Building work price list: Tensioning Straining Wire
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Fencing cost | ||||
| Tension straining wire | lm | €0.50 / lm | lm | enter quantity- |
| Laying concrete fence blocks | pcs | €4.00 / pcs | pcs | enter quantity- |
| Building fence piers | lm | €22.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 1.8 m | lm | €20.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.1 m | lm | €23.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.4 m | lm | €24.00 / lm | lm | enter quantity- |
| Fencing with DT 12/15 blocks | m² | m² | - | |
| Fencing with DT 20/25 blocks | m² | m² | - | |
| Remove old fencing | lm | €8.80 / lm | lm | enter quantity- |
| Install fence post up to 2.4 m | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install fence post up to 2.7 m | pcs | €28.00 / pcs | pcs | enter quantity- |
| Install fence post up to 3.8 m | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install fence strut up to 2.7 m | pcs | €1.70 / pcs | pcs | enter quantity- |
| Install barbed wire extension arm | pcs | €1.40 / pcs | pcs | enter quantity- |
| Tension barbed wire | lm | €0.75 / lm | lm | enter quantity- |
| Install fence frame | pcs | pcs | - | |
| Install bespoke fence frame | pcs | pcs | - | |
| Install fence panels | pcs | pcs | - | |
| Install mesh fencing up to 1.4 m | lm | €2.50 / lm | lm | enter quantity- |
| Install mesh fencing up to 1.8 m | lm | €2.70 / lm | lm | enter quantity- |
| Install mesh fencing over 3.0 m | lm | €3.70 / lm | lm | enter quantity- |
| Blockwork corner bonding | pcs | €1.00 / pcs | pcs | enter quantity- |
What straining wire does and when it needs tensioning
Chain link mesh has no shape of its own. It is a soft net, and the straining wire is what turns it into a fence. The wire holds the mesh at the top, middle and bottom and carries its weight and the wind load to the posts. If the wire is not properly tensioned, the mesh soon sags and bulges, and the fence looks neglected even when it is brand new.
The end, corner and gate posts take the most load. All the tension in the wire pulls on them, so they are fitted with struts that brace them against the pull. Intermediate posts only guide the wire and keep it at the right height. The same method is used for livestock fencing, deer fencing around orchards and barbed wire on the cranked arms of security fencing. For an overview of the wider trade, see fencing work and its typical stages.
Straining wire needs tensioning in these situations:
- new fence: the posts are set and the concrete has cured, then the wire goes up, and only after that the mesh,
- mesh replacement: the old wire is often rusty or frayed, and since the mesh is coming down anyway, it makes sense to replace the wire too,
- sagging fence: the mesh droops between posts because the wire or the tensioner has slackened,
- after damage: a car has hit the fence, a tree or branch has fallen on it, and the wire has snapped or pulled loose.
What to agree before ordering the work
The tensioning itself is a short job, but much of the result is decided before the fencer arrives.
- How the metres are counted. A price per running metre can mean one metre of a single line of wire or one metre of fence. With three lines, that is a threefold difference. When comparing quotes, ask how the length is measured.
- Number of lines for the mesh height. Mesh up to about 1 m high often needs only two lines, top and bottom. A typical garden fence of around 1.25 to 1.6 m has three lines, top, middle and bottom. A fence of around 2 m has three to four lines so the mesh does not sag in the middle.
- Wire gauge. Straining wire is usually around 3 to 3.5 mm in diameter. For plastic-coated wire, the figure may include the coating. Thin tie wire is not strong enough for tensioning.
- One system. The wire, tensioners, struts and brackets should come from one system and match the mesh and posts - galvanised with galvanised, plastic-coated with plastic-coated in the same colour.
- Who supplies the materials. Agree whether you buy the wire, tensioners, struts and tie wire or the fencer brings them. If you supply your own, check that the brackets and struts fit your posts.
- Length of runs. One tensioner can only sensibly tighten a limited length of wire. On long straight runs, an additional straining post with struts is usually fitted roughly every 25 to 50 m. It helps to know this when the posts are being set.
- Condition of the posts. On a new fence, the concrete around the posts must cure sufficiently. A wait of at least several days to a week is usual, and concrete reaches full strength in about 28 days. On an old fence, check that the posts are not rusted through at ground level and do not move.
- Gates. The wire ends at gates, and gate posts need the same struts as end posts.
- Old wire. Agree whether it needs removing and who takes it away. As a householder you have a duty of care for your waste, so check that whoever takes it is a registered waste carrier and ask for a waste transfer note. If the whole fence is coming down, old fencing removal is usually ordered as a separate item.
- Boundary with a neighbour. If the fence stands on the boundary, agree with your neighbour in advance, including access from their side.
