Fence Frame Installation

Fence frame installation means fixing a frame made of sections to the posts so that it is straight, firm and in line. The guide price is €55.00 per piece, depending mainly on frame weight and size, ground and fixing method.

Updated 09/2026·10 min read·22 price list items
Standard labour price
€55.00/ pcs
Indicative range
€44.00 - €71.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Fence Frame Installation

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Foundations and fencing22 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Fencing cost

Install fence framepcs€55.00 / pcspcsenter quantity-
Laying concrete fence blockspcs€4.00 / pcspcsenter quantity-
Building fence pierslm€22.00 / lmlmenter quantity-
Install concrete fencing up to 1.8 mlm€20.00 / lmlmenter quantity-
Install concrete fencing up to 2.1 mlm€23.00 / lmlmenter quantity-
Install concrete fencing up to 2.4 mlm€24.00 / lmlmenter quantity-
Fencing with DT 12/15 blocksm²m²-
Fencing with DT 20/25 blocksm²m²-
Remove old fencinglm€8.80 / lmlmenter quantity-
Install fence post up to 2.4 mpcs€25.00 / pcspcsenter quantity-
Install fence post up to 2.7 mpcs€28.00 / pcspcsenter quantity-
Install fence post up to 3.8 mpcs€35.00 / pcspcsenter quantity-
Install fence strut up to 2.7 mpcs€1.70 / pcspcsenter quantity-
Install barbed wire extension armpcs€1.40 / pcspcsenter quantity-
Tension straining wirelm€0.50 / lmlmenter quantity-
Tension barbed wirelm€0.75 / lmlmenter quantity-
Install bespoke fence framepcspcs-
Install fence panelspcspcs-
Install mesh fencing up to 1.4 mlm€2.50 / lmlmenter quantity-
Install mesh fencing up to 1.8 mlm€2.70 / lmlmenter quantity-
Install mesh fencing over 3.0 mlm€3.70 / lmlmenter quantity-
Blockwork corner bondingpcs€1.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What a fence frame is and when it is worth having

A fence frame is a rigid perimeter made of metal sections that holds the infill of the fence: mesh, a steel panel or timber slats. Frames are hung between posts, and each one forms a single bay of the fence. Homeowners usually choose this when putting up a new boundary fence around a house or when replacing old mesh that has started to sag between the posts. For an overview of the options, see the general guide to fencing work.

Mesh stretched directly between posts tends to go wavy over time. A frame keeps its shape, so the fence still looks neat years later. If you need a solid, low-maintenance boundary instead, compare concrete fencing up to 1.8 m or a concrete panel fence up to 2.1 m high. Because one frame normally fills one bay, installation is priced per piece. Once you know the length of the fence and the width of the frames, the number of pieces is easy to work out. For example, 30 m of fence with frames 2.5 m wide means roughly 12 bays. Corners and gateways need to be added separately.

What to decide and check before placing an order

The wrong materials, an unclear boundary or a cable in the ground can stop the job before it starts. Clear up these points before you sign the order.

  • Exactly where the boundary runs. A fence on a shared boundary is a common cause of disputes with neighbours. If you are not sure where the line is, have it set out by a land surveyor before any digging starts.
  • Whether the fence needs planning permission. For a fence on the boundary with a neighbour or along a road, check in advance whether permission is required. The rules depend mainly on the height of the fence, where it stands and whether the property is listed or in a conservation area. The local planning authority can give a reliable answer.
  • Whether underground services run along the fence line. Before digging, find out whether electricity, water, gas or telecoms cables run along the line. Ask the network operators for their records and have the line checked with a cable locator. If you damage a gas pipe while digging or smell gas, leave the area and call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). Call the emergency line, not your energy supplier. Any work on gas pipes must be done by a Gas Safe registered engineer, and work on electrical services by a qualified electrician.
  • Fence height and type of infill. A taller fence and a solid infill catch more wind, so they need sturdier posts and often closer spacing.
  • Whether the posts are already in or still to be set. Fitting frames and setting posts are two separate jobs. Check in the quote exactly what the price per piece includes.
  • Who supplies the materials. If you buy the frames yourself, agree the bracket system and fixings with the installer so that everything fits the posts.

