Building work price list: Bonding Wall Corners
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Fencing cost | ||||
| Blockwork corner bonding | pcs | €1.00 / pcs | pcs | enter quantity- |
| Laying concrete fence blocks | pcs | €4.00 / pcs | pcs | enter quantity- |
| Building fence piers | lm | €22.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 1.8 m | lm | €20.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.1 m | lm | €23.00 / lm | lm | enter quantity- |
| Install concrete fencing up to 2.4 m | lm | €24.00 / lm | lm | enter quantity- |
| Fencing with DT 12/15 blocks | m² | m² | - | |
| Fencing with DT 20/25 blocks | m² | m² | - | |
| Remove old fencing | lm | €8.80 / lm | lm | enter quantity- |
| Install fence post up to 2.4 m | pcs | €25.00 / pcs | pcs | enter quantity- |
| Install fence post up to 2.7 m | pcs | €28.00 / pcs | pcs | enter quantity- |
| Install fence post up to 3.8 m | pcs | €35.00 / pcs | pcs | enter quantity- |
| Install fence strut up to 2.7 m | pcs | €1.70 / pcs | pcs | enter quantity- |
| Install barbed wire extension arm | pcs | €1.40 / pcs | pcs | enter quantity- |
| Tension straining wire | lm | €0.50 / lm | lm | enter quantity- |
| Tension barbed wire | lm | €0.75 / lm | lm | enter quantity- |
| Install fence frame | pcs | pcs | - | |
| Install bespoke fence frame | pcs | pcs | - | |
| Install fence panels | pcs | pcs | - | |
| Install mesh fencing up to 1.4 m | lm | €2.50 / lm | lm | enter quantity- |
| Install mesh fencing up to 1.8 m | lm | €2.70 / lm | lm | enter quantity- |
| Install mesh fencing over 3.0 m | lm | €3.70 / lm | lm | enter quantity- |
What bonding a corner means and when it is needed
Where a wall changes direction, the bricklayer does not finish one run and simply butt the next run against it. The corner unit is laid from one side in one course and from the other side in the next, so each course covers the joint in the course below. The same principle applies to house walls, garages and garden walls. This article deals with boundary walls and fences, part of the wider fencing work on a property. A bonded corner is needed on every masonry fence, dwarf wall or plinth that changes direction. Typical places are the corners of the plot, the area next to a gate and junctions with piers.
Corner bonding is priced per piece, so each corner is charged separately. Straight wall runs, footings and the fence infill panels are normally separate items. When planning, count how many changes of direction the fence really has. Apart from the plot corners, these include returns at the driveway, at a gate or pedestrian gate and where the fence steps around a tree or an inspection chamber. If a precast system is preferred to masonry, compare it with concrete fencing up to 1.8 m or a concrete panel fence up to 2.1 m high.
Why the corner of a fence wall is a weak point
A boundary wall has no floor or roof to tie it together. On a straight run it can lean and move more easily with wind, frost and ground settlement. A corner acts as a buttress: the two walls meet at a right angle and brace each other. This only works when they are properly bonded.
If the second run is just butted against the first, a continuous vertical joint runs from the footing to the top. Each part then moves on its own. In practice, a crack often appears in such a corner after one or two winters and one run starts to lean slightly away. A bonded corner prevents this because the load is spread in both directions.
The corner is also the reference point for the whole fence. If it is not a true right angle or not plumb, the error carries through to every following course and to the fitting of panels and gates.
What to decide before any bricks are laid
More is decided at a corner than it first appears. Later changes are not possible without demolition.
- Exact position of the corner. A corner on the boundary must stand in the right place. If the boundary is uncertain, have it set out by a land surveyor and agree it with the neighbour before the footing is dug.
- Angle. A right angle is the simplest. If the plot requires a different angle, this must be known in advance because it affects the choice of material and the labour involved.
- Material. Standard bricks, hollow concrete blocks filled with concrete, or walling and split-face blocks with system corner units. The choice determines the appearance, the method and how much cutting the corner will need.
- Height and purpose of the wall. A normal bond is enough for low plinths. For taller walls, walls on a slope or retaining walls that hold back soil, a structural engineer should specify the reinforcement and bond.
- Pier or gate at the corner. If a gate pier or fixings for infill panels are to sit at or near the corner, fix their position in advance so reinforcement or anchors can be set in good time.
- Movement joints. A long wall needs movement joints. They should be planned away from the corners.
- Planning. Before building, check the Planning Portal or ask the local planning authority whether planning permission is needed. The rules depend on the height and position of the wall, and lower limits generally apply next to a road. Some minor works are classed as permitted development, but these rights can be removed in certain areas by Article 4 Directions, and listed buildings and conservation areas have stricter rules.
