Building work price list: Cutting Holes in Tiles & Paving
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Wall and floor tiling cost | ||||
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Porcelain tiling over 60 cm | m² | €49.00 / m² | m² | enter quantity- |
| XL format wall/floor tiling 60×120 | m² | m² | - | |
| XXL format wall/floor tiling 120×260 | m² | m² | - | |
| Mosaic tiling | m² | m² | - | |
| Natural/artificial stone / clinker tiling | m² | €59.00 / m² | m² | enter quantity- |
| Split face stone cladding (fences, plinth) | m² | m² | - | |
| Decorative strip / Listello tiling | lm | €2.50 / lm | lm | enter quantity- |
| Diagonal floor tiling up to 600 mm | m² | €45.00 / m² | m² | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Silicone grouting | m² | €3.60 / m² | m² | enter quantity- |
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Microcement decorative coating 2-3 mm | m² | €80.00 / m² | m² | enter quantity- |
| Waterjet cutting 60×60 (mitred edge) | lm | €5.90 / lm | lm | enter quantity- |
| Waterjet cutting 120×120 (mitred edge) | lm | €7.90 / lm | lm | enter quantity- |
| Waterjet cutting - tile cut-out | lm | €10.50 / lm | lm | enter quantity- |
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
| Skirting from tiles | lm | €6.50 / lm | lm | enter quantity- |
| Core drilling holes in floor and porcelain tiles | pcs | €12.50 / pcs | pcs | enter quantity- |
Where holes in wall and floor tiles are needed
In a bathroom or kitchen, a tiler can rarely use only whole tiles. Pipes and tap tails come through the wall tiling, back boxes for sockets and switches sit in the wall, and the floor has a shower waste or floor gully. Each of these needs its own hole, so that it sits in the right place with a narrow, even gap around it. Cutting these holes is a normal part of tiling services and is usually priced separately from the tiling itself.
Holes are priced per piece. It is worth counting how many the room will need before tiling starts. A typical bathroom has more than most people expect: supply pipes for the basin, bath or shower, the WC, the washing machine connection, a socket, a switch, the waste and sometimes an access panel. Round holes in hard floor tiles are often listed as a separate item, core drilling holes in paving and porcelain tiles.
Cut-outs or core drilling: what is the difference
Cut-outs are used for square and irregular shapes: a notch in the corner of a tile, a cut around a WC pan, a linear shower drain, an access panel or a square back box. They are usually made with an angle grinder fitted with a diamond blade, and straight notches are often done with a combination of a tile cutter and a grinder.
Core drilling produces a round hole using a core bit, also called a tile hole saw. The edge is cleaner and the hole is perfectly round. It suits pipes, tap tails, round back boxes and wastes. For larger diameters, typically over 15 cm, the core bit is often combined with a grinder or a router.
The material also makes a big difference:
- ceramic wall tiles have a softer, porous body and are easier to drill. For small holes, cheaper tungsten carbide tile and glass bits are commonly used, and for larger holes a diamond or carbide core bit,
- porcelain tiles are very hard and almost non-absorbent, so they can only be worked with diamond tools and with cooling, otherwise the tool overheats and the tile may crack,
- natural stone and marble are brittle, so they are drilled slowly and steadily.
What to decide before tiling starts
Each hole is made to suit what will sit in the wall or floor. If that changes after the tiles are laid, the tile with the hole usually has to be replaced. Settle these points in advance:
- the exact position and height of the pipework for taps, basin, WC and washing machine, and whether it matches the chosen sanitaryware,
- which pipe roses, cover plates and faceplates will cover the holes, because their size determines the hole diameter,
- the type of floor drain, whether it is a point gully or a linear drain, and how the fall will run towards it,
- the tile layout, so that a hole does not end up right at the edge of a tile or on a grout joint, where the tile can easily crack. Sometimes moving the start of a row by a few centimetres is enough. This is planned together with the tiling and paving installation up to 60 cm or larger formats,
- the number of spare tiles, because with hard material or a complex cut-out a tile may break. Tiles from the same batch are hard to find later.
How the hole is made step by step
Most mistakes happen not during drilling but during measuring. A tiler therefore always starts by measuring.
- Measuring: the tiler measures the position of the hole from the last laid row and allows for the width of the grout joint.
- Marking: the point is transferred to the tile with a pencil or marker, for round holes often using a paper template or the pipe rose that will cover the hole.
