Silicone Sealant Application for Tiles and Paving

Silicone sealant fills the flexible joints at tiled corners and around baths, shower trays, basins and worktops. The guide price is €3.60 per m² of tiling, driven mainly by removing old silicone and the number of short runs.

Updated 09/2026·11 min read·20 price list items
Standard labour price
€3.60/ m²
Indicative range
€2.88 - €4.68
60 m² flat
€540.00
Price for this specific task only - excluding materials and preparatory work. Not the price of the whole job.
Price my renovation
Updated prices
On this page

Building work price list: Silicone Sealant Application for Tiles and Paving

Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.

Tiling20 items

All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.

ItemUnitPrice / unitQuantityTotal

Wall and floor tiling cost

Silicone groutingm²€3.60 / m²m²enter quantity-
Standard wall/floor tiling up to 60 cmm²€39.00 / m²m²enter quantity-
Porcelain tiling over 60 cmm²€49.00 / m²m²enter quantity-
XL format wall/floor tiling 60×120m²m²-
XXL format wall/floor tiling 120×260m²m²-
Mosaic tilingm²m²-
Natural/artificial stone / clinker tilingm²€59.00 / m²m²enter quantity-
Split face stone cladding (fences, plinth)m²m²-
Decorative strip / Listello tilinglm€2.50 / lmlmenter quantity-
Diagonal floor tiling up to 600 mmm²€45.00 / m²m²enter quantity-
Groutingm²€1.90 / m²m²enter quantity-
Siliconing internal corners and edgeslm€1.90 / lmlmenter quantity-
Microcement decorative coating 2-3 mmm²€80.00 / m²m²enter quantity-
Waterjet cutting 60×60 (mitred edge)lm€5.90 / lmlmenter quantity-
Waterjet cutting 120×120 (mitred edge)lm€7.90 / lmlmenter quantity-
Waterjet cutting - tile cut-outlm€10.50 / lmlmenter quantity-
Mitred edge (installation and fitting)lm€59.00 / lmlmenter quantity-
Skirting from tileslm€6.50 / lmlmenter quantity-
Cutting holes in tilespcs€12.00 / pcspcsenter quantity-
Core drilling holes in floor and porcelain tilespcs€12.50 / pcspcsenter quantity-
Total labour
- enter quantity
Create quote from price list →

What silicone sealing is and when it is needed

Silicone sealing is the final step in wall and floor tiling. Silicone fills the joints in corners and around baths, shower trays, basins and worktops. It goes anywhere two different materials meet or two surfaces meet at an angle.

Silicone is needed in two situations:

  • With new wall and floor tiling, once the tiler has finished the cement grouting and the corners and junctions have been left open.
  • When replacing silicone in a bathroom or kitchen, because the old sealant has turned black, come away or started letting water through. Water that gets behind a bath or under a shower tray soaks the wall and floor. Over time it can damage the plaster, the tile adhesive and the ceiling of the flat below.

Where silicone belongs and where cement grout belongs

Why not grout all the tiling with one material? Cement grout is hard and rigid, so it suits the joints between tiles on a single flat surface. In a room corner, where the wall meets the floor or around a bath, the building moves slightly. A bath flexes a little under the weight of water and a person. Floors and walls expand differently as the temperature changes. A rigid joint would crack sooner or later. Flexible silicone absorbs these small movements and the joint stays watertight.

Silicone is therefore used mainly:

  • in bathrooms around the bath, shower tray, basin and WC, and in the internal corners of wall tiling,
  • in kitchens between the worktop and the splashback tiles and around the sink,
  • where floor tiles meet the wall or the skirting,
  • in movement joints in floor tiling, especially on larger areas, terraces and balconies.

The tiler must leave these places open during normal grouting. If cement grout is pressed into a corner first and silicone is only applied on top, the flexibility is lost and the joint cracks. This applies whatever the tile size, whether after standard tiling and paving installation up to 60 cm or with larger formats.

What to decide and prepare in advance

The sealing itself does not take long, but a few things are worth agreeing before the tradesperson arrives. Changing them later means cutting out the finished joint.