How a fence corner is bonded step by step
The method varies slightly with the material, but the principle stays the same: each course at the corner is laid the opposite way to the one below.
- Footing: cast a strip footing that runs continuously through the corner. The depth follows the design and ground conditions, and must be below the level affected by frost, deeper on shrinkable clay.
- Vertical reinforcement: with hollow concrete blocks, set vertical reinforcing bars into the footing at the corner and at regular centres along the wall.
- Damp-proof course: on the cured footing, lay a horizontal damp-proof course (DPC) or other damp protection to the design, so ground moisture does not rise into the masonry. The DPC must run continuously through the corner without a gap.
- Setting out: set out the corner with string lines and check the right angle with a builder's square or the 3-4-5 method (triangle sides in the ratio 3 : 4 : 5).
- First course: lay the first course dead level, always starting with the corner unit.
- Alternating courses: in the second course turn the corner unit through 90 degrees so it covers the joint below. The other units are usually offset by half their length, and with bricks by at least a quarter of a brick.
- Corner units: cut them as needed or use the manufacturer's system corner and half units.
- Horizontal reinforcement: with hollow blocks, also lay horizontal reinforcement and bend it round the corner so it continues from one run into the other.
- Filling: with hollow blocks, fill the cores with concrete every few courses and compact it, filling the corner core over the full height.
- Ongoing checks: after each course, check the corner for plumb with a spirit level and the line with a string stretched between corners.
Bricklayers usually build the corner several courses higher than the rest of the wall first, known as racking back, and then fill in between corners to a line. The corner then serves as the guide for both height and line.
Bricks, hollow concrete blocks or walling blocks
Standard bricks are bonded at the corner using stretchers and headers. A stretcher is a brick laid along the wall, a header is laid across it. They alternate at the corner so that perpend joints never line up above each other. This bond needs accurate cutting and a skilled hand, and the result is a neat, strong corner.
Hollow concrete blocks (shuttering or formwork blocks) are hollow units that are laid and filled with concrete as the wall rises. Here the bond comes from a combination of alternating units and reinforcement. The corner core should be filled with concrete over the full height so it works as a hidden column. They are laid dry or on mortar, according to the manufacturer's instructions.
Walling and split-face blocks often come with their own corner or pier units. These make the job much easier, but the courses must still alternate and the cores must be filled if the manufacturer requires it.
What affects the price of bonding a corner
The guide labour price is €1.00 per corner. The actual price of one corner can differ depending on how demanding it is:
- Material: a corner in hollow or walling blocks with system corner units is quickest because almost no cutting is needed. Units with accurate dimensions are also faster. A traditional brick bond with stretchers and headers takes more work, as each course must be thought through and some units cut. With facing masonry that stays visible, extra time goes into clean pointing.
- Corner angle: a right angle is standard. An acute or obtuse corner means cutting almost every corner unit and raises the price considerably, often to the level of bespoke work.
- Wall height: every course adds work at the corner. A taller wall also needs more careful plumb checks and, above a certain height, scaffolding or temporary props.
- Reinforcement and filling: bending horizontal bars round the corner, setting vertical bars and filling the cores in stages add both labour and material.
- Ground: on a slope the wall steps down and the corner may fall right at a change in height. Such a corner takes more work than one on level ground.
- Joining an old wall: tying into existing masonry means cutting out units in every other course. If the old corner is unbonded, it often has to be taken down and rebuilt, which adds removal of the old fencing and disposal of the rubble to the price. As a householder you have a duty of care for this waste, so check that the carrier is registered with the Environment Agency and ask for a waste transfer note.
- Access: a narrow strip between the neighbour's fence and the garden, or a spot a delivery vehicle cannot reach, extends the work through carrying by hand.
When comparing quotes, ask exactly what the corner item includes. Some contractors include only laying the corner itself, others also reinforcement, filling or cutting. Footings and straight wall runs are always priced separately.
What speeds the work up and what slows it down
A lot of time at a corner is lost waiting and sorting out things that should have been ready beforehand. The work goes faster when:
- the plot boundaries are set out and the exact position of the wall is agreed with the neighbour,
- the strip footing is complete, runs through the corner without a break and the concrete has cured,
- a drawing or at least a sketch is available showing corner angles, wall height and the positions of the gate and piers,
- all material is on site at once, including system corner and half units and the DPC, ideally blocks from one production batch so that sizes and colour match,
- there is water on site for mixing mortar and concrete and power for the mixer and saw,
- material can be stacked close to the work and there is clear access to the corner.
Weather, on the other hand, slows the work. Bricklaying and concreting are not recommended in frost or at temperatures below about 5 °C, in rain, or in very hot weather when mortar dries too quickly. Moving the gate or a pier during the work also causes delays, because reinforcement and anchors cannot be set properly afterwards.
