Chain Link Fencing Installation up to 1.8 m

Installing chain link fencing up to 1.8 m means running out, tensioning and tying the mesh to posts set in concrete. The guide price is €2.70 per running metre. The ground, the terrain and the number of corners and gates affect it most.

Updated 09/2026·11 min read·22 price list items
Standard labour price
€2.70/ lm
Indicative range
€2.16 - €3.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Chain Link Fencing Installation up to 1.8 m

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Foundations and fencing22 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Fencing cost

Install mesh fencing up to 1.8 mlm€2.70 / lmlmenter quantity-
Laying concrete fence blockspcs€4.00 / pcspcsenter quantity-
Building fence pierslm€22.00 / lmlmenter quantity-
Install concrete fencing up to 1.8 mlm€20.00 / lmlmenter quantity-
Install concrete fencing up to 2.1 mlm€23.00 / lmlmenter quantity-
Install concrete fencing up to 2.4 mlm€24.00 / lmlmenter quantity-
Fencing with DT 12/15 blocksm²m²-
Fencing with DT 20/25 blocksm²m²-
Remove old fencinglm€8.80 / lmlmenter quantity-
Install fence post up to 2.4 mpcs€25.00 / pcspcsenter quantity-
Install fence post up to 2.7 mpcs€28.00 / pcspcsenter quantity-
Install fence post up to 3.8 mpcs€35.00 / pcspcsenter quantity-
Install fence strut up to 2.7 mpcs€1.70 / pcspcsenter quantity-
Install barbed wire extension armpcs€1.40 / pcspcsenter quantity-
Tension straining wirelm€0.50 / lmlmenter quantity-
Tension barbed wirelm€0.75 / lmlmenter quantity-
Install fence framepcspcs-
Install bespoke fence framepcspcs-
Install fence panelspcspcs-
Install mesh fencing up to 1.4 mlm€2.50 / lmlmenter quantity-
Install mesh fencing over 3.0 mlm€3.70 / lmlmenter quantity-
Blockwork corner bondingpcs€1.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

How 1.8 m compares with lower and higher fences

Chain link up to 1.4 m is most often used around gardens, allotments, holiday plots and between neighbouring properties. It stops a dog and most wildlife, looks light and does not block the view. It is the simpler option and a capable DIYer can manage it. Compared with it, a 1.8 m fence needs deeper corner posts, stronger struts and more rows of line wire.

Chain link over 3 m belongs to commercial sites, warehouses, sports pitches, farms and deer enclosures. This is no longer an ordinary garden fence but a structure the wind pushes like a sail. It uses heavier posts, deeper foundations, more rows of line wire and often cranked extension arms for barbed or razor wire. A fence like this should be designed and built by a specialist.

What to decide before placing an order

Most fencing problems need to be solved before the first hole is dug. Once the posts are concreted in, every change is expensive.

  • Where the boundary actually runs. If in doubt, have it set out by a land surveyor so the fence does not end up on the neighbour's land. Disputes over a few tens of centimetres are hard to settle once the fence is up.
  • Agreement with the neighbour. For a fence on the boundary, agree in advance who builds it, who pays and which side the posts will face.
  • Planning permission. Rules depend on the height, the location and the property. Fences next to a road, around listed buildings or in conservation areas are more likely to need consent. Some minor alterations to houses are classed as permitted development and do not need planning permission, but these rights can be removed in certain areas by Article 4 Directions. Check the Planning Portal or the local planning authority before ordering materials.
  • Gates. Their position and width determine the post layout. Gate posts carry more load than intermediate posts, so they need a stronger section and a bigger foundation.
  • Gravel boards. If there is a dog that digs, or animals need to be kept from burrowing under, decide on them at the start. Fitting them later is more awkward.
  • Material. The choice of mesh affects both the lifespan and the look of the fence.
  • Guarantee. Agree in writing what the guarantee covers, for example leaning posts or slack mesh, and how long it lasts.

Which mesh to choose

  • Galvanised chain link is the basic option, suited to places where function matters more than appearance. In damp conditions it may rust over time.
  • PVC-coated chain link has a plastic layer, usually green, over galvanised wire. It resists moisture and knocks better and looks more natural in a garden. It is the more common choice for a permanent fence around a house.
  • Welded mesh or heavier-gauge chain link is used on tall fences where the mesh has to take more tension.

Besides the mesh, the job needs intermediate posts, stronger corner and end posts, struts, line wire, wire tensioners, tying wire or clips, and concrete to set the posts. Saving money on small fixings is false economy, as that is where a fence loosens first. Posts and struts should have the same finish as the mesh so the fence weathers evenly.

