Price list 2026 · Europe

Panel Fencing Installation

Panel fencing installation means setting posts and fixing rigid welded steel mesh panels between them. The guide price is €85.00 per panel. Ground conditions, slope, fence height and how the posts are fixed have the biggest effect on cost.

Updated 09/2026·11 min read·22 price list items
Standard labour price
€85.00/ pcs
Indicative range
€68.00 - €110.50
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Panel Fencing Installation

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Foundations and fencing22 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Fencing cost

Install fence panelspcs€85.00 / pcspcsenter quantity-
Laying concrete fence blockspcs€4.00 / pcspcsenter quantity-
Building fence pierslm€22.00 / lmlmenter quantity-
Install concrete fencing up to 1.8 mlm€20.00 / lmlmenter quantity-
Install concrete fencing up to 2.1 mlm€23.00 / lmlmenter quantity-
Install concrete fencing up to 2.4 mlm€24.00 / lmlmenter quantity-
Fencing with DT 12/15 blocksm²m²-
Fencing with DT 20/25 blocksm²m²-
Remove old fencinglm€8.80 / lmlmenter quantity-
Install fence post up to 2.4 mpcs€25.00 / pcspcsenter quantity-
Install fence post up to 2.7 mpcs€28.00 / pcspcsenter quantity-
Install fence post up to 3.8 mpcs€35.00 / pcspcsenter quantity-
Install fence strut up to 2.7 mpcs€1.70 / pcspcsenter quantity-
Install barbed wire extension armpcs€1.40 / pcspcsenter quantity-
Tension straining wirelm€0.50 / lmlmenter quantity-
Tension barbed wirelm€0.75 / lmlmenter quantity-
Install fence framepcspcs-
Install bespoke fence framepcspcs-
Install mesh fencing up to 1.4 mlm€2.50 / lmlmenter quantity-
Install mesh fencing up to 1.8 mlm€2.70 / lmlmenter quantity-
Install mesh fencing over 3.0 mlm€3.70 / lmlmenter quantity-
Blockwork corner bondingpcs€1.00 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What mesh panel fencing is and when it suits

Installing mesh fence panels means setting posts in the ground and fixing rigid welded steel panels to them. The result is a straight, solid fence that does not sag like chain link and needs little maintenance. It is most often installed on new builds, when replacing old chain link or wire fencing, or to separate a garden from a road or a neighbouring property. For an overview of other fence types and related work, see the fencing section.

Mesh panel fencing suits places where a see-through but rigid boundary is wanted that lasts for years without re-tensioning or repairs. It does not block the view. For privacy, the panels can be fitted with privacy slats or strips, or planted with climbers. Alternatively, a solid option such as a concrete fence up to 1.8 m or a concrete panel fence up to 2.1 m may be a better choice. Privacy slats make the fence catch far more wind, so mention them when ordering. Post size and footing size both depend on it.

Planning, boundaries and underground services: what to sort out before digging

The first question is not technical but legal: where exactly is the property boundary? If in doubt, check the title plan and, where necessary, have the boundary set out by a land surveyor. A fence built a few centimetres onto a neighbour's land is a common cause of disputes, and moving it takes a lot of work.

Whether a fence needs planning permission depends on factors such as its height, its location and whether it is next to a road or footpath. Further restrictions may apply to listed buildings, conservation areas or where planning conditions or covenants limit boundary treatments. Do not assume the fence will be fine. Check in advance with the local planning authority, including any local requirements for fence height and appearance. The Planning Portal is a useful first check: many minor works to houses are permitted development, but residential permitted development rights only apply to houses, so flats, listed buildings and conservation areas have stricter rules, and Article 4 Directions can remove these rights in some areas.

Before digging, find out whether underground services run along the boundary: gas, electricity, water or telecoms. Request service plans from the utility companies and, where needed, have the cables and pipes located on site with a cable detector. Digging blind near a gas pipe or electric cable is dangerous. If you smell gas or damage a gas pipe, call the free 24-hour National Gas Emergency Service on 0800 111 999 (0800 002 001 in Northern Ireland). For boundary fences, it is also sensible to agree with the neighbour which side the footings will be on and who will maintain the fence.