Materials and fittings: what to choose
- galvanised wire suits normal conditions and galvanised mesh,
- plastic-coated wire has a zinc layer under the plastic, resists damp better and matches green or anthracite mesh,
- tensioners (ratchet strainers or eye bolt strainers) allow the wire to be tightened gradually and re-tightened later, and a good tensioner does not slacken on its own,
- a stretcher bar is threaded through the edge of the mesh at end posts and spreads the pull over the full height,
- struts, clamps and brackets should come from the same system as the posts so they fit together,
- tie wire is used to fix the mesh to the line wires.
The tools needed are combination pliers, side cutters, a key or handle for the tensioner and a string line or spirit level to check heights.
With plastic-coated wire, service life depends mainly on an undamaged coating. If pliers or a sharp bracket edge cut it during fixing, water reaches the steel and the wire starts rusting at exactly that point. This is why fittings from one system, which fit the wire precisely and have no sharp edges, are worth it.
How to tension straining wire step by step
A good fencer starts by checking the posts, not the wire. A loose or leaning post will lean even further once the wire is tensioned.
- Check the posts: the posts are in line, at the same height, firmly set, and the concrete has cured sufficiently.
- Struts: struts are fitted to end, corner and gate posts in the direction of the wire's pull.
- Line heights: a string line or spirit level is used to mark on the posts where each line of wire will run.
- Tying off at the start: the wire is tied to the first end or corner post with a secure loop so the joint holds the full tension.
- Running the wire: the wire is run through the brackets or holes on the intermediate posts, straight and without kinks.
- Tensioner: a tensioner is fitted at the other end post, the wire is attached and tightened in small turns.
- Watching the post: while tightening, check that the wire is not slipping and the end post is not leaning.
- Correct tension: stop tightening when the wire is straight and gives firm resistance when pressed by hand, but does not ring like a guitar string. The tensioner should not be wound fully home, so it can be tightened again later.
- Remaining lines: all lines are tensioned evenly so the mesh is not pulled unevenly.
- Ends: surplus wire is cut off and the ends are bent over so nobody gets hurt.
- Mesh: if it is part of the job, the mesh is threaded onto a stretcher bar at the end posts and fixed to the wires with tie wire.
On a fence with corners, the wire is tensioned in separate straight runs, corner to corner. A long wire pulled around several corners is hard to tension and wears at the bends. The wire beds in after a few days, so it is worth checking and gently re-tightening if needed.
Price for tensioning straining wire
The guide labour price is €0.50 per running metre. It applies to a simple case: a straight fence on level ground, firmly concreted posts and system struts. The final price is moved by these factors:
- Condition of the posts: if the posts first need straightening, re-concreting or fitting with struts, that is extra work and often costs more than the tensioning itself. On a wobbly old fence, the price can rise several times over because the whole structure is effectively being repaired.
- Ground: on a slope or uneven ground, the wire must follow the ground line and the height must be checked at every post. The work is noticeably slower.
- Number of corners, changes of direction and gates: each run is tensioned separately, with its own tie-off and tensioner. Short runs cost more per metre than one long straight run.
- Number of lines: if the price is per metre of fence, each extra line adds time.
- Fence height: on taller fences the top line is tensioned from a ladder, which slows the work.
- Removing old wire: rusty, overgrown or tangled wire takes effort to remove, and disposal is added on top.
- Access: an overgrown plot or a fence right next to a neighbour's building, with little room to work.
- Materials: plastic-coated wire and good tensioners cost more than the cheapest galvanised ones but last longer and need fewer repairs.
- Small jobs: for repairs of a few metres, fencers often charge a minimum call-out fee, so the price per metre is higher.
What you can prepare
Besides the condition of the fence, a lot depends on how the site is prepared. The fencer works faster when there is a cut strip along the whole fence on both sides, free of long grass, nettles and branches. If the fence is on the boundary, arrange access from the neighbour's land in advance, otherwise work is only possible from one side.
If you buy the materials yourself, have them on site and checked: enough wire, a tensioner for each line of each run, and struts and brackets that fit the posts. A clear brief also helps - where the gates will be, at what heights the lines should run and whether the mesh is to be fixed on the same day.
The work takes longer in the rain, because pliers and wet wire are awkward to handle. An unnecessary second visit is caused by booking the job for posts whose concrete has not yet cured. Dogs and animals loose on the property and cars parked tight against the fence also cause delays.
Typical mistakes and how they show later
Overtensioned wire. The most common mistake comes from the belief that the tighter the wire, the better. Wire that is too tight pulls constantly on the end and corner posts. They gradually lean, bend or work loose in the concrete, and the fence slackens anyway.