  • Colour: standard silicone cannot be painted over, so choose the colour together with the cement grout. Most grout manufacturers offer silicone in matching colours, which gives the bathroom a uniform look. White silicone next to a coloured grout creates a visible frame, which some people like and others do not.
  • Type of silicone: state which materials meet. Natural stone, mirrors, metal trims or an acrylic bath may need a different type than ordinary ceramic tiles.
  • Who supplies the material: agree whether the silicone is bought by the customer or brought by the tradesperson. If buying it yourself, choose the same brand and colour as the grout.
  • Order of work: sealing is done only after the bath, shower tray, basin and kitchen units are fitted and the cement grout has dried. If the bath or worktop is fitted afterwards, the joint has to be redone.
  • Scope of a repair: when replacing old silicone, it pays to redo every joint in the bathroom at once. New silicone next to old is noticeable, and the old sealant is near the end of its life anyway.

Which silicone to choose

DIY stores and builders' merchants stock many types of silicone, and the differences are not just in price and colour. These are the ones most often used with tiling:

  • Sanitary silicone contains anti-mould additives. It belongs in bathrooms, showers and kitchens, wherever there is frequent moisture.
  • Acetoxy silicone is recognisable by its vinegar smell as it cures. It is common and cheaper, but it can attack some metals and mirrors and is not suitable for natural stone.
  • Neutral cure silicone does not release acid while curing. It suits more sensitive materials and is often suitable for outdoor use too.
  • Natural stone silicone is designed for marble, travertine and similar materials, where standard silicone could leave dark, greasy-looking stains along the edges.

Anti-mould additives help, but they do not last forever. With poor ventilation and standing water, mould will still appear on silicone, only later.

How the work is done step by step

The quality of the joint depends on preparation, not on how much sealant is applied. In practice silicone often comes away after just a few months because the surface was not dry or clean.

  1. Preparing the joint. Old silicone is removed completely, including all residue. New silicone does not bond to old. If there is cement grout in a corner, it is raked out to a depth that leaves room for the silicone.
  2. Cleaning and degreasing. The edges are cleaned of dust, soap and grease, usually with methylated spirit or a cleaner recommended by the silicone manufacturer.
  3. Drying. The joint must be dry. Moisture is the most common cause of poor adhesion.
  4. Filling deep joints. A foam backer rod is first pushed into a deep joint. The silicone then bonds only to the two sides and copes better with movement.
  5. Loading the bath. Before sealing a bath, it is filled with water so that it flexes as it does in use. The joint is then not stretched when someone takes a bath.
  6. Masking. Masking tape is applied along both sides of the joint so that the edge is straight and silicone does not get onto the tiles.
  7. Application. The silicone is applied with a sealant gun in one smooth, continuous run without stopping.
  8. Tooling. The bead is smoothed with a rubber profiling tool or a wetted finger into a slightly concave shape, so that water runs off and the edges bond well to both surfaces.
  9. Removing the tape. The tape is pulled off straight after tooling, before the silicone skins over.

Silicone cures gradually. A skin usually forms within a few minutes, but full curing takes much longer depending on the thickness of the joint. It is best not to use the shower or bath for at least a day. The exact time is stated by the manufacturer on the cartridge.

Price of silicone sealing and what affects it

The guide labour price is €3.60 per m². The price relates to the area of wall or floor tiling that the silicone joints belong to. Many tradespeople, however, charge for silicone per linear metre of joint. If a quote is per metre, measure the length of all joints (the perimeter of the bath and shower tray, the corners, the junction with the worktop) and ask for a total price for the whole bathroom or kitchen. This allows quotes to be compared regardless of how each one is calculated. Also ask whether the price includes materials, removal of old silicone and travel. For a small bathroom a minimum call-out charge is common, because the work itself is quick.

The price is affected most by:

  • Removing old, mouldy or firmly bonded silicone. Cutting out, scraping and cleaning off residue often takes longer than applying the new joint, so the work can be roughly twice as demanding as on new tiling.
  • Corners filled with cement grout, which must be raked out first. This is slow hand work and care is needed not to chip the tile edges.
  • Number and length of runs. Many short runs around pipes, taps and shower tray corners mean more masking and more joins, which takes longer than a few long straight joints.
  • Uneven or wide joints, where a backer rod is needed and a straight bead is harder to achieve.
  • Material. Sensitive materials such as natural stone need a special silicone, which costs more and must be applied more carefully.
  • A damp substrate, where it is necessary to wait for it to dry or come back another day.
  • Access. A joint behind a bath against the wall, behind a WC or above a kitchen worktop under wall units takes longer than an open corner.