How the installation works step by step

  1. Setting out the line: the line is marked with pegs and a string line along the confirmed boundary. Positions of gates and corners are fixed.
  2. Spacing the posts: posts usually go every 2 to 2.5 m, closer together on an exposed site. Spacing is adjusted so the bay next to a gate or at the end is not needlessly short.
  3. Digging the holes: holes for intermediate posts are roughly 60 to 80 cm deep. At 1.8 m height, corner, end and gate posts need a deeper and wider foundation, at least 80 cm and up to about 1 m depending on the location, to get below the frost line. Smaller holes for the struts are dug next to them.
  4. Corner and end posts: these are concreted first, together with their struts, because the whole run of mesh is tensioned against them. Each one is checked with a spirit level in both directions.
  5. Intermediate posts: a string line is run between the end posts and the intermediate posts are set to it, each checked with a level. The line keeps them straight and at the same height.
  6. Curing the concrete: the posts are left unloaded for a guide period of at least 5 to 7 days, longer in cold weather. The exact time is given by the concrete manufacturer.
  7. Line wires: at 1.8 m they run in three or four rows - bottom, top and middle, with four rows preferred on an exposed site. They are fixed into tensioners on the end posts and pulled tight.
  8. Unrolling and fixing the mesh: the mesh is unrolled along the fence and fixed at an end post. At each end it is usually threaded with a tension bar that spreads the pull over the full height.
  9. Tensioning: the mesh is tightened gradually, not in jerks, towards the other end so it stays straight and the posts do not lean.
  10. Tying: the mesh is tied to every post and to the line wires at regular intervals.
  11. Finishing: sharp wire ends are bent over, the line and tension are checked and the area along the fence is cleared.

The work is done in two visits. First the posts are set and concreted, then the concrete is left to cure, and only then is the mesh tensioned. Even though an ordinary fence around a house does not take many working days, at least a week usually passes from the first hole to the finished fence.

What affects the price

The guide labour price is €2.70 per running metre. It applies to normal conditions, and the final figure can vary considerably depending on the plot and the design of the fence.

  • Ground: in stony or clay soil, holes are hard to dig and the work takes noticeably longer. On rock, where a breaker or drill is needed, the cost can rise by tens of percent.
  • Slope: the fence has to be stepped or the mesh shaped to the ground. Every change of gradient means more measuring, cutting and tensioning.
  • Old fence: removing the old fencing and breaking out old concrete footings is a separate item and often an awkward, labour-intensive one. Before you hand over the rubble or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
  • Number of corners, gates and short runs: every end needs a strong post with a strut and its own tensioning. A fence with many corners costs more per running metre than one long straight line.
  • Extras: gravel boards, a fourth row of line wire or barbed wire add labour and materials.
  • Access: a narrow gap between the neighbour's fence and a building, dense shrubs or a plot that materials cannot be delivered to all slow the job down.

When comparing quotes, ask whether the price includes digging the holes, concreting the posts, materials and removal of spoil, or only running out and tensioning the mesh.

What makes the job easier and what slows it down

  • A clear fence line: mown grass, cut-back shrubs and stones, timber or compost moved away from the boundary save the installers several hours.
  • Boundary set out in advance: if the surveyor only arrives on installation day, or the boundary is being argued over with the neighbour on site, the work stops.
  • Known underground services: before digging, it must be known where water pipes, drains, service connections and cables run. If unsure, have them traced. Any damage to an electric cable must be dealt with only by a qualified electrician, and to a gas pipe only by a Gas Safe registered engineer. If you smell gas, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland).
  • Water supply and space for materials: mixing concrete needs water, and posts, rolls of mesh and bags of concrete need space close to the fence line.
  • Weather: concreting is postponed in frost or heavy rain. In waterlogged soil the sides of the holes collapse and digging takes longer.
  • All materials on site: if a tensioner or tying wire is missing, the work stops halfway.

Common mistakes and how they show up later

Shallow foundations. After the first winter or a strong wind the post starts to rock and pulls the whole bay with it. This happens most often at corners that were concreted as shallow as the intermediate posts.

Missing struts at corners. Tensioned mesh gradually pulls the corner post inwards. At 1.8 m the pull is greater than on a low fence, so it shows sooner.

Tensioning against fresh concrete. The post leans and cannot be straightened again.

Posts spaced too far apart. The mesh sags between posts and flaps in the wind.

Too few line wires. With only three rows on an exposed site, the mesh bulges between the wires and slackens over time.

Uneven or excessive tension. Slack mesh ripples, while overtightened mesh bends the posts.

A crooked line. On a long fence, even a small deviation at the start becomes obvious at the far end.

A large gap under the mesh. A dog or wildlife digs under the fence and the bottom edge of the mesh gets bent upwards.

Concrete footing without a fall. If water sits around the post, frost damages the footing in winter and the post corrodes sooner at ground level.

How to check the finished fence at handover

  • the posts are plumb and in line, and none moves when pushed,
  • corner and end posts have struts,
  • concrete footings are solid, without voids, and water does not stand around them,
  • line wires are tight and firmly held in the tensioners,
  • the mesh is straight, without ripples or sags, and at the same height along its full length,
  • the mesh is tied to every post and to the wires,
  • the gap under the mesh is even and suited to what the fence is meant to keep in or out,
  • the finish on the mesh and posts is undamaged,
  • sharp wire ends are bent over and the area around the fence is tidy.

Frequently asked questions

As a guide, €2.70 per running metre. Expect to pay more for stony or clay ground, sloping sites, removal of an old fence and fences with many corners and gates.