Building work price list: Bespoke Fence Frame Installation
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Fencing cost | ||||
| Install bespoke fence frame | pcs | €69.00 / pcs | pcs | enter quantity- |
| Laying concrete fence blocks | pcs | €4.00 / pcs | pcs | enter quantity- |
| Building fence piers | lm | €22.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 1.8 m | lm | €20.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.1 m | lm | €23.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.4 m | lm | €24.00 / lm | lm | enter quantity- |
| Fencing with DT 12/15 blocks | m² | m² | - | |
| Fencing with DT 20/25 blocks | m² | m² | - | |
| Remove old fencing | lm | €8.80 / lm | lm | enter quantity- |
| Install fence post up to 2.4 m | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install fence post up to 2.7 m | pcs | €28.00 / pcs | pcs | enter quantity- |
| Install fence post up to 3.8 m | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install fence strut up to 2.7 m | pcs | €1.70 / pcs | pcs | enter quantity- |
| Install barbed wire extension arm | pcs | €1.40 / pcs | pcs | enter quantity- |
| Tension straining wire | lm | €0.50 / lm | lm | enter quantity- |
| Tension barbed wire | lm | €0.75 / lm | lm | enter quantity- |
| Install fence frame | pcs | pcs | - | |
| Install fence panels | pcs | pcs | - | |
| Install mesh fencing up to 1.4 m | lm | €2.50 / lm | lm | enter quantity- |
| Install mesh fencing up to 1.8 m | lm | €2.70 / lm | lm | enter quantity- |
| Install mesh fencing over 3.0 m | lm | €3.70 / lm | lm | enter quantity- |
| Blockwork corner bonding | pcs | €1.00 / pcs | pcs | enter quantity- |
What a bespoke fence frame is and what installation includes
A bespoke fence frame is a made-to-measure fence panel, not one chosen from a catalogue. It is used where standard modular panels do not fit. The boundary may have angles, the ground may fall away, the posts may be unevenly spaced, or the fence may need to match the architecture of the house. Installation covers fixing the frame between the posts, levelling it, adjusting it on site and preparing it for the infill. For an overview of fence types and related jobs, see the fencing section.
The frame is the load-bearing skeleton of the panel. It is the perimeter section into which mesh, a solid panel or slats are later fitted. This item covers fixing the frame only. Posts, concreting them in and the infill are usually priced separately in quotes. Check exactly what the installer includes in the price.
When a made-to-measure fence is worth it instead of a standard system
System fences come in fixed panel widths and heights. They work well on level, regular plots. Problems start when the boundary does not run straight or the ground drops noticeably over a few metres. Triangular gaps appear under the fence, panels have to be cut to force a fit, and the result looks makeshift.
A made-to-measure frame makes sense mainly in these situations:
- the plot has an irregular shape or an angled boundary,
- the fence runs up a slope or over uneven ground,
- existing posts or low walls are spaced at different intervals,
- you want to combine a metal frame with timber, panels or concrete elements,
- the fence should match the house, for example with concealed joints or minimalist lines.
The advantage is that you decide the height, panel width, infill type and fixing method. A frame that fits the posts exactly carries load evenly, and its joints do not work loose as easily as parts that had to be forced into place. If you prefer a fully concrete solution, compare it with installing concrete fencing up to 1.8 m.
What to decide before the frames are made
Bespoke frames are made to a site survey. If something changes after fabrication, the frame has to be altered or remade. Be clear on the following points:
- Boundary line: exactly where the fence stands. With disputed or angled boundaries, it is safer to have a land surveyor set out the line than to move the fence later.
- Permission and agreement with the neighbour: whether your fence needs planning permission depends mainly on its height and position, for example next to a road. Check the Planning Portal or your local planning authority before you start: flats, listed buildings and conservation areas have stricter rules, and permitted development rights can be removed in certain areas by Article 4 Directions. For a fence on the boundary, agree access during installation with your neighbour in advance.
- Fence height and ground clearance: the gap under the fence decides whether you can mow comfortably and whether a dog can crawl underneath. Agree it precisely in centimetres.
- Dealing with the slope: stepped or raked, see the slope section below. The decision applies to the whole run, not panel by panel.
- Material and finish: steel or aluminium, galvanising, powder coating and colour. Note the exact colour code for future touch-ups.
- Infill: mesh, panels, slats or a combination. The frame is designed around the infill, not the other way round.
- Fixing method: bolted, clamped brackets or welded. A bolted frame is easier to replace in future, a welded one is stronger but harder to repair.
- Gates: if posts or adjacent panels need to suit a driveway gate or side gate, this must be known at the survey stage.
How installation works step by step
With a bespoke frame each step is adapted to the specific plot, but the sequence is always the same:
- Survey. The actual post spacings, level differences and angles are measured, working from the set-out boundary.