- Supporting the tile: the tile is placed on a flat, slightly soft surface, such as a rubber mat or cardboard, and secured so it cannot move.
- Starting the core bit: the core bit is started at a slight angle so that it cuts a groove and does not skate across the glaze, then it is gradually brought upright. Alternatively, a guide jig holds the bit in place from the start.
- Drilling: drilling is done without hammer action, with light pressure and with water, which cools the bit and the tile and binds the dust. Core bits for drills run at low speed. Diamond core bits for angle grinders with an M14 thread are designed for the high speed of a grinder and, depending on the type, are cooled with water or have their own wax filling.
- Grinder cut-outs: shallow cuts are made along the outline first and the cut is deepened gradually. Internal corners are finished carefully so the tile does not snap at a weak point.
- Small holes: holes for screws and wall plugs are made with a thin tile bit, and in porcelain with a diamond bit. A piece of masking tape at the drilling point helps stop the bit slipping at the start.
- Finishing the edges: the edges are smoothed with a diamond file, a sanding sponge or fine abrasive paper.
- Dry fit: the tile is offered up without adhesive to check that the hole lines up. Only then is it fixed, following the BS 5385 code of practice, with the background prepared and an adhesive classified to BS EN 12004 chosen to suit the tile size and weight.
- Sealing the penetration: in a wet area a sealing collar is fitted over the pipe and bonded into the tanking under the tiles. Flexible sanitary silicone only fills the visible gap between the pipe and the tile and does not replace the tanking.
Price for cutting a hole in tiles and paving
The guide labour price is €12.00 per piece. This rate usually applies to a standard small-diameter hole, for example for a tap tail, pipe or back box, in an ordinary ceramic tile. More demanding holes are often charged with a surcharge or as a separate item. The price per piece depends mainly on:
- hardness and thickness of the material: thick porcelain takes much longer to drill than thin ceramic wall tiles and wears out expensive diamond tools faster. A hole in porcelain or stone is therefore noticeably more expensive than the basic rate,
- size and shape of the hole: a small round hole is quick, while a large or irregular cut-out needs more cuts and finishing. Shaped cut-outs around a WC or drain are often priced separately,
- position of the hole: a hole close to the edge or in the corner of a tile increases the risk of cracking and the tiler works more slowly,
- large-format tiles: they are heavy to handle and a ruined tile means a significant loss of material, so the work is slower and more careful, for example with XL wall and floor tiles 60×120,
- a hole in tiles that are already fixed: the tile cannot be clamped, water runs down the wall and the routes of water pipes and cables must be known. A hole drilled later is usually more expensive than the same hole made during tiling,
- number of identical holes: for a series, the tools are set up once and the work runs more smoothly, so the price per piece may drop for larger quantities.
When comparing quotes, ask which material and hole size the quoted price per piece covers, how holes in porcelain, large holes and shaped cut-outs are charged, and who bears the cost of a tile that cracks during drilling.
What to prepare so the tiler does not have to wait
A tiler works quickly when everything the holes are measured from is already on site. It helps if:
- the water, waste and electrical installations are finished, tested and the outlets fixed in their final position,
- the taps, pipe roses, cover plates and the drain or gully are on site, so the hole diameter can be checked directly against them,
- there are photos or a sketch of the pipe and cable routes in the walls before tiling, which is also useful for any holes drilled later,
- water and a socket are nearby, along with a safe place to cut and to deposit slurry,
- a few spare tiles are on site.
The work takes longer when outlet positions change during tiling, when sanitaryware is still being chosen and the tiler has to wait for dimensions, or when holes have to be drilled later into finished tiling in a fitted, lived-in bathroom.
Typical mistakes and how they show later
Wrong tools. A masonry bit or hammer action chips the glaze and is more likely to shatter porcelain than drill through it. Ceramic needs a tile bit or tile core bit, porcelain only diamond. A chipped edge later shows from under the pipe rose and lets water get behind it more easily.
Drilling dry. Without cooling, the core bit quickly overheats and blunts, and the tile may crack from the heat. If cooling is not possible, work in short bursts and let the tool cool down. An overheated tile may have a hairline crack that only appears over time.
Too much pressure. Pushing hard to go faster often breaks the tile just before the cut is finished. The tool should work at its own pace.
Poor measuring. A misplaced hole will not be covered by the rose and the tile has to be replaced. The position should therefore be checked twice before cutting. If the mistake is missed, the tap or cover plate sits crooked and a visible gap remains around it.
