Building work price list: Silicone Sealing of Corners and Joints
Enter quantities and the price recalculates instantly. You can adjust the rates in your price list.
All prices shown exclude VAT. Labour price covers labour only. Price incl. materials adds sundry materials (adhesive, primer, sealants, fixings). Tiles, flooring, paint and sanitaryware are chosen and bought by the client and are not included.
| Item | Unit | Price / unit | Quantity | Total |
|---|---|---|---|---|
Wall and floor tiling cost | ||||
| Siliconing internal corners and edges | lm | €1.90 / lm | lm | enter quantity- |
| Standard wall/floor tiling up to 60 cm | m² | €39.00 / m² | m² | enter quantity- |
| Porcelain tiling over 60 cm | m² | €49.00 / m² | m² | enter quantity- |
| XL format wall/floor tiling 60×120 | m² | m² | - | |
| XXL format wall/floor tiling 120×260 | m² | m² | - | |
| Mosaic tiling | m² | m² | - | |
| Natural/artificial stone / clinker tiling | m² | €59.00 / m² | m² | enter quantity- |
| Split face stone cladding (fences, plinth) | m² | m² | - | |
| Decorative strip / Listello tiling | lm | €2.50 / lm | lm | enter quantity- |
| Diagonal floor tiling up to 600 mm | m² | €45.00 / m² | m² | enter quantity- |
| Grouting | m² | €1.90 / m² | m² | enter quantity- |
| Silicone grouting | m² | €3.60 / m² | m² | enter quantity- |
| Microcement decorative coating 2-3 mm | m² | €80.00 / m² | m² | enter quantity- |
| Waterjet cutting 60×60 (mitred edge) | lm | €5.90 / lm | lm | enter quantity- |
| Waterjet cutting 120×120 (mitred edge) | lm | €7.90 / lm | lm | enter quantity- |
| Waterjet cutting - tile cut-out | lm | €10.50 / lm | lm | enter quantity- |
| Mitred edge (installation and fitting) | lm | €59.00 / lm | lm | enter quantity- |
| Skirting from tiles | lm | €6.50 / lm | lm | enter quantity- |
| Cutting holes in tiles | pcs | €12.00 / pcs | pcs | enter quantity- |
| Core drilling holes in floor and porcelain tiles | pcs | €12.50 / pcs | pcs | enter quantity- |
What silicone sealing is and when it is needed
Flexible sealant belongs wherever two surfaces meet: wall to wall, wall to floor, tiling to a bath, shower tray, basin or kitchen worktop. These joints move slightly in everyday use. Rigid grout does not belong there. A flexible sealant does.
Silicone is normally applied as the final step of tiling work in bathrooms and kitchens, especially where tiling meets a bath, shower tray, basin or another surface. Where movement or corner trims are fitted in the internal corners, silicone is often not needed there. Existing joints are replaced when the silicone turns black with mould, cracks or starts to come away. Typical situations:
- in a new or refurbished bathroom after the wall and floor tiles have been grouted,
- when a bath, shower tray, basin or kitchen units are replaced,
- when an old joint is so badly affected by mould that it can no longer be cleaned,
- when the silicone has lifted at the edge and water is getting in behind the joint.
Why corners are sealed with silicone rather than grouted
Two walls, a wall and a floor, or a bath and a wall each move slightly differently. A bath flexes a little under the weight of water and the person using it, and floors and walls react to temperature and humidity. Rigid grout in a corner will crack in time and water will find its way in. Flexible silicone takes up this movement and the joint stays watertight.
For this reason, corners and joints with the bath are left free of grout during grouting, or the grout is raked out straight away. If hard grout stays in the corner and silicone is simply run over it, the joint has no room to flex. The rigid layer underneath cracks eventually and tears the silicone with it.
Silicone is not waterproofing, however. In a shower and around a bath there must be a tanking system under the tiles, with sealing tape in the corners. Silicone is only the first, visible line of defence. If it is relied on alone, water reaches the wall at the first small crack.
What to decide before sealing
Three things need deciding in advance: which sealant, which colour and which joints. Have all three clear before work starts, because finished silicone cannot be recoloured or changed to another type afterwards.
Which sealant to use and where
- Sanitary silicone is the standard choice for bathrooms and kitchens. It contains fungicide additives and copes well with water. It suits baths, including acrylic ones, showers, basins, sinks and tiled corners.
- Neutral cure silicone is used where ordinary acetoxy silicone could cause damage, for example on sensitive metals or certain plastics. Acetoxy silicone can be recognised by its strong vinegar smell while curing.
- Natural stone silicone is designed for marble, travertine and similar materials. Ordinary silicone can leave dark, oily stains along the edges of stone that cannot be removed.
- Acrylic sealant (decorators' caulk) belongs only in dry areas, for example the joint between a wall and plasterboard or around door linings. It can be painted over, but it is not suitable for showers or baths because it does not withstand water in the long term.