It also pays to decide the following in advance, because the material order and post positions depend on them:

  • fence height and whether it stays the same along the whole length,
  • panel type, meaning V-mesh (3D) or twin wire (2D), and colour,
  • position of gates and their width, so a car or lawnmower can get through,
  • gravel boards or not, because they go in before the panels,
  • post fixing, meaning concrete, bolt-down base plates on a wall or ground screws,
  • privacy slats now or later, because of wind load,
  • whether the fence will later carry a gate motor, doorbell or lighting, which needs a cable duct laid in advance. Electrical connections must only be made by a qualified electrician. A new circuit is notifiable under Part P in England and Wales, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start.

Panels, posts and fixings: what to choose and when

  • V-mesh (3D) panels have V-shaped folds that stiffen them. They are the usual choice for houses and gardens.
  • Twin wire (2D) panels are flat, with double horizontal wires. They are stiffer and suit places where the fence has more of a security role, such as along a road or around commercial premises.
  • Finish: galvanising alone protects against rust, while galvanising combined with powder coating lasts longer and looks more uniform.
  • Posts should come from the same system as the panels and have the same finish. Stronger sections are used at gates and corners.
  • Concrete gravel boards close the gap at ground level, stop dogs digging under and make mowing easier.
  • Ground screws or bolt-down base plates are an alternative to concreting. Base plates suit an existing wall, ground screws are better for lower and less loaded fences.

When fixing to an existing wall, check that the wall is sound and not cracked. A bare mesh panel lets wind through and puts relatively little load on the posts. Once privacy slats are woven in, however, the fence acts like a sail and the wind pushes on the whole surface. A weak or hollow wall under a base plate can then break away, and ground screws can work loose. The manufacturer states whether the system can take privacy slats.

How to install mesh panel fencing step by step

  1. Setting out the line: the fence line is marked with pegs and a tight string line. Start at the corners and at the gates, because these points are fixed and everything else is aligned to them.
  2. Post spacing: spacing is not guessed but set according to the panel width and the manufacturer's fixing system. A standard panel is about 2.5 m wide, so the posts must sit exactly at that spacing.
  3. Digging holes: a hole is dug or augered for each post. For low fences, holes are sometimes only 60 to 80 cm deep, but it is worth following the manufacturer's recommended depth and going below the depth that frost reaches locally, so frost does not lift the posts. For taller fences, corner posts, gate posts and soft ground, holes are dug deeper and wider. A little gravel is often put in the bottom.
  4. Setting the end posts: corner and end posts go in first. Each post is set, plumbed with a spirit level in both directions and concreted in.
  5. Setting the remaining posts: a string line is run between the end posts at the height of their tops and the remaining posts are set to it, so they are in line and at the same height.
  6. Letting the concrete set: the posts are not loaded until the concrete has set enough for the panels to be fixed. This usually takes one to two days, according to the concrete manufacturer's data. This is not full strength, which concrete gains gradually over several weeks, so the posts must not be levered or leaned on in the first days. Large gate posts with bigger footings need longer before a gate leaf is hung and used. Experienced installers sometimes fit the panels while setting the posts and hold their position with temporary braces or jigs.
  7. Gravel boards: if part of the fence, they are fitted into the brackets at ground level before the panels.
  8. Fixing the panels: panels are fixed to the posts with clips, clamps or bolted fixings from the same system. Work continuously from one end to the other so errors do not add up.
  9. Cutting the last panel: if the length does not work out in whole panels, the last one is cut down and the cut is treated with a protective coating.
  10. Tightening and checking: the line is checked along its full length and all fixings are tightened. Overtightening can damage the zinc or powder coating, which later leads to rust.

What affects the cost of panel fencing installation

The guide labour price is €85.00 per panel. When comparing quotes, ask what exactly each panel includes: only fixing the panel to existing posts, or also digging, setting and concreting the post, the concrete itself and taking away the spoil. The difference between such quotes is often large.