Steel frame, aluminium frame or frame with timber infill

A galvanised steel frame takes the highest loads and suits places where the fence catches the wind or serves as a security barrier. Galvanising, often with a powder coat on top, protects the steel from rust. Cutting or drilling breaks this protection, so the spot must be treated straight away with zinc-rich paint.

An aluminium frame is lighter and does not rust, so it needs very little maintenance. It is less rigid than steel, so it is mostly used for decorative, lightly loaded fences, typically along the street frontage of new-build homes.

A metal frame with timber infill looks natural in a garden. The metal frame carries the structure and the timber provides the look. The timber does, however, need regular treatment and protection from moisture, otherwise it weathers quickly.

Made-to-measure frames make sense on a slope, on an irregular plot or at non-standard heights. Standard panels would need a lot of adjustment there, whereas a frame made to site measurements fits first time.

How fence frame installation works step by step

A frame is only as straight as the posts beneath it. Most of the work is therefore done before the first frame is even lifted off the ground.

  1. Setting out the line. Pegs and a taut string line mark where the fence will run. Posts are usually 2 to 3 metres apart, but the exact spacing is dictated by the frame width.
  2. Setting the posts. Holes are dug deep enough for the base to sit below the frost line - the right depth depends on the soil, the fence height and the manufacturer's guidance. The bottom is compacted, often with a layer of gravel, and the posts are concreted in exactly plumb.
  3. Letting the concrete cure. The posts must not be loaded until the concrete has hardened. The manufacturer of the concrete mix states how long this takes. Rapid-setting postcrete needs less time, standard concrete takes days.
  4. Checking the posts before fitting. The installer checks that the posts are plumb and measures the spacing. If a post has moved, now is the time to sort it out, not after the frame is hung.
  5. Fixing the frames. Frames are fixed to the posts with brackets and bolts, and steel frames are sometimes welded. Work starts from an end post, and each piece is checked straight away with a spirit level and the string line.
  6. Tightening and infill. Once all the frames are in position, the fixings are tightened and the infill is fitted, if it is not already part of the frame.
  7. Corrosion protection. Cuts, drilled holes, welds and scratches are treated with zinc-rich paint.

What the installation price depends on

The guide price for labour is €55.00 per piece. It applies to a standard-size frame bolted with brackets to posts that are already in place, on level ground with good access. In such conditions an installer fits system frames of one width the fastest. The price per piece goes up with the following:

  • Slope. Frames have to be stepped or made raked, and each bay is set individually. The effort grows with the gradient, and considerably so on steep ground.
  • Frame weight and size. Heavy frames with solid infill need more people or lifting equipment. A taller and wider frame is harder to hold in position while levelling.
  • Fixing method. Welding on site and then treating the joints against corrosion takes longer than bolting with system brackets.
  • Non-standard sizes, corners and changes of direction. Short end bays, corners and connections to a gate or pedestrian gate take longer than a straight run.
  • Uneven old posts. When frames are hung on existing posts that are not plumb or are unevenly spaced, the frames have to be adjusted or the posts replaced.
  • An old fence. If it first has to be taken down and its footings broken out, that is extra work - see old fencing removal.
  • Post setting included. If the installer also sets the posts, the ground matters too. Soft soil digs quickly, while stony or clay soil, or a high water table, slows digging considerably.

When comparing quotes, ask whether the price per piece includes fixings, treatment of cuts, fitting the infill and waste removal, or whether these are charged separately. Before you hand over rubble or old footings, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.