Silicone colour
It is worth matching the silicone colour to the grout. Silicone is made in many shades, so a corner does not have to show a white line between grey grout joints. Silicone cannot be painted, so choose the shade at the outset. When buying the material yourself, get all cartridges in the same shade from one manufacturer so the corners do not differ in colour.
Which joints to seal
Silicone sealing is measured and charged by the running metre, that is, by the length of the joint. Adding up the joints in advance helps when ordering the work:
- horizontal joints around the bath or shower tray, meaning the length of every side that touches a wall,
- vertical internal corners of the tiling from the floor to the top edge of the tiles,
- the wall-to-floor joint, if it is sealed with silicone around the perimeter of the room,
- around the basin, sink, worktop and shower screen.
Example: a 1700 × 750 mm bath fitted between three walls has a wall joint of 1700 + 750 + 750 mm, which is 3.2 running metres. If the bathroom has four vertical corners tiled to a height of 2 m, that adds another 8 running metres. Even a small bathroom can easily exceed 10 running metres of joints, although at first glance it looks like just a few lines.
How the work is done step by step
- Removing old sealant: the old silicone is cut along its edges, pulled out along its full length, and the residue is softened with silicone remover and scraped off with a plastic scraper. With new tiling, leftover grout and adhesive are cleaned out of the corner.
- Cleaning and degreasing: the joint is washed and degreased with isopropyl alcohol or white spirit. White spirit is not used on acrylic baths and plastics, as it can damage the surface. Isopropyl alcohol or a product recommended by the bath manufacturer is enough there. Where there is mould, the surrounding area is treated as well so that no spores are left under the new silicone.
- Drying: the joint must be completely dry. Moisture in the joint or behind the tiles reduces adhesion.
- Backer rod: a foam backer rod is pressed into wide and deep joints so the silicone is not unnecessarily thick and bonds only to the two opposite sides.
- Loading the bath: the bath is filled with water so that it flexes as it does in use. The water stays in until the silicone has cured.
- Masking tape: tape is applied to both sides of the corner, leaving a strip of the required width between them. This is particularly important with stone and glossy tiles, where the edges must stay straight and clean.
- Application: the silicone is applied with a sealant gun in one continuous pass with even pressure and without stopping.
- Smoothing: the joint is smoothed immediately with a profiling tool dipped in smoothing solution or soapy water. The result is a smooth, slightly concave surface.
- Removing the tape: the tape is pulled off straight after smoothing, while the silicone is still soft.
- Curing: the bathroom is ventilated and the joint is left undisturbed according to the manufacturer's instructions, usually for at least 24 hours without contact with water.
What affects the price of silicone sealing
The guide labour price is €1.90 per running metre. This price applies to a standard joint on a clean, dry surface. The final cost mainly depends on the following:
- Removing old silicone: pulling it out, scraping off residue and degreasing often takes longer than applying the new sealant. Silicone heavily affected by mould or covered with a second layer makes the job noticeably more expensive, and the worst joints can take twice as much work.
- Joint width and depth: wide and deep joints need a backer rod and more material. With XL wall and floor tiles 60×120 or large format slabs 120 x 260 cm, the movement joints are often wider than with standard tiles. A normal narrow corner is the cheapest.
- Access: joints behind a bath, under a mixer tap, around a shower screen or in narrow recesses take longer, and some require the screen or accessories to be removed temporarily.
- Sensitive surfaces: natural stone needs a special silicone and tape. An acrylic bath or glossy tiles need careful work without metal tools so nothing gets scratched. Both slow the work down.
- Type of sealant: sanitary silicone is standard, while stone or neutral cure silicone costs more. When getting a quote, ask whether materials are included.
- Small jobs: when only the silicone around one basin is being replaced, some tradespeople do not charge per running metre but apply a minimum call-out charge. It pays to have several joints done at once.
What makes the job easier and what slows it down
Sealing is quickest in a new bathroom where the corners are clean and dry and nobody is using the room yet. In an occupied home, good preparation by the customer helps a great deal:
- clear toiletries, shelves and bath mats from around the bath, shower and basin,
- avoid showering for a few hours before the tradesperson arrives and ventilate the bathroom so the joints are dry,
- plan for the bathroom to be out of use for at least a day and arrange an alternative,
- make sure the room can be ventilated by a window or extractor fan,
- in winter keep the bathroom heated - silicone is generally applied at temperatures above 5 °C and cures more slowly in the cold,
- if buying the material yourself, have the right type and shade of sealant ready in sufficient quantity.
On the other hand, a damp surface slows the work, as it has to be left to dry or the silicone will not bond. If water in a flat has already leaked through to the neighbours below, new silicone alone is not enough. Inform the managing agent or the building's management company and have the real source of the leak checked.
Typical mistakes and how they show later
New silicone over old. New silicone does not bond to old silicone, and mould keeps growing underneath. Within a few weeks the joint lifts or black spots show through. The old sealant must always be removed completely.