- Post check. Posts must be plumb, at the correct height and set in concrete that has cured sufficiently. Frames are usually fitted only after several days. The concrete mix manufacturer states the exact time.
- Fabrication or adjustment of the frame. Frames are made to the survey. Some details are cut and welded on site.
- Setting out the height. Before fixing, a string line or laser level is used so that the top of the fence runs in one line or at a consistent gradient.
- Fixing and levelling. The frame is fixed to the posts with bolts, clamps or welds. Level, height and alignment with adjacent panels are checked throughout.
- Final tightening. Only when all panels in the run are in line are the joints fully tightened or welded up.
- Treating the joints. Every cut or weld must be cleaned and treated. Galvanised steel gets zinc-rich paint, a powder-coated frame gets touch-up paint in the same colour.
- Preparing for the infill. The infill must fit the frame without stress. If it is forced in, the frame will distort over time.
- Clean-up. Offcuts, weld spatter and metal dust are removed, as they would leave rust stains on paving or render.
Materials, finishes and infills
Most frames are made of steel. It is strong and easy to cut and weld, so raked or angled shapes are straightforward to produce. Unprotected, however, it rusts, so the finish matters: hot-dip galvanising, powder coating or both. A properly finished steel frame lasts many years with little maintenance.
Aluminium is lighter and naturally corrosion resistant. It suits modern slatted or panel fences and situations where posts should not carry a heavy structure. It can be cut and drilled on site, but welding and restoring the finish there are difficult. The survey for aluminium must therefore be very accurate.
The infill determines both appearance and privacy. Metal mesh or panels, timber or composite slats, or a combination are used. With tall, solid infills, think about wind: a solid surface acts like a sail, and the posts and their footings must be designed for it.
Timber changes size with moisture. Timber slats in a metal frame need a small clearance, otherwise swollen timber jams and distorts the frame.
A bespoke fence on a slope: stepped or raked
There are two approaches on a slope. With stepped panels the frames stay horizontal and each panel sits slightly lower than the one before. It looks neat, but stepped gaps form under the panels. These are filled with a dwarf wall or gravel boards.
With raked panels that follow the ground, the frames are made as parallelograms matching the slope. The fence line is softer and the gap underneath stays even. Fabrication is more demanding, because each panel may have a different angle.
Even the most accurate frame is only as good as the posts it hangs on. On a slope, water runs past the footings, and on unstable slopes the soil can creep slowly. Footings must therefore go below the depth affected by frost. That depth depends on the location and the ground, so follow local practice and the post manufacturer's guidance. For heavier fences or unstable ground, deeper footings or a continuous strip foundation are used.
Price of bespoke fence frame installation and what affects it
The guide labour price is €69.00 per piece. It covers fitting one frame, meaning one fence panel. The final price per piece depends mainly on:
- Panel shape: a rectangle is simplest. A raked panel on a slope or an angled panel at a change in boundary direction needs more measuring and adjustment, which noticeably raises the cost.
- Ground slope and number of level changes: when following a slope, each panel may have a different angle. The more changes in gradient, the more work on each piece.
- Post accuracy: posts that lean or are unevenly spaced mean adjusting every frame individually. This is often the biggest difference between a cheap and an expensive installation.
- Welding and treating joints on site: a bolted frame is quicker. Every site weld adds time for welding, cleaning and applying protection.
- Access to the fence line: a narrow strip next to the neighbour, a slope with no vehicle access or dense shrubs slow the work.
- Weight of frames and infill: heavy parts need more people or lifting equipment.
- Fence height: tall panels are fitted from a ladder or scaffold, and one person can hardly level the frame alone.
- Material: aluminium is easier to fit, but if a frame is so far out that it would need welding, it goes back to the workshop.
- Number of pieces: with one or two panels, travel and preparation make up a larger share of the price. Over a longer run these costs are spread.
Good preparation saves the most. If the posts are set exactly to the design, the frames can be made in the workshop in advance and simply fixed on site.
What to prepare for a quick installation
- the posts are finished well in advance and the concrete has had time to cure,
- any old fence has been taken down - see old fencing removal - and the strip along the fence line is mown and clear of tools, timber, compost bins or parked cars,
- a power socket is within reach for tools and the welder, or it is agreed in advance that the installer brings a generator,
- the neighbour knows the date and agrees to access on their side if needed,
- it is agreed where frames and infill will be unloaded and where waste will go. Before you hand over offcuts or the old fence, check that the carrier is registered with the Environment Agency and ask for a waste transfer note,
- the colour and infill are chosen before the survey, not during installation.
Installation takes longer in rain and frost, when welds cannot be treated properly and touch-up paint cannot be applied, and with last-minute changes that require a frame to be remade.