What makes the job easier and what slows it down

  • A dry bathroom: do not shower or bathe in the bath being sealed for at least a day beforehand. If the joint is wet, the tradesperson has to wait or come back another time.
  • Clear space: remove toiletries, products and appliances from the bath edge, shelves and worktop so that the joint can be reached along its whole length.
  • Warmth and ventilation: the room should be at normal room temperature. Manufacturers usually state application from about 5 °C. In a cold, unheated bathroom silicone cures more slowly.
  • Water supply: filling the bath requires water, so in a new build a working supply is needed.
  • Planning the next day: the shower or bath will be out of use for a while. With only one bathroom, choose a date when this is manageable.

Common mistakes and how they show up later

New silicone over old. It looks quick and tidy, but the joint soon comes away and mould remains underneath.

A damp or greasy surface. The silicone only appears to be bonded. After a few weeks or months the edge lifts and water starts getting under the joint.

Cement grout in the corners. Silicone applied on top has no room to move and cracks, usually along the middle of the bead.

The wrong type of silicone. Acetoxy silicone on stone or next to a mirror can leave stains and damage that cannot be cleaned off.

A bead that is too thin. A thin layer tears easily when the bath moves.

A deep joint without a backer rod. The silicone also bonds to the bottom of the joint, cannot stretch and is more likely to pull away from the edge.

An empty bath during sealing. The first time someone takes a bath, the joint stretches and can tear away from the tiles.

Tape removed too late. The edge of the silicone tears and stays ragged.

Using the shower too soon. Water on uncured silicone can damage its surface.

Silicone is flexible, but it does not last forever. With normal care and regular ventilation it lasts for years. Once black spots appear inside the sealant or the edge comes away, it is time to replace it, as surface cleaning will no longer help.

How to check the finished work

At handover, look at the joints closely and in good light. Check:

  • that the silicone is continuous, without holes, bubbles or gaps,
  • that it has straight edges and an even width along its whole length,
  • that the surface is smooth and slightly concave, without finger marks,
  • that the joins in corners and around taps and pipes are closed, without gaps,
  • that no silicone or tape residue is left on the tiles, bath or taps,
  • that the silicone does not lift when pressed gently at the edge,
  • that the colour matches what was agreed,
  • that the corners under the silicone were free of cement grout,
  • that the agreed type of silicone was used, for example stone or sanitary silicone,
  • that the contractor has said when the shower and bath can be used again.

Replacing the silicone around a bath yourself

Replacing silicone is a manageable DIY job. It takes patience and a few simple tools: a knife or silicone removal tool, methylated spirit, masking tape, a sealant gun, a cartridge of sanitary silicone and a rubber profiling tool.

  1. Cut through the old silicone with a knife along both the tiles and the bath and pull it out. With an acrylic bath, cut carefully so as not to scratch the surface.
  2. Scrape off the residue and remove the rest with a silicone remover, following the instructions.
  3. Clean the joint with methylated spirit and let it dry completely.
  4. Fill the bath with water.
  5. Mask the tiles and the bath edge with masking tape, leaving a gap for the joint.
  6. Cut the cartridge nozzle at an angle to suit the width of the joint.
  7. Apply the silicone in one smooth, continuous run.
  8. Smooth the bead with a profiling tool or a finger dipped in water with a little washing-up liquid.
  9. Pull the tape away from the joint while the silicone is still soft.
  10. Leave the water in the bath until the silicone has at least skinned over, ideally until the next day, and only then drain it. The exact time is stated by the manufacturer on the cartridge.

Use only a little washing-up liquid and do not spray it directly onto the fresh edge of the joint, otherwise the silicone may not bond well at the edges. If removing the old silicone reveals loose tiles behind the bath or a damp wall, new silicone alone will not solve the problem and it is sensible to call in a tiler. An overview of related work is available under tiling services.

Frequently asked questions

As a guide, €3.60 per m² of tiling. If the tradesperson charges per linear metre of joint, ask for a total price. The final cost depends mainly on whether old silicone has to be removed or cement grout raked out of the corners, how many short runs there are around taps and pipes, and which type of silicone is used.