others don't.
Air left in the pipes makes them gurgle and knock, and both radiators and underfloor heating give out less heat.
A new radiator on an old, clogged pipe run won't cure the original flow problem. Sometimes flushing the system is the only thing that helps.
If the layer over the pipes is too thin, the screed cracks and the heat spreads unevenly.
Good heating starts with a heat loss calculation, not a guess
When people are unhappy with their heating, the boiler or the radiators are usually not to blame. What is missing is a calculation. The output of a radiator or an underfloor heating circuit should come from how much heat that particular room loses. That depends on the floor area and ceiling height, how good the windows are, how thick and well insulated the external walls are, and whether the room sits next to a heated space.
A corner room, a north-facing room or a room above an unheated cellar or garage needs more output than an internal room of the same size. If you choose radiators by square metres alone, it often happens in practice that one room stays chilly while the others overheat. The boiler runs longer than it needs to, and your bills go up.
The opposite mistake causes trouble too: a heat source that is too powerful. An oversized boiler keeps switching on and off, never settles into the mode where it runs economically and wears out sooner. If you are putting in new heating or replacing the boiler, it pays to have a heating engineer or designer produce a proper heat loss calculation. And if you are about to insulate the house, the calculation should be based on the house after insulation, not before.
Radiators or underfloor heating?
A radiator warms up quickly and reacts quickly when you change the setting. It suits older houses and flats where you cannot raise the floor, and spaces you heat only now and then, such as a holiday home. Fitting is simpler, and a repair does not mean breaking anything open. The downside is that heat spreads less evenly around the room, and the radiator limits where you can put furniture.
Underfloor heating warms the room through the whole floor surface. The heat is spread evenly, there are no warm and cold corners, and you feel just as comfortable at a slightly lower air temperature. It reacts slowly, though, because the whole layer of screed has to warm up first. So it suits steady, continuous heating rather than warming a room quickly for a couple of hours.
Why the water temperature matters
Underfloor heating gets by with cooler water than ordinary radiators, and that makes a real difference to modern heat sources. A condensing boiler runs economically when the water coming back to it has cooled enough for the flue gases to condense inside. A heat pump saves more the cooler the water it has to produce. If you fit a heat pump in an older house and keep the original small radiators, the pump has to make hot water and much of the saving disappears. Larger low-temperature radiators or underfloor heating solve this.
How underfloor heating is built
With wet (water-based) underfloor heating, insulation boards go onto the structural floor, an edge strip runs around the walls, then comes a system panel or a film with pipe clips, and the pipes are fixed on top. Everything is covered with screed, which spreads the heat and passes it into the room.
- Screed depth above the pipes: there has to be a minimum layer of screed over the pipes, set by the system manufacturer and the type of screed. For sand and cement screed, roughly 4.5 cm is usually quoted in practice, while anhydrite (calcium sulphate) screed can be thinner. Screed that is too thin cracks, and screed that is too thick reacts even more slowly.
- Movement joints: screed expands as it warms up. The edge strip separates it from the walls, and large or awkwardly shaped areas are divided by movement joints. Where a pipe crosses a joint, it runs through a protective sleeve.
- Circuits: each room gets its own circuit. Long areas are split into several circuits of similar length. Along external walls and under windows, the pipes are laid closer together.
- Manifold: a manifold with flow meters lets you set the flow in each circuit. If you want room-by-room temperature control, electric actuators are fitted to it and wired to room thermostats.
The floor must not get too hot. For living rooms, the European standard for underfloor heating (EN 1264) works with a surface temperature of roughly 29 °C at most, while bathrooms and the edge zones along external walls can be a little warmer. A hot floor is unpleasant underfoot and dries the air. This leads to an important point: in an old, uninsulated house, underfloor heating has limited output and may not be enough on its own.
Heating up the screed and choosing the floor covering
Never dry screed by turning the heating straight up to full. The screed has to cure first. For cement screed this usually takes around three weeks, for anhydrite less. Then comes a gradual heat-up following the manufacturer's protocol: the water temperature is raised in steps, held for a while and then brought down again step by step. Before anyone lays the floor covering, the moisture left in the screed is measured.
Ceramic tiles and stone let heat through well. You can also use vinyl or wood, but the manufacturer must approve them for underfloor heating, and they need to be fully bonded or laid in a way that holds back as little heat as possible. A thick carpet, or a floating floor on a thick underlay, can noticeably reduce what the heating delivers.
Radiators: choosing, positioning and controlling them
Panel radiators are the usual choice. How much heat they give off depends on their height, length and the number of panels and fins. Watch out for one thing: the output in the catalogue applies to a particular water temperature. If the water is cooler, for example with a heat pump, the same radiator gives off much less heat, and you need a bigger one.