What makes the job easier and what slows it down

How quickly the work goes depends a lot on how well the site is prepared when the installer arrives. It helps to:

  • have the boundary set out and underground services marked before digging begins,
  • clear a strip along the fence line, removing shrubs, stones, pallets and stored materials,
  • provide access for the delivery vehicle as close to the fence line as possible,
  • make a power supply for tools and water for mixing concrete available,
  • supply frames, brackets and bolts complete and checked, if you are buying them yourself,
  • agree with your neighbour in advance if work has to be done from their side,
  • agree where the excavated soil will go.

The job is slowed down by rain, frost or waterlogged ground, missing parts discovered only during installation, and last-minute changes to the line or height of the fence. Concrete should not be placed in frost, because it sets slowly at low temperatures and can be damaged.

Common mistakes and how they show up later

Uneven post spacing. The frame then does not fit or is forced into place under stress. This shows as uneven gaps at the posts, and the fixings can work loose over time.

Shallow footings. Posts set above the frost line are gradually lifted and tilted by frost. The problem appears after one or two winters, when the fence line starts to wave.

Loading fresh concrete. The post moves and cannot be straightened again. The frame hangs crooked, and the only fix is to concrete the post in again.

Checking only at the end. A small deviation on the first bay carries over to all the others and the errors add up. At the end of the run this usually shows as a visible gap, stress in the structure or a last bay that is narrower, wider or out of square. The fix then means redoing the whole run.

Untreated cuts and holes. Rust starts exactly where the galvanising has been damaged. The first rust streaks running down the frame often appear within a few months.

Cheap fixings. Non-galvanised bolts rust and the joints loosen. The frame then rattles against the post in the wind.

Concrete flush with the ground and no fall. Water sits at the base of the post, gets into the joint and can crack the concrete in winter.

DIY guide: fitting a fence frame to the posts

If the posts are already firmly concreted in and the frames are bolted on with brackets, you can do the installation yourself. You will need a helper, a spirit level, a string line, a tape measure, a cordless drill-driver and spanners. Leave any welding to a welder.

  1. Check that the concrete under the posts has cured sufficiently according to the manufacturer.
  2. Stretch a string line at the height of the top edge of the frames along the full length of the fence.
  3. Check the posts for plumb with a spirit level and measure the spacing between them.
  4. On the frame, measure the distance from its top edge to the bracket fixing point.
  5. Measure this distance down from the string on each post and fix the brackets at the same mark.
  6. Fit the first frame at the end post and tighten the bolts only lightly for now.
  7. Check the frame with a spirit level both horizontally and vertically and adjust if needed.
  8. Continue with the other frames in the same way, checking the line against the string as you go.
  9. Once all the frames are in place, tighten all bolts fully.
  10. Treat every cut, drilled hole and scratch with zinc-rich paint.
  11. Fit the infill if it is not part of the frame, and tension mesh evenly so it does not wave.

Wear work gloves when handling frames, as the cut edges of sections and mesh are often sharp. Do not lift heavy frames on your own.

How to check the finished fence at handover

At handover, walk the full length of the fence on both sides and do not hesitate to take hold of the frames. Most faults can be spotted by eye, with a spirit level and by giving the frames a shake.

  • the posts stand plumb and do not move when pushed,
  • the top edge of the frames follows one line, or even steps on a slope,
  • looking along the fence from one end, the frames show no wave or "kink",
  • the gaps between frame and post are the same along the whole length,
  • all bolts are tightened and none is missing,
  • nothing rattles or creaks when a frame is shaken,
  • cuts, holes and welds are treated against corrosion,
  • the infill is firmly fixed and the mesh does not wave,
  • the concrete around the posts is not cracked and water drains away from the post,
  • the site is tidy and excavated soil has been removed or spread as agreed.

Frequently asked questions

As a guide, €55.00 per piece. The price goes up with a slope, a heavy or non-standard frame, welding on site, corners and changes of direction, and removal of an old fence. Check whether the price includes setting the posts and the fixings.