Wrong diameter. The hole should be slightly larger than the pipe to leave room for flexible sealant, but smaller than the rose or cover plate. A hole that is too tight will crack later when the pipe moves, and one that is too large will be left exposed.
No sealing collar. If a pipe penetration in a wet area is not sealed with a tanking collar and relies only on silicone, or if the tanking is damaged during drilling, water gets behind the tiles. This only shows months later as loose tiles, mould or a damp patch on the ceiling of the room or flat below.
Drilling blind into the wall. When adding holes to finished tiling, the routes of pipes and cables must be known, otherwise there is a risk of drilling through them.
How to check the finished work
When signing off the tiling, look at these points:
- the holes are in the right place and the outlets are not offset from the centre of the tap or back box,
- the edges are smooth, without cracks or chipped glaze,
- the gap around pipes is even and the rose or cover plate covers it completely,
- penetrations in wet areas have sealing collars bonded into the tanking, even though they are no longer visible under the tiles, and the visible joint is filled with flexible sanitary silicone,
- there are no hairline cracks running from a hole to the edge of a tile,
- at the floor gully or drain, the tiles meet it without a lip and fall towards the outlet,
- socket and switch back boxes sit flush with the tiles and the faceplate covers them,
- the surrounding area is cleaned of dust and cutting slurry.
It is worth checking or photographing the penetrations in wet areas before tiling, when the tanking is finished and the collars are still visible.
DIY guide: a small round hole in ceramic wall tiles
One or two holes in ordinary ceramic wall tiles, for example for a pipe or a bracket, can be done without a tradesperson. Porcelain, large formats such as large format tile and slab installation (120 x 260 cm), and cut-outs for gullies and drains are better left to a tiler. Sockets and switches in the cut holes should only be connected by a qualified electrician. A new circuit or work in a bathroom is notifiable under Part P, so use an electrician registered with a competent person scheme (e.g. NICEIC or NAPIT) or notify building control before you start. When drilling into fixed tiles, the relevant circuit must be switched off at the consumer unit and the route of the cables and pipes must be known.
The drilling itself follows the same procedure as above. For DIY work, these points matter most:
- Measure the diameter of both the pipe and the rose and buy a tile core bit slightly larger than the pipe but smaller than the rose.
- Check that the core bit is designed for a drill, not an angle grinder, and switch off hammer action.
- Practise starting and drilling on an offcut or a spare tile first.
- Have a water spray bottle and a cloth ready and apply water only at the drilling point.
- Reduce pressure just before breaking through, so the back edge does not chip.
- Fix the tile only after a dry fit.
Wear safety glasses and gloves while working. When cutting with a grinder, also wear a suitable dust mask, because tile dust contains fine silica. In homes built before 2000, have suspect materials tested before you drill or demolish - asbestos insulating board, lagging and sprayed coatings must be removed by an HSE-licensed contractor. When working with water, make sure it does not reach the drill or the extension lead.
Frequently asked questions
The guide price is €12.00 per piece and usually applies to a standard small hole in a ceramic tile. Holes in porcelain and stone, large and shaped cut-outs, and holes added later to finished tiling are usually more expensive.
Yes, it can be done with a core bit and a guide jig or with a slow, angled start. Before drilling, however, the routes of pipes and cables must be established, and water will run down the wall during the work.
Porcelain is a very dense and hard material that can only be ground with diamond. If the work is rushed with more pressure or the wrong speed, the tool overheats and the tile may crack. Slow work with cooling is therefore safer.
Slightly larger than the pipe, to leave room for flexible sealant and for the pipe's thermal expansion. At the same time it must be smaller than the rose that will cover it.
No. Under the tiles, the penetration must be sealed with a tanking collar that connects to the tanking of the wall or floor. Silicone only closes the visible gap and loses its flexibility over time.
A hairline crack can sometimes be hidden by a rose, but water can get through it and it tends to grow over time. The reliable solution is to replace the tile, which is why it pays to keep a few spares.
At least a few from the same batch, and more for hard porcelain, large formats and a larger number of holes. A tile may break during cutting or later during a repair, and the same shade is hard to find after some time.
Related work
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.
How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.
Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.
Blog
Price the whole project, not just one job
Choose items from all trades and NUMIQ turns them into a quote for your own project or your customer's project.