Why does a radiator nearly always hang under the window? The warm air rising from it stops the cold draught coming off the glass, and the window mists up less. With modern double or triple glazing this matters less, but the space under the window still makes the most sense. Leave a gap between the radiator and the windowsill, and between the radiator and the floor, so air can flow. Do not cover the radiator with long curtains or push furniture in front of it.
A thermostatic radiator valve (TRV) keeps the room at the temperature you set. When the sun shines in or you are cooking, it turns the output down by itself. The head needs room air flowing around it, though. Tucked under a windowsill behind a heavy curtain, it reads the wrong temperature. When you replace radiators, it is worth replacing the valves too and having the whole system balanced, which means setting it up so the water is shared between all radiators according to what each room needs.
Radiators in a block of flats
In a block of flats with communal heating, the radiators are part of the whole building's system, and many carry heat cost allocators, the small meters that split the heating bill between flats. Before you replace or move a radiator, agree it with the building management or the owners' association. They arrange for the riser to be drained and, after fitting, refilled and bled. The heat cost allocator has to be moved to the new radiator by an authorised company. The new radiator should have a similar output to the old one, otherwise the balance of heating across the building is upset.
Heat source: gas boiler, electric boiler or heat pump
A gas condensing boiler is still a common choice in homes with a gas supply. It is not expensive to buy, it is compact and it is reliable. It needs a flue, which often has to be altered when an old boiler is swapped for a condensing one, and a condensate pipe to the drain.
An electric boiler is easy to install. It needs no chimney and no gas supply, and there are no gas safety checks. However, it turns each kilowatt-hour of electricity into roughly one kilowatt-hour of heat, so at typical electricity prices it is more expensive to run. Before installation, check that your main fuse and the supply capacity of your property can handle the load; your electricity supplier or an electrician can tell you.
A heat pump takes heat from the air, the ground or water and, depending on conditions, produces several kilowatt-hours of heat from one kilowatt-hour of electricity. It does well in an insulated house with low-temperature heating. The upfront cost is considerably higher than for a boiler. With an air-to-water heat pump, think about where the outdoor unit will stand, how the neighbours will perceive its noise and where the condensate will drain in winter without freezing. In some places the outdoor unit needs planning permission or has to meet noise limits, so ask your local authority. Many countries offer grants or subsidies for heat pumps, but the conditions change, so check the current rules before you place an order.
Installing a boiler: permits, inspections and the flue
Only a qualified, registered gas engineer may connect a gas boiler to the gas supply. Before the boiler goes into use, the gas installation is tested and the flue is checked, and an existing chimney is inspected as well. The first start-up and setting of the boiler are done by the manufacturer's engineer or an authorised service partner. If someone else does it, you may lose the warranty. If you ever smell gas, do not switch anything on or off, open the windows, leave the property and call the gas emergency number for your area, or 112.
The boiler should be placed so an engineer can reach it easily for servicing. If it does not draw its combustion air from outside, the room has to meet the requirements for air supply. Before you change the heat source or alter a chimney, check with your local building authority and the gas network operator which approvals and documents you will need. Rules differ from country to country and sometimes between regions, so do not assume a simple notification is enough. The building authority will tell you exactly what applies.
A new boiler also needs correctly connected hydraulics: a circulation pump, an expansion vessel, a pressure relief valve and, where there are several circuits, a low-loss header. If you combine radiators with underfloor heating, you need a mixing valve so that water that is too hot does not reach the floor.
Renovating an old heating system
Over the decades, sludge and rust settle in older pipework. They clog radiators, valves and the boiler's heat exchanger. A new boiler connected to a dirty system can end up with a damaged heat exchanger after only a few years. That is why the whole system is flushed before the new heat source is connected, and a magnetic filter is fitted on the return, the pipe that carries water back to the boiler. It catches metal particles before they get into the boiler.
Manufacturers of both boilers and heat pumps set requirements for the quality of the heating water. After flushing, the system is filled with treated water, and a corrosion inhibitor is added where needed. With old steel pipework, the installer will also assess whether it makes sense to keep it or to replace it with plastic or multilayer pipe.
DIY guide: bleeding a radiator and topping up the pressure
Is your radiator warm at the bottom and cold at the top, or does it gurgle? There is air in it. In a house, you can bleed radiators and check the pressure yourself. In a block of flats, if the problem is linked to the riser, contact the building management.
- Switch off the boiler or circulation pump and wait a few minutes so the air rises to the top of the radiators.
- Put a cloth and a small container under the radiator's bleed valve.
- Turn the valve slowly anticlockwise with a radiator key until air starts to hiss out.
- Close the valve as soon as water comes out without bubbles.