Common mistakes and how they show later
Frames made from the drawing, not from the posts as actually set. They do not fit on site and must be cut and welded. Gaps become uneven and there are more spots that need treating.
Fitting onto fresh concrete. Posts move when the fixings are tightened. The fence is then not plumb and the joints are under stress from the start.
Shallow footings. Frost heave lifts the soil and after the first winter the fence leans or panels pull apart.
Untreated welds and cuts on galvanised steel. They start to rust within a few years. Rust spreads under the coating and run-off leaves stains on the dwarf wall.
Mixing stepped and raked panels with no clear logic. The fence looks disorganised, and this can only be put right by replacing frames.
Solid infill on a tall fence without checking wind load. In strong winds the posts lean, joints loosen and in the worst case a panel is torn out.
Infill forced into the frame. The frame distorts over time and the infill bows or cracks.
In practice, problems often do not show straight away. The fence looks fine, but after a year loose joints or rust spots at the welds appear.
How to check the finished fence at handover
Look along the whole fence line from a distance, as unevenness shows best that way. Then go panel by panel:
- all frames are level or at a consistent gradient, with no visible steps out of line,
- the gaps between frame and posts are equal,
- the gap under the fence is even and matches what was agreed,
- posts are plumb and do not move when pushed,
- bolted joints are tight and welds are continuous,
- all cuts and welds are treated with zinc-rich paint or touch-up paint,
- the coating is not scratched by tools and the touch-ups match the rest of the fence,
- the infill sits in the frame without stress and does not bend it,
- the area is clean, with no offcuts or weld spatter,
- the fence stands on your land according to the set-out boundary,
- you have a written guarantee and maintenance instructions for the finish.
DIY steps for a bolted frame
DIY fitting only makes sense for rectangular bolted frames on finished, accurately set posts. Heavier frames need a helper. Concrete systems are a different job, for example installing a concrete panel fence up to 2.1 m high.
- Check that the concrete around the posts has cured according to the mix manufacturer's data.
- Measure the post spacing at the top and bottom and compare it with the frame size.
- Run a string line at the height of the top of the fence along the whole run.
- Support the frame on timber wedges at the agreed ground clearance.
- Offer up the frame, level it with a spirit level and fix it with the supplied fixings without fully tightening.
- Fit the other panels the same way, check the line against the string, then tighten the fixings and remove the wedges.
- Treat any damaged areas of the finish with zinc-rich paint or touch-up paint and fit the infill without stress.
Wear safety glasses and gloves when drilling and cutting metal.
Frequently asked questions
The guide price is €69.00 per piece. A rectangular panel on accurately set posts costs less. Raked and angled panels, on-site welding, heavy infill and poor access increase the price.
It depends on the height of the fence, its position and whether it is next to a road or footpath. Check with your local planning authority before work starts what your fence requires. For a fence on the boundary, it is also worth agreeing the details with your neighbour.
Yes, if the posts are deep enough, the footings suit the ground and the frames are made exactly to the gradient. On a slope, pay more attention to drainage around the footings so that water does not wash out the foundations.
Steel is stronger and easier to adjust on site, but it needs good corrosion protection. Aluminium is lighter and almost maintenance free, but it needs an accurate survey, because welding and repairing the finish on site are difficult.
The time depends mainly on the number of panels and how much welding is done on site. Bolted frames on accurate posts go up quickly, and a shorter run is usually done within a few days. Slopes, angled boundaries and welding make each panel take longer. Add the time for workshop fabrication and for the concrete around the posts to cure.
For rectangular bolted panels, yes - the steps are described above. Welding, raked panels, heavy parts and tall fences with solid infill are a job for a professional, because errors in alignment and untreated welds are hard to fix later.
Inspect the fence from time to time, especially the welds and joints. Treat small damage to the coating or galvanising promptly with touch-up paint before rust spreads. After winter, check that the posts have not moved and the fixings are tight.
Related work
How old fence removal works, including posts and footings, what makes the job harder, what to check before you start and how to inspect the result.
How a concrete panel fence up to 1.8 m is installed, what foundations it needs, what to check about permission and how to inspect the finished fence.
How a concrete panel fence up to 2.1 m is installed, what footings and posts it needs, how it differs from lower and taller fences and what to check.
How a 2.4 m concrete panel fence is built: footings, posts, wind load, slopes, preparation and handover. How it differs from 1.8 m and 2.1 m fences.
How a fence of 12 and 15 cm concrete shuttering blocks is built, when thin blocks are enough, materials, typical mistakes and how to check the work.
How a fence of DT 20 and DT 25 formwork blocks is built, which block width to choose, what foundations it needs and what to check at handover.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.