Building work price list: Barbed Wire Tensioning
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Fencing cost | ||||
| Tension barbed wire | lm | €0.75 / lm | lm | enter quantity- |
| Laying concrete fence blocks | pcs | €4.00 / pcs | pcs | enter quantity- |
| Building fence piers | lm | €22.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 1.8 m | lm | €20.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.1 m | lm | €23.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.4 m | lm | €24.00 / lm | lm | enter quantity- |
| Fencing with DT 12/15 blocks | m² | m² | - | |
| Fencing with DT 20/25 blocks | m² | m² | - | |
| Remove old fencing | lm | €8.80 / lm | lm | enter quantity- |
| Install fence post up to 2.4 m | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install fence post up to 2.7 m | pcs | €28.00 / pcs | pcs | enter quantity- |
| Install fence post up to 3.8 m | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install fence strut up to 2.7 m | pcs | €1.70 / pcs | pcs | enter quantity- |
| Install barbed wire extension arm | pcs | €1.40 / pcs | pcs | enter quantity- |
| Tension straining wire | lm | €0.50 / lm | lm | enter quantity- |
| Install fence frame | pcs | pcs | - | |
| Install bespoke fence frame | pcs | pcs | - | |
| Install fence panels | pcs | pcs | - | |
| Install mesh fencing up to 1.4 m | lm | €2.50 / lm | lm | enter quantity- |
| Install mesh fencing up to 1.8 m | lm | €2.70 / lm | lm | enter quantity- |
| Install mesh fencing over 3.0 m | lm | €3.70 / lm | lm | enter quantity- |
| Blockwork corner bonding | pcs | €1.00 / pcs | pcs | enter quantity- |
When barbed wire is tensioned and why the tension matters
Barbed wire is used for simple fencing around fields, paddocks and gardens on the edge of a village. It is also added as a top security line on an existing mesh or panel fence, especially around stores and workshops. For an overview of fence types and how they are built, see the fencing section.
The tension decides whether the fence stays straight for years or starts to sag after the first winter. Barbed wire has no stiffness of its own. It holds only because of the pull between the end posts. A small fault in a fixing or a strut will show along the whole run over time.
What to settle before work starts
Before any work begins, confirm exactly where the boundary runs. Where the boundary is unclear, a survey by a land surveyor is worthwhile and can prevent later disputes with a neighbour.
A fence may need planning permission. Whether it does depends mainly on its height, whether it stands on a boundary with a neighbour or next to a road or public space, and on the type of fence. Check with the local planning authority before starting what your fence requires. Some minor alterations are classed as permitted development and do not need planning permission, but residential permitted development rights only apply to houses and can be removed in certain areas by Article 4 Directions.
Where barbed wire runs alongside a footpath or public space, remember that someone could be injured on it. On such a stretch, consider fixing the wire higher, setting it back from the edge of the property or using a different solution.
It also pays to decide the following in advance:
- Number and height of lines: two or three lines are usually enough for a simple boundary, more lines or a cranked arm for site security.
- Stand-alone fence or add-on: whether the wire forms the whole fence or only a top line above mesh or panels.
- Who supplies materials: whether the quote includes wire, strainers, clips and fixings, or labour only.
- Condition of the posts: if the posts are not yet in or are old and loose, installing or repairing them is a separate job that must be finished first. If an old fence is in the way, its removal comes before anything else.
- How length is measured: whether running metres are counted per line of wire or per length of fence regardless of the number of lines. This is a significant difference when comparing quotes.
How tensioning is done step by step
Tensioning follows on from posts that are installed and fully set. The usual sequence is:
- Checking the posts: the corner and end posts are checked to be firm, plumb and strutted. On a long straight run, extra straining posts with struts are added between corners, typically every 25 to 50 metres.
- Fixing the start: the end of the wire is firmly secured to a corner or end post, ideally with several wraps and a clamp.
- Running out: the coil is unwound slowly, ideally on a bar, so the wire does not twist or tangle. The wire is hung loosely on hooks or clips on the intermediate posts at the same height.
- Straining: a strainer is fitted at the far end of the section and the wire is tightened gradually in several short movements, without jerking.