- Work from the radiator nearest the boiler to the one furthest away, and leave radiators on upper floors until last.
- Check the pressure on the boiler gauge. If it has dropped below the value in the manual, usually around 1 to 1.5 bar in a house, top up slowly through the filling loop while the system is cold.
- Switch the boiler back on and, once it has warmed up, check that the radiators heat across their whole surface.
- Call a heating engineer if you need to top up the pressure often, because there is a leak somewhere or the expansion vessel is faulty.
Taking over your heating system
When a contractor hands over new or renovated heating, check that everything works and that you have all the paperwork:
- You have a pressure test record and, for underfloor heating, the screed heat-up protocol
- For a gas boiler, you have the gas installation test report and proof that the flue was checked
- The boiler was commissioned by an authorised service partner and the warranty card is filled in
- All radiators heat across their whole surface and nothing gurgles in the system
- The circuits on the underfloor heating manifold are labelled by room and the flow rates are set
- Thermostatic heads and controls respond when you change the setting
- You have a pipe layout plan or photos of the pipes before screeding, so nobody drills into the floor blindly later on
During the first heating season, keep an eye on the system pressure and the room temperatures. After the first frosts it is normal to fine-tune the flow rates and controls a little. A reliable contractor expects this and allows for it.
Frequently asked questions
Related work
How much does air conditioning installation cost in 2026? Find out what's in the standard price, what's extra for pipe runs, chasing, and electrics, and what to watch out for.
When and how to drain a central heating system, what to watch for with radiators and underfloor heating, and how to refill and bleed it.
How a radiator is taken off the wall and refitted, what makes the job harder, what to consider in a flat and how to check the finished work.
How a radiator is boxed in with plasterboard, timber, MDF or metal, what to watch with airflow and valves, and how to check the finished cover.
How underfloor heating pipes are covered with screed, which screed to choose, why the pressure test matters and how to heat the floor up for the first time.
How a floor chase for heating pipes is cut, what makes the job harder, what to watch for in a block of flats and how to check the finished work.
How radiator valves are fitted and replaced, which valve types to choose, common mistakes to avoid and how to check the finished work.
How a heating system is filled, what pressure to set, how to bleed radiators and what to check once the work is finished.
When to bleed a radiator and top up heating pressure, how the job is done, common mistakes and how to check the system heats evenly again.
How pipe freezing works, when it beats draining down the heating, what makes the job harder and how to check the finished work.
How a gas or electric boiler is removed, who is allowed to do it, what makes the job harder and how to dispose of the old boiler properly.
How a water heater or hot water cylinder is removed, what makes the job harder, when you need a professional and how to dispose of the old tank.
What smart thermostat pre-wiring involves, where to place the thermostat, what to prepare at the boiler and how to check the finished work.
How a heating or hot water circulation pump is fitted or replaced, how to choose the right type and what to check when the work is finished.
What a low loss header does, when your heating needs one, how it is fitted to an existing system and what to check before you accept the work.
How an expansion vessel in a heating system is fitted or replaced, how the pre-charge is set, which mistakes to avoid and how to check the finished job.
How an underfloor heating manifold is installed, balanced and pressure tested. What to watch out for and how to check the finished work.
How a hot water recirculation loop is installed, when it is worth it, which pump and controls to choose and what to check at handover.
How a hot water recirculation pump is installed, when it pays off, which pump and controls to choose and what to check before you accept the work.
What bonding a heating system means, how the boiler, pipes and cylinder connect to protective bonding, and how to check the finished work.
How threads are cut on steel and galvanised pipe, which thread type suits water, heating and gas, and how to check a threaded joint for leaks.
When steel heating pipework is welded with an oxy-acetylene flame, how the job is done, what to watch out for and how to check the finished weld.
How radiator brackets are fixed to concrete, brick, aerated block and plasterboard, what to watch out for and how to check the finished fixing.
When a thermostatic radiator valve needs replacing, how the job is done, which valve type to choose and what to watch for in flats and houses.
How a radiator lockshield (return) valve is replaced in a house or flat, how to choose the right replacement, how to set it and how to check the work.
How underfloor heating pipes are laid, which systems and pipes to choose, what to prepare before the installers arrive and how to check the finished work.
How underfloor heating system boards are laid, what to prepare, which board types exist, which mistakes to avoid and how to check the work before screeding.
How an air-to-water heat pump is installed, what to prepare, where the outdoor unit should go, which mistakes to avoid and how to check the finished work.
How a gas condensing boiler is installed, why the flue and condensate matter, what to prepare, which mistakes to avoid and how to check the finished work.
How multi-split air conditioning is installed, when it beats separate units, who may handle refrigerant and how to check the finished work.