Tensioning in heat or frost. Steel lengthens slightly in summer and shortens in winter. Wire tensioned to the maximum on a hot day is overloaded in January and pulls even harder on the end posts. Wire tensioned in frost sags in summer. This is why tensioning is done in mild weather and only to the point where the wire is straight and springs firmly, not hard as a string.
Wire too slack. The mesh ripples and sags within the first months. It is most visible in the middle of long runs and below the top edge of the mesh.
Missing or weak struts. End and corner posts gradually lean into the fence. The wire slackens, the mesh sags, and re-tightening only helps briefly until the post is secured.
Tensioning before the concrete cures. The post moves in the fresh concrete and stays leaning. The repair often means breaking it out and concreting it again.
Lines tensioned unevenly. The mesh is straight at the top and bulging at the bottom, or the other way round. The fence looks crooked even with straight posts.
Wire kinked at corners. At the bend, the wire breaks or the coating wears and rust starts. Eventually it snaps and the whole run goes slack.
Cheap tensioners or a tensioner wound fully home. A cheap tensioner slackens after the first winter. If it was tightened all the way during installation, it cannot be tightened further and has to be replaced, or the wire cut and re-tensioned.
Damaged coating. Rust spots appear on plastic-coated wire wherever the coating was cut during installation.
How to check the finished work
At handover, walk the whole fence and sight along it from both ends of each run. Check that:
- the wire is straight when viewed along the fence, with no sags or waves,
- all lines are tensioned roughly equally and spring similarly when pressed by hand,
- the wire runs at the same height at every post, and parallel to the ground on a slope,
- end, corner and gate posts are plumb and have struts fitted,
- tensioners are tightened, do not slip and still have reserve for later re-tightening,
- joints at the posts are secure and the wire is not kinked at corners,
- wire ends are cut and bent over,
- the finish on the wire and brackets has not been damaged during installation,
- the area around the fence is tidy and no wire offcuts are left in the grass.
DIY guide: what to watch out for
You can tension the wire yourself if the posts are already firmly set, have struts and the fence is no taller than a typical garden fence. The method is the same as in the step-by-step section above. For DIY work, also note:
- wear sturdy gloves and safety glasses, as tensioned wire can whip if it snaps or slips out of a joint,
- stand to the side of the wire while tensioning or releasing it, not in line with it,
- tighten the tensioner in small turns and test the wire by hand every few turns, not by eye,
- handle plastic-coated wire carefully with pliers so you do not cut the coating,
- work run by run, corner to corner, and finish one run before starting the next.
If an end post moves during tensioning, stop. Release the tension and secure the post first. Wobbly posts, missing struts or a fence on a steep slope are better left to a fencer. If a solid boundary suits the site better than mesh, an installation of concrete fencing up to 1.8 m or installing a concrete panel fence up to 2.1 m high needs no straining wire at all.
Frequently asked questions
The guide price is €0.50 per running metre. The price goes up mainly with old or wobbly posts, slopes, many corners and gates, and removal of old wire. When comparing quotes, ask whether the price is per metre of a single line of wire or per metre of fence.
The wire should be straight along its whole length and spring firmly when pressed by hand. If it bends easily, it is slack. If it is hard as a string and the end post is leaning, it is overtensioned.
First a few days after installation, then usually once a year, ideally in spring after the winter. A check is also worthwhile after strong winds or if something hits the fence.
Yes, if the tensioner still has reserve. Turn it with the key or handle until the wire is straight again. If the tensioner is wound fully home or damaged, it needs replacing, which sometimes means partly releasing the mesh at the end post.
Yes, if the posts are firm and not rusted through at ground level. Wobbly or rusted posts must first be secured or replaced, otherwise the new wire will pull them over.
Re-tightening the wire on an existing fence is maintenance. For a new fence or a significant change to an existing one, check in advance with your local planning authority what applies, particularly for taller fences, fences next to a road or properties in a conservation area. Residential permitted development rights only apply to houses, so if you live in a flat or maisonette you are likely to need planning permission, and in some areas these rights are removed by Article 4 Directions. For a fence on the boundary, it is also sensible to agree with your neighbour.
Related work
How old fence removal works, including posts and footings, what makes the job harder, what to check before you start and how to inspect the result.
How a concrete panel fence up to 1.8 m is installed, what foundations it needs, what to check about permission and how to inspect the finished fence.
How a concrete panel fence up to 2.1 m is installed, what footings and posts it needs, how it differs from lower and taller fences and what to check.
How a 2.4 m concrete panel fence is built: footings, posts, wind load, slopes, preparation and handover. How it differs from 1.8 m and 2.1 m fences.
How a fence of 12 and 15 cm concrete shuttering blocks is built, when thin blocks are enough, materials, typical mistakes and how to check the work.
How a fence of DT 20 and DT 25 formwork blocks is built, which block width to choose, what foundations it needs and what to check at handover.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.