- Checking the line: the wire is checked to be straight and not catching anywhere.
- Fixing: the wire is secured firmly to every post.
- Further lines: with several lines, each one is tensioned separately and the same vertical spacing is kept, usually about 25 to 30 cm.
- Finishing: surplus ends are cut off and bent back so they do not stick out.
Why are corner and end posts so important? The full pulling force of the wire bears on them. Diagonal struts are therefore usually added to stop the post leaning into the run as the wire is strained.
Materials and options: what to choose and when
Barbed wire differs in core thickness, barb spacing and finish. Galvanised wire is almost always chosen for a permanent fence. Cheaper wire with a thin zinc coating rusts sooner and snaps more easily during straining. Plastic-coated wire is chosen mainly where appearance matters.
- Strainers allow the wire to be tightened in a controlled way and easily re-tensioned later if it slackens.
- Steel posts are a common choice for a firm and fairly inexpensive fence.
- Concrete posts are heavier and suit long runs and higher loads, as used in concrete fencing up to 1.8 m.
- Timber posts are used mainly for paddocks and temporary fencing.
- Cranked arms, angled extensions at the top of the post, carry the wire at an angle and make climbing over harder. They are chosen where site security is the priority.
Small items such as clamps, tying wire and clips are often underestimated. In practice they decide whether the wire stays in place. If posts and wire are galvanised, use galvanised clamps and tying wire too, otherwise the joints will be the first to rust.
Barbed wire tensioning price per running metre
The guide labour price is €0.75 per running metre. The actual price is affected mainly by how difficult the ground is and how many straining points the fence has.
- Level ground and evenly spaced posts: the simplest situation. Post spacing is usually two to three metres, and with regular spacing the wire strains easily and evenly. The price stays near the lower end.
- Slopes or undulating ground: the wire has to be run in sections with extra anchor points. The work is noticeably slower.
- Bends and corners: each corner is a separate straining point with a strut. An irregular fence with many corners costs more per running metre than a straight line of the same length.
- Number of lines: each line is run out, strained and fixed separately, so this part of the work grows with the number of lines. Checking the posts and struts and preparing the run is done once, so three lines do not cost three times as much as one. Check whether the price is per running metre of one line or per running metre of fence.
- Height and cranked arms: fixing wire to arms at height needs a ladder or platform and more care, so it costs more than tensioning on a low fence.
- Access: an overgrown strip along the fence, shrubs and poor access slow the work and may mean a separate charge for clearing.
- Removing old wire: taking down old, rusted wire before new installation is laborious and is often charged separately, as is disposal. Before you hand over old wire and posts for disposal, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Materials: the labour price usually excludes wire, strainers and fixings. When comparing quotes, check what is included.
What makes the work easier and what slows it down
Good preparation by the customer saves a lot of time:
- the posts were set long enough in advance for the concrete around them to cure, as straining against freshly concreted posts can push them out of line,
- the boundary is marked out and the neighbour knows when work will take place,
- the strip along the fence is mown and can be walked with a coil of wire,
- materials are on site in the agreed quantity, ideally with a small allowance for fixing the ends,
- access to the property is agreed, including from the neighbour's side if the fence is on the boundary,
- children and animals are kept away from the working area.
Strong wind slows the work, as the wire is hard to run out and there is a risk of injury. Wet, muddy ground does the same, because it is hard to walk with a heavy coil.
Typical mistakes and how they show later
Too little tension. The wire waves, rubs against the posts in the wind and is easy to get past. Rubbing also damages the zinc coating, so the wire rusts sooner at those points.
Too much tension. The wire has no allowance for contraction in frost and can snap or pull out an end post. Wire strained in summer heat contracts in winter and tightens further. It should therefore never be strained to the limit.
Corner posts without struts or set too shallow. Over time they lean and the whole run slackens. This often shows only after the first winter, when frost and wet soil loosen the post in the ground.
Too long a run without an intermediate straining post. The wire is strained along the full length of the fence from one end. Tension is then uneven, tighter near the strainer and sagging at the far end. A long line needs straining posts with struts roughly every 25 to 50 metres.