Typical mistakes at fence corners and how they show
- Butted corner with no bond. The two runs only stand side by side and sooner or later separate along a vertical crack.
- Broken footing. If the footings of two runs only touch, each settles differently and the corner cracks.
- Missing or broken DPC. Ground moisture rises into the masonry, the lower courses stay damp, white efflorescence appears and frost can make them crumble.
- No reinforcement at the corner. With hollow blocks the corner core is a structural point. Without reinforcement it loses its purpose and the corner can move under wind or soil pressure.
- Poorly filled cores. Concrete poured in one go over a great height, or mixed too stiff, does not fill the cores completely and leaves voids at the corner. They are not visible from outside, but the corner is weaker and water can get into the cores and split the blocks in frost.
- Movement joint at the corner. A long wall needs movement joints, but not directly at a corner, otherwise the corner loses its bracing effect.
- Inaccurate right angle. The error only shows when panels and gates do not fit, or when looking along the fence.
- Checking only at the end. A few millimetres out in each course becomes a visibly crooked corner at the top of the wall.
- Loading too early. Hanging a gate or backfilling soil against an uncured corner can push it out of line or crack it.
DIY guide: bonding the corner of a low garden wall
A low dwarf wall or plinth up to knee height can be built as a DIY job, given enough time. For taller walls, retaining walls and walls next to a road, it is better to use a bricklayer. Even for a DIY wall, check with the local planning authority before digging whether permission is needed.
- Confirm the plot boundaries and set out the corner with two string lines.
- Check the right angle with the 3-4-5 method.
- Clean the top of the footing and lay the DPC so it runs through the corner without a break.
- Dampen the base if the mortar used requires it.
- Bed the first corner unit in mortar and level it in both directions with a spirit level.
- Complete the first course in both directions to the line.
- In the second course, turn the corner unit through 90 degrees and continue with staggered joints.
- After each course, check the corner for plumb and both runs for line.
- With hollow blocks, fill with concrete every few courses and compact it with a rod.
- Strike off excess mortar before it sets so it does not stain the face.
- Protect the finished corner from rain, frost and direct sun until the mortar and concrete have hardened.
How to check the finished corner
Before accepting the work, look at the corner both close up and from a distance. Focus on these points:
- perpend joints do not line up above each other in adjacent courses,
- corner units alternate from one side to the other course by course,
- the corner is plumb over its full height, checked with a spirit level or plumb line,
- the angle between the runs matches the drawing, usually a right angle,
- joints are of roughly even thickness and fully filled,
- the edge of the DPC is visible below the first course and unbroken at the corner,
- with hollow blocks, there is reinforcement at the corner and the cores are filled, best checked during the work while the corner is still open,
- there are no cracks or loose units at the corner,
- the top of the wall is level at the corner and lines up with both runs,
- the face is not stained with mortar or concrete.
Frequently asked questions
The guide price is €1.00 per corner. The final price depends on the material, wall height, corner angle, reinforcement and filling, the ground and access. Tying into an old wall or a corner at an angle other than 90 degrees costs more.
Yes. Even a low wall moves with frost and ground settlement. An unbonded corner separates over time and the crack widens with each winter.
Reinforcement supports the bond but does not replace it. A strong corner comes from alternating units, a continuous footing and, with hollow blocks, concrete filling.
Yes, but it is more demanding. Units must be cut out of the old corner in every other course so the new wall can key in. If the old wall is cracked or has no footing, it is usually more sensible to rebuild the corner completely.
It depends on the particular wall, mainly its height and position, with lower limits next to a road. The local planning authority can confirm whether permission is needed and what to submit.
Concrete and mortar gain initial strength over the first few days, and concrete usually reaches full strength after about 28 days. It takes longer in cold weather, and the material manufacturer gives the exact figures. Until the material has cured, do not hang anything on the wall, fit a heavy gate or backfill soil against it.
Yes, but every corner unit has to be cut and the bond adjusted in each course. The work is slower and needs more precision. With hollow blocks, care is also needed to keep the corner core continuous so it can be filled completely with concrete.
Related work
How old fence removal works, including posts and footings, what makes the job harder, what to check before you start and how to inspect the result.
How a concrete panel fence up to 1.8 m is installed, what foundations it needs, what to check about permission and how to inspect the finished fence.
How a concrete panel fence up to 2.1 m is installed, what footings and posts it needs, how it differs from lower and taller fences and what to check.
How a 2.4 m concrete panel fence is built: footings, posts, wind load, slopes, preparation and handover. How it differs from 1.8 m and 2.1 m fences.
How a fence of 12 and 15 cm concrete shuttering blocks is built, when thin blocks are enough, materials, typical mistakes and how to check the work.
How a fence of DT 20 and DT 25 formwork blocks is built, which block width to choose, what foundations it needs and what to check at handover.
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.