Greasy or damp surface. Residues of detergent, soap or limescale, and even fingerprints, reduce adhesion. The silicone then soon comes away at the edge and water gets in behind the joint.
Too thick a bead. Thick silicone takes a long time to cure and can stay soft inside. Deep joints should first be filled with backer rod.
The wrong sealant. Acrylic in a shower absorbs water and goes mouldy, and ordinary silicone on stone leaves stains.
Harsh degreaser on plastic. White spirit or a strong solvent on an acrylic bath can dull or damage the surface. The damage shows immediately and cannot be repaired.
Removing the tape too late. If the tape stays on until the silicone skins over, pulling it off tears pieces out and leaves a ragged edge.
Sealing an empty bath. The joint is then stretched when the bath is first filled and can tear away.
Water before the silicone has cured. The joint can ripple, turn cloudy or be left with marks that can no longer be smoothed out.
Simple maintenance extends the life of the joints: wipe them after showering, ventilate the bathroom and clean with mild products and a soft cloth rather than stiff brushes. When the silicone darkens below the surface, loses its flexibility or comes away, it is time to replace it.
How to check finished silicone sealing
- the joint is continuous along its full length, with no holes, bubbles or gaps,
- the silicone bonds to both surfaces and cannot easily be lifted from the edge with a fingernail,
- the surface is smooth and slightly concave, and the edges are straight,
- there are no dried smears of silicone on the tiles, bath or taps,
- no remains of old sealant or mould show through the new silicone,
- the silicone colour matches the grout and is the same in all corners,
- on stone and sensitive surfaces there are no dark stains along the edges,
- there are no scratches or dull patches from cleaning on an acrylic bath,
- the tradesperson has told you when the shower or bath can be used again.
DIY guide: replacing silicone around a bath or in a shower
A reasonably handy homeowner can replace the silicone around a bath, basin or in a shower enclosure. The method is the same as in the step-by-step section above. Below are the points where first attempts most often go wrong. You will need a sealant gun, a knife or scraper, silicone remover, isopropyl alcohol, masking tape, a silicone profiling tool and a cloth. Expect to leave the shower unused for at least a day afterwards.
- Old silicone: cut carefully along the edges with a knife, and on a bath or shower tray remove residue only with a plastic scraper so the surface is not scratched.
- Cartridge nozzle: cut at an angle, with an opening matching the joint width. A small opening can always be enlarged, but one that is too big cannot be made smaller.
- Sealant gun: hold it at a constant angle and move it at an even speed. Practising a run on a piece of cardboard before the first joint helps.
- Excess: while smoothing, wipe it continuously from the tool onto the cloth so it is not spread over the tiles.
- Tape: pull it off straight after smoothing, drawing it away from the joint at an angle.
If the silicone starts to skin over and the joint has not turned out well, do not try to patch it. It is easier to pull it all out and apply a new bead. If damp walls, loose tiles or signs of leaks are found under the old silicone, new silicone will not solve the problem, and it is sensible to have a tiler assess the bathroom, for example as part of tiling installation up to 60 cm if tiles need replacing.
Frequently asked questions
The guide price is €1.90 per running metre. It costs more if mouldy old silicone has to be removed, if the joints are wide, deep or hard to reach, or if natural stone is involved.
The surface of the silicone usually skins over within tens of minutes, but it cures gradually inside. Most manufacturers advise avoiding water for at least 24 hours, and longer for thicker joints. The exact time is given on the cartridge.
Surface staining often disappears with a mould cleaner. If the mould has grown into the silicone and black spots remain after cleaning, only replacing the whole joint will help.
Only once the grout has dried according to its manufacturer's instructions and the corners are clean and dry. Silicone sealing is the last step of the tiling work, and it should not be followed by cleaning the corners with water and detergent.
It depends on ventilation, maintenance and the quality of the sealant. In a well-ventilated bathroom, good sanitary silicone lasts for years, while in a shower without ventilation it can fail much sooner. Its condition matters, not the calendar.
Silicone seals the joint at the surface, but it does not replace the tanking under the tiles. If water is getting into the wall or through to the neighbours, the cause must be found and repaired, for example damaged waterproofing or a leaking waste.
Related work
How wall and floor tiles up to 60 cm are laid, what the substrate needs, which adhesive to choose, common mistakes and how to check the work.
How 60×120 wall and floor tiles are laid: preparing the substrate, adhesive, levelling clips, cutting, typical mistakes and checking the finished work.
How 120 x 260 cm tiles and slabs are laid, what the wall or floor underneath must be like, which tools are used and what to check at handover.
Mosaic tiling in bathrooms, showers and kitchens. How it is laid, which adhesive and grout to choose, what makes it harder and how to check the result.
How wall and floor tiles are grouted, which grout to choose, the mistakes to avoid and how to check finished grout lines.
Where silicone belongs instead of grout, which type to choose, how to apply it neatly and how to check finished joints in bathrooms and kitchens.