Tightening in one jerk. Instead of gradual short movements, the wire is pulled up in one hard strain. This risks snapping the wire, slipping out of the clamp or pulling the end post out of line.
Weak or unsuitable clamps. The wire gradually slips in the fixing, tension drops and the fence sags even though the posts stand firm.
Galvanising damaged by tools. Scuffed areas rust first and the wire weakens there over time.
Working without gloves and safety glasses. If tensioned wire is released, there is a risk of serious injury to hands and eyes.
How to check the finished work
At handover, walk the full length of the fence and check the following:
- sighting along the wire from the end post, the line is straight, with no waves or sag between posts,
- pressing with a gloved hand midway between two posts, the wire moves only a few centimetres and springs back when released,
- the wire is not so tight that it does not give at all, nor is the end post visibly pulled into the run,
- corner, end and intermediate straining posts stand plumb and have struts,
- the wire is fixed to every post and does not slip in the fixing when pulled,
- the lines are at consistent heights and spacing, which can be checked with a tape measure on several posts,
- strainers are accessible for later re-tensioning,
- wire ends are bent back and do not stick out,
- there are no signs of tool damage on the galvanising,
- the area around the fence is tidy and no offcuts of wire are left in the grass.
DIY guide: tensioning barbed wire on a low fence
If you have a low fence with firmly set posts, you can do the tensioning yourself. Leave work on cranked arms or high fences to a professional. The method is the same as the professional installation described above. For DIY work, these points matter most:
- Get heavy work gloves, safety glasses, a strainer or wire tensioning pliers and side cutters.
- Wear tough long-sleeved clothing and put on gloves and glasses before unwrapping the coil.
- Have a helper hold the coil on a bar and support the wire while it is fixed.
- Before straining, pull by hand on the corner and end posts. If they move or have no strut, repair them first.
- When tightening, stand to the side of the wire, never in line with it behind the strainer.
- Test the tension as you go by pressing with a gloved hand: the wire should spring slightly but not visibly sag.
- Check the tension after a few weeks and re-tension if needed.
The line behind the strainer is the most dangerous place. If the wire snaps or slips out of the clamp, it whips back in exactly that direction.
Frequently asked questions
The guide price is €0.75 per running metre. The final price depends on the number of lines, the ground, the number of corners with straining points, the working height and whether old wire must be removed first. Materials are usually charged separately.
The wire should be straight with no visible waves and should spring slightly when pressed gently midway between posts. Too much tension loads the posts and the wire can snap in frost. Too little means sagging and a loss of security.
Two or three lines are usually enough for a simple boundary. Where more security is needed, extra lines are added or the wire is run on cranked arms. The lines should be evenly spaced up the fence, typically about 25 to 30 cm apart.
Yes, materials and posts settle in the first weeks. It is worth checking the tension after a few weeks and then at least once a year, ideally after winter.
It depends mainly on the height of the fence, its position, for example on a boundary with a neighbour or next to a road, and the type of fence. Do not assume that no permission is needed. Check with the local planning authority before work starts.
Its lifespan depends mainly on the quality of the galvanising and the environment. Good galvanised wire, correctly tensioned and with joints checked from time to time, lasts many years. Cheap wire with a thin protective coating rusts much sooner.
Yes, it is often added as a top security line above mesh or panels, either on extended posts or on cranked arms, for example on a concrete panel fence up to 2.1 m high. The posts, especially the corner and end posts, must be able to take the pull of the wire.
Related work
How old fence removal works, including posts and footings, what makes the job harder, what to check before you start and how to inspect the result.
How a concrete panel fence up to 1.8 m is installed, what foundations it needs, what to check about permission and how to inspect the finished fence.
How a concrete panel fence up to 2.1 m is installed, what footings and posts it needs, how it differs from lower and taller fences and what to check.
How a 2.4 m concrete panel fence is built: footings, posts, wind load, slopes, preparation and handover. How it differs from 1.8 m and 2.1 m fences.
How a fence of 12 and 15 cm concrete shuttering blocks is built, when thin blocks are enough, materials, typical mistakes and how to check the work.
How a fence of DT 20 and DT 25 formwork blocks is built, which block width to choose, what foundations it needs and what to check at handover.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.