The price per panel goes up with:

  • slope: rigid panels are stepped and each section is levelled. The work is slower and on steep ground can cost noticeably more than on the flat,
  • ground conditions: stony ground, tree roots or old concrete in the way slow down digging and sometimes need a breaker,
  • fence height: a taller panel is heavier, needs a deeper footing and two people to fit it,
  • privacy slats: the fence needs stronger posts and bigger footings, and if the installer weaves in the slats, that is extra work,
  • removal and disposal of the old fence, which is usually charged separately,
  • complexity: many corners, changes of direction and short runs where panels must be cut and the cuts treated,
  • gates: they need stronger posts, bigger footings and more accurate measuring,
  • access: where machinery cannot reach the fence line, concrete and materials have to be carried by hand,
  • fixing method: base plates on a wall or ground screws involve a different method and amount of work than concreting.

The cheapest situation is level ground, softer stone-free soil, good access and no old fence to remove.

Site preparation: what speeds the job up and what holds it back

A lot of time is saved by preparation that is down to the customer:

  • the boundary is agreed and any surveyor's marks are visible, not overgrown or buried,
  • underground services are located and marked on the ground,
  • the fence line is cleared of shrubs, self-seeded saplings, stones and stored materials,
  • materials are delivered complete and from one system, including clips and post caps,
  • water for mixing concrete and a power supply for tools are available on site,
  • access to the neighbour's side has been agreed if work is needed there,
  • it is clear where the van can park and where the excavated soil can go.

Frost and prolonged rain, on the other hand, slow the work down. Frozen ground is hard to dig and concrete does not cure properly in freezing conditions. In waterlogged soil the posts are harder to align. Changing the gate position or fence height after the posts have been concreted also adds time.

Common mistakes and how they show up later

Posts set "roughly". If the spacing does not match the panel width, the panel cannot be fixed or has to be forced and bent. A bent panel is under stress, the clips work loose and the coating at the bend can crack.

Shallow or weak footings. The fence looks fine, but after the first winter or a strong wind it starts to lean. The repair means digging out and re-concreting the post.

Privacy slats on a fence not designed for them. In the first gale the posts work loose or a whole section leans.

Loading posts before the concrete has set. The posts move and waves appear in the line that cannot be straightened without taking it apart.

Untreated cuts. A cut panel has bare steel at the cut. Without a protective coating it starts to rust there and rust runs down the surface.

Mixing parts from different systems. The clips then do not grip properly and the panels shake and rattle in the wind.

Concrete around the post without a fall. Water sits at the base of the post, freezes there in winter and the coating is damaged sooner. The first rust then appears at ground level.

Overtightened fixings. The zinc or powder coating under the clip is damaged and rust starts underneath, where it stays hidden for a long time.

Fence off the boundary line. This only comes to light in a dispute with the neighbour or when selling, and the solution is often moving the whole fence.

DIY mesh panel fencing: when to take it on

On level ground and at a standard fence height, the installation can be done as a DIY job following the steps above. Sloping ground, an automated gate or a tall security fence are better left to a fencing contractor. Gate motors and any electrical connections must be handled by a qualified electrician.

For a DIY installation, it helps to:

  1. Have a second person, a spirit level, a string line and a manual or petrol post hole auger, which can be hired.
  2. Have the boundary, the planning question and the service locations sorted before any digging starts.
  3. Measure the spacings along the string line once more before digging, as a measuring error is very hard to correct after concreting.
  4. Mix concrete in smaller batches so each post can be aligned before the concrete starts to stiffen.
  5. Start fixing the panels the day after concreting, not straight away.
  6. Wear safety glasses and gloves when cutting panels, because cut wires are sharp.

How to check the finished fence at handover

  • the posts are plumb and their tops are in line,
  • the panels are in line, not bowed and at the same height above ground,
  • the fence does not move when pushed gently and the panels do not rattle,
  • all clips and bolts are tight and from one system,
  • the coating is not scratched and the cuts are treated,
  • the concrete around the posts is finished smooth and sheds water away from them,
  • post caps are fitted so water cannot get in,
  • the gravel boards sit in their brackets and meet without large gaps,
  • the fence follows the agreed line and the property boundary is respected,
  • gates open easily and do not catch,
  • the area is tidy and concrete waste and offcuts have been taken away, if agreed. Before you hand over old fencing, spoil or a skip load, check that the carrier is registered with the Environment Agency and ask for a waste transfer note.

Frequently asked questions

The guide price for this work is €85.00 per panel. The final figure depends on whether it includes setting and concreting the posts, and on the slope, ground conditions, fence height, access and whether an old fence has to be removed.

Related work

Price the whole project, not